Serial Number | 79115445 |
Word Mark | ZHONG CHENG |
Filing Date | Monday, February 13, 2012 |
Status | 404 - IR CANCELLED - US REGISTRATION CANCELLED |
Status Date | Sunday, February 13, 2022 |
Registration Number | 4284513 |
Registration Date | Tuesday, February 5, 2013 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, November 20, 2012 |
Description of Mark | The mark consists of the wording "ZHONG CHENG" and Chinese characters (which transliterate to "ZHONG CHENG") appearing inside a rectangle. The rectangle appears below a shaded oval with a design that consists of three triangles and a vertical rectangle that is slanted to the right. |
Goods and Services | Glass for building; windows and doors made primarily of glass and also containing fiber reinforced plastics; alabaster glass; building glass; window glass except glass for vehicle windows; window glass, for building; safety glass for building purposes; coated glass for building; insulating glass for construction purposes |
Goods and Services | Common metals, namely, copper, unwrought or semi-wrought, for further manufacture; works of art of common metal; exterior roller blinds of steel for guiding light; reinforcing materials of metal for pipes for building purposes; railway material of metal for railway construction; non-electric wire of common metal; tree protectors of metal; rods of metal for brazing; upright signboards of common metal |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Transliteration Statement | The transliteration of the two Chinese characters appearing in the trademark is "ZHONG CHENG". |
Translation of Words in Mark | The translation of the first Chinese character is "MIDDLE"; the translation of the second Chinese character is "HONEST'; but the two Chinese characters as a whole have no meaning. |
Goods and Services | Semi-finished Glass for vehicle windows; enamelled glass for vehicle windows; plate glass for cars; glass, unworked and semi-worked, except building glass; mosaics of glass, not for buildings; opal glass; toughened glass not for building; tempered glass not for building; shatterproof glass not for building |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 6, 2019 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 6, 2019 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 021 - Household or kitchen utensils and containers; combs and sponges; brushes (except paint brushes); brush-making materials; articles for cleaning purposes; steel-wool; unworked or semi-worked glass (except glass used in building); glassware, porcelain and earthenware not included in other classes. |
US Class Codes | 002, 013, 023, 029, 030, 033, 040, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 6, 2019 |
Primary Code | 021 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | JIANGSU ZHONGCHENG BUILDING MATERIAL GROUP CO., LTD. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | Jiangsu Province CN |
Party Name | JIANGSU ZHONGCHENG BUILDING MATERIAL GROUP CO., LTD. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | Jiangsu Province CN |
Party Name | JIANGSU ZHONGCHENG; BUILDING MATERIAL GROUP CO., LTD. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | CN |
Event Date | Event Description |
Saturday, September 10, 2022 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED |
Saturday, September 10, 2022 | DEATH OF INTERNATIONAL REGISTRATION |
Friday, July 17, 2020 | TOTAL INVALIDATION PROCESSED BY THE IB |
Monday, June 15, 2020 | GENERIC MADRID TRANSACTION SENT TO IB |
Monday, June 15, 2020 | GENERIC MADRID TRANSACTION CREATED |
Wednesday, May 6, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, September 6, 2019 | CANCELLED SECTION 71 |
Sunday, May 26, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Monday, May 6, 2013 | FINAL DISPOSITION NOTICE SENT TO IB |
Monday, May 6, 2013 | FINAL DISPOSITION PROCESSED |
Sunday, May 5, 2013 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, February 5, 2013 | REGISTERED-PRINCIPAL REGISTER |
Monday, November 26, 2012 | NOTIFICATION PROCESSED BY IB |
Tuesday, November 20, 2012 | PUBLISHED FOR OPPOSITION |
Wednesday, October 31, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, October 31, 2012 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, October 31, 2012 | NOTICE OF PUBLICATION |
Tuesday, October 16, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Monday, October 15, 2012 | ASSIGNED TO LIE |
Monday, October 1, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, September 28, 2012 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, September 28, 2012 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, September 28, 2012 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Saturday, September 1, 2012 | REFUSAL PROCESSED BY IB |
Thursday, August 16, 2012 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, August 16, 2012 | REFUSAL PROCESSED BY MPU |
Wednesday, August 15, 2012 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, August 14, 2012 | NON-FINAL ACTION WRITTEN |
Tuesday, August 14, 2012 | APPLICATION FILING RECEIPT MAILED |
Friday, August 10, 2012 | ASSIGNED TO EXAMINER |
Friday, August 10, 2012 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, August 9, 2012 | SN ASSIGNED FOR SECT 66A APPL FROM IB |