Serial Number | 79111000 |
Word Mark | ZIV |
Filing Date | Thursday, October 6, 2011 |
Status | 709 - CANCELLED - SECTION 71 |
Status Date | Friday, September 22, 2023 |
Registration Number | 4296844 |
Registration Date | Tuesday, March 5, 2013 |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, December 18, 2012 |
Goods and Services | Apparatus, equipment and systems for digital protection, controlling, measuring and monitoring electric power networks, namely, electric relays, electric couplings, commutators, electricity limiters, electric connections, electric connection boxes, electric distribution boxes, electric junction boxes, wiring boards, connections, electric sensors, electric contacts, electric switchboxes, electric control panels, electrical switches, electrical counters, computer memories, circuit breakers, electric converters, current rectifiers, electrical boosters, printed circuits, light conducting filaments, optical fibbers, boiler control instruments, electric loss indicators, time recording apparatus, electricity indicators, electric installations for the remote control of industrial operations, electrodynamic apparatus for the remote control of signals, measures, ammeters, voltmeters, electric measuring apparatus, ohmmeters, frequency meters, galvanometers, automatic time switches, electric contacts, electric terminals, electric wire connectors, connectors for electric lines, electric socket housings, chargers for electric batteries, telerupters, electric inverters, measuring instruments, electrical gauges for measuring electricity levels, callipers for measuring electricity, revolution counters, telecommunication transmitters, electronic signal transmitters, downloadable computer software for controlling the aforementioned apparatus, equipment and systems |
Description of the Colors Claimed | The trademark is made up of the word "ZIV" in wide, upper-case letters outlined in black and divided in the middle by a wavy white line, which is thicker in some parts than in others, splitting it into two halves. The upper half is deep-red and the lower half is gray. |
Goods and Services | Building construction, namely, custom construction of electricity generating installations for others, maintenance and repair of voltage surge protectors and overvoltage protection systems, installing protection systems and monitoring systems in connection with electric equipment |
Indication of Colors claimed | The color(s) deep-red, gray, white and black is/are claimed as a feature of the mark. |
Goods and Services | Planning, design and development of installations for generating power for others, development for others of protection systems and monitoring systems and monitoring services in connection with electric equipment, computer software programming for monitoring and controlling electric power systems, industrial design services and designer services in connection with generating electric power and advice regarding all of the aforementioned services; advice in relation to construction and diagnostic services in connection with electricity generating installations and voltage surge protectors, diagnostic services in connection with equipment and installations for generating, transmitting and distributing power |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 22, 2023 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 22, 2023 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 22, 2023 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | ZIV APLICACIONES Y TECNOLOGIA, S.L. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | ZamudÃo (Vizcaya) E-48016 ES |
Party Name | ZIV APLICACIONES Y TECNOLOGIA, S.L. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | ES |
Party Name | ZIV APLICACIONES Y TECNOLOGIA, S.L. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | ES |
Event Date | Event Description |
Saturday, April 14, 2012 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Wednesday, October 31, 2012 | TEAS PETITION TO REVIVE RECEIVED |
Monday, April 16, 2012 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
Tuesday, April 17, 2012 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, April 17, 2012 | ASSIGNED TO EXAMINER |
Saturday, April 21, 2012 | APPLICATION FILING RECEIPT MAILED |
Wednesday, April 25, 2012 | NON-FINAL ACTION WRITTEN |
Thursday, April 26, 2012 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, April 30, 2012 | REFUSAL PROCESSED BY MPU |
Monday, April 30, 2012 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Saturday, May 19, 2012 | REFUSAL PROCESSED BY IB |
Wednesday, October 31, 2012 | PETITION TO REVIVE-GRANTED |
Wednesday, October 31, 2012 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, November 28, 2012 | NOTICE OF PUBLICATION |
Wednesday, November 28, 2012 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, November 28, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Tuesday, December 18, 2012 | PUBLISHED FOR OPPOSITION |
Wednesday, October 31, 2012 | NOTICE OF REVIVAL - MAILED |
Wednesday, November 7, 2012 | ASSIGNED TO LIE |
Wednesday, November 14, 2012 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, November 14, 2012 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, November 14, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, November 15, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Wednesday, June 5, 2013 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Wednesday, January 30, 2013 | NOTIFICATION PROCESSED BY IB |
Tuesday, March 5, 2013 | REGISTERED-PRINCIPAL REGISTER |
Friday, October 18, 2013 | FINAL DISPOSITION PROCESSED |
Friday, October 18, 2013 | FINAL DISPOSITION NOTICE SENT TO IB |
Wednesday, November 13, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, September 5, 2019 | TEAS SECTION 71 & 15 RECEIVED |
Monday, September 23, 2019 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Thursday, December 9, 2021 | INTERNATIONAL REGISTRATION RENEWED |
Friday, July 22, 2022 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, October 3, 2019 | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. |
Thursday, October 3, 2019 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED |
Saturday, April 10, 2021 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, March 5, 2022 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED |
Friday, July 22, 2022 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Friday, July 22, 2022 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Friday, July 22, 2022 | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS |
Monday, April 10, 2023 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, June 14, 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Sunday, July 14, 2024 | TOTAL INVALIDATION PROCESSED BY THE IB |
Thursday, June 20, 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Friday, September 22, 2023 | CANCELLED SECTION 71 |
Thursday, June 20, 2024 | INVALIDATION PROCESSED |