Serial Number | 78190546 |
Word Mark | XELLA |
Filing Date | Tuesday, December 3, 2002 |
Status | 800 - REGISTERED AND RENEWED |
Status Date | Tuesday, November 15, 2016 |
Registration Number | 3144126 |
Registration Date | Tuesday, September 19, 2006 |
Mark Drawing | 1000 - Typeset: Word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, March 14, 2006 |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | [ metal building materials, namely, soffits, faccia, vents, trims, facades, armoring, reinforcements, reinforcement mattresses; welded wire meshes for reinforced concrete and reinforcing cages made therefrom; ] ironmongery, namely, wire clamps, band claims, tie bolts, grappling iron, screws, nails and bolts |
Goods and Services | [ heat insulating materials, in particular of mineral wool and rigid expanded plastic; ] packing, stopping and insulating materials to be used in the building industry, namely, insulating paints, coatings and wall coverings |
Goods and Services | non-metallic building materials, namely, stones, floor slabs, wall slabs, roof slabs, wall panels, wall elements; [ construction materials, in particular mineral raw materials, in particular limestone for use in the building industry; lime- and sandstones; ] artificial stones, in particular porous artificial stones; porous concrete; Lightweight concrete; foamed concrete; concrete; hollow blocks; mortar; [ building material made of clay, in particular bricks and roofing tiles; natural stones; cement; lime; pebbles; gypsum; pipe tissue; pitch; asphalt; tar; roofing cardboard; felt sheets and underfelts for building purposes; wood and bricks for building purposes; tiles, namely, ceramic tiles, non-metal roofing tiles; limestone grit, limestone sand, limestone chips and limestone powder as well as coarse limestone; burnt lime, lump lime, lime powder and hydrated lime; blast furnace slag chips, grit and sands, natural stone gravel and grit, hydraulic construction stones, pebbles, pebble grits, pebble sands, paving stones; ] products for plastering and insulating building surfaces, in particular facing plaster, adhesive plaster and interior plaster based on [ lime, ] cement [ or gypsum with or ] without plastic additives, dry mortar with or without plastic additives, dry mortar and dry concrete; [ bulk material for leveling floors, in particular of gas concrete; prefabricated movable houses and structural members, not of metal, both in particular of porous concrete, lightweight concrete and foamed concrete, lime- and sandstones as well as calcareous sandstone; ] prefabricated parts, not of metal, in particular prefabricated parts of concrete, namely, plates for interior works; [ gypsum fiber boards for the completion of the interior, ceiling elements and movable separating walls not of metal, in particular of gypsum fiber boards, ] cladding panels [ and curtain walls of plastic; reinforced concrete solidium chimneys and parts thereof - not of metal; construction materials, in particular calcareous sandstone, ] sand- lime bricks, large sized building plates, in particular made of calcareous sandstone and/or autoclav aerated concrete; [ prefabricated movable houses and structural members, not of metal, both in particular of calcareous sandstone; prefabricated parts, not of metal, in particular plates for interior works ] |
Goods and Services | Building construction; building project verification; Consulting for planning and performing building projects, in particular with regard to building materials selection, measuring and assessing buildings; Building and construction planning and advising, arranging for craftsman services; Overground and underground construction as well as [ civil engineering works, ] building industrial systems, construction of halls; building and construction planning and advising; [ planning and building type houses, typified functional buildings and carcasses, also using construction kits and carcass systems, as well as consulting therefore; ] Consultation in the establishment of construction planning systems, in particular constructing planning module systems and auxiliary documents for construction planning |
Goods and Services | Architectural design and building engineering services; Technical consulting and expert opinions in the field of engineering, architectural design and building construction; [ Materials testing for others; Providing temporary use of an online non-downloadable construction planning systems comprising computerized construction planning modules for the design and modeling of building constructions and for generating auxiliary documents for use in construction planning ] |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, December 23, 2002 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
US Class Codes | 001, 005, 012, 013, 035, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, December 23, 2002 |
Primary Code | 017 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, December 23, 2002 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Monday, December 23, 2002 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Monday, December 23, 2002 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | XELLA INTERNATIONAL GMBH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | 47259 DUISBURG DE |
Party Name | XELLA INTERNATIONAL GMBH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | DUISBURG 47119 DE |
Party Name | XELLA INTERNATIONAL GMBH |
Party Type | 11 - New Owner Before Publication |
Legal Entity Type | 99 - Other |
Address | DUISBURG 47119 DE |
Party Name | Haniel Bau - Industrie GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Duisburg 47119 DE |
Event Date | Event Description |
Monday, February 5, 2018 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Monday, February 5, 2018 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Tuesday, November 15, 2016 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED |
Tuesday, November 15, 2016 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) |
Tuesday, November 15, 2016 | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED |
Tuesday, November 15, 2016 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Thursday, September 1, 2016 | TEAS SECTION 8 & 9 RECEIVED |
Saturday, September 19, 2015 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED |
Tuesday, March 26, 2013 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED |
Tuesday, March 26, 2013 | REGISTERED - SEC. 8 (6-YR) ACCEPTED |
Tuesday, March 26, 2013 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Tuesday, March 12, 2013 | TEAS SECTION 8 RECEIVED |
Tuesday, September 19, 2006 | REGISTERED-PRINCIPAL REGISTER |
Friday, July 28, 2006 | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED |
Wednesday, April 12, 2006 | EXTENSION OF TIME TO OPPOSE RECEIVED |
Tuesday, March 14, 2006 | PUBLISHED FOR OPPOSITION |
Wednesday, February 22, 2006 | NOTICE OF PUBLICATION |
Tuesday, January 31, 2006 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Tuesday, January 31, 2006 | ASSIGNED TO LIE |
Thursday, January 12, 2006 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, January 12, 2006 | EXAMINERS AMENDMENT E-MAILED |
Thursday, January 12, 2006 | EXAMINERS AMENDMENT -WRITTEN |
Wednesday, August 31, 2005 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Tuesday, August 23, 2005 | NON-FINAL ACTION E-MAILED |
Tuesday, August 23, 2005 | NON-FINAL ACTION WRITTEN |
Monday, August 1, 2005 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
Friday, July 29, 2005 | WITHDRAWN BEFORE PUBLICATION |
Monday, July 11, 2005 | PAPER RECEIVED |
Thursday, May 12, 2005 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Thursday, May 12, 2005 | ASSIGNED TO LIE |
Tuesday, May 3, 2005 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, March 18, 2005 | AMENDMENT FROM APPLICANT ENTERED |
Tuesday, March 1, 2005 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, March 1, 2005 | PAPER RECEIVED |
Friday, January 28, 2005 | INQUIRY TO SUSPENSION E-MAILED |
Friday, January 28, 2005 | SUSPENSION INQUIRY WRITTEN |
Wednesday, October 20, 2004 | LIE CHECKED SUSP - TO ATTY FOR ACTION |
Monday, August 30, 2004 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Tuesday, March 30, 2004 | UNRESPONSIVE/DUPLICATE PAPER RECEIVED |
Tuesday, March 30, 2004 | EMAIL RECEIVED |
Friday, January 9, 2004 | LETTER OF SUSPENSION E-MAILED |
Monday, November 3, 2003 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, November 3, 2003 | PAPER RECEIVED |
Monday, September 22, 2003 | UNRESPONSIVE/DUPLICATE PAPER RECEIVED |
Tuesday, September 23, 2003 | EMAIL RECEIVED |
Monday, June 16, 2003 | NON-FINAL ACTION E-MAILED |
Thursday, June 12, 2003 | ASSIGNED TO EXAMINER |