Serial Number | 86305260 |
Word Mark | YUHONG |
Filing Date | Tuesday, June 10, 2014 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Friday, April 24, 2015 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Adhesive materials for the building industry and tiles; Adhesive primers for use in roofing; Adhesives and glues for industrial purposes; Adhesives for applying floor tiles; Adhesives for applying wall coverings; Adhesives for cement manufactured products; Adhesives for ceramic coating and ornamental paving; Adhesives for floor, ceiling and wall tiles; Adhesives for industrial purposes; Adhesives for laying ceramic tiles; Adhesives for paper hanging; Gelatine glue; Oil cement |
Translation of Words in Mark | The English translation of YUHONG in the mark is RAINBOW. |
International Class | 001 - Chemicals used in industry, science and photography, as well as in agriculture, horticulture and forestry; unprocessed artificial resins; unprocessed plastics; manures; fire extinguishing compositions; tempering and soldering preparations; chemical substances for preserving foodstuffs; tanning substances; adhesives used in industry. |
US Class Codes | 001, 005, 006, 010, 026, 046 |
Class Status Code | 6 - Active |
Class Status Date | Friday, June 20, 2014 |
Primary Code | 001 |
First Use Anywhere Date | Sunday, October 1, 1995 |
First Use In Commerce Date | Tuesday, November 1, 2011 |
Party Name | Beijing Oriental Yuhong Waterproof Technology Co. Ltd. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Chaoyang, Beijing 100023 CN |
Event Date | Event Description |
Friday, April 24, 2015 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Friday, April 24, 2015 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Tuesday, November 4, 2014 | ASSIGNED TO EXAMINER |
Friday, September 26, 2014 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, September 26, 2014 | NON-FINAL ACTION E-MAILED |
Friday, September 26, 2014 | NON-FINAL ACTION WRITTEN |
Friday, September 19, 2014 | ASSIGNED TO EXAMINER |
Friday, June 20, 2014 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Friday, June 13, 2014 | NEW APPLICATION ENTERED IN TRAM |