Serial Number | 97141917 |
Word Mark | WRC WESTERN REFRACTORY |
Filing Date | Wednesday, November 24, 2021 |
Status | 654 - REPORT COMPLETED SUSPENSION CHECK - CASE STILL SUSPENDED |
Status Date | Wednesday, March 27, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Welding services, namely, welding, metal fabrication, metal prefabrication, and structural steel fabrication; thermal lancing services, namely, high temperature cutting thicker steel, brick and concrete |
Description of Mark | The mark consists of stylized wording WESTEN REFRACTORY and stylized letters WRC positioned above the wording WESTERN REFRACTORY wherein the letters WR are placed inside the letter C; both the stylized letters WRC and the stylized wording WESTERN REFRACTORY are positioned inside the triangle containing rounded corners. |
Goods and Services | Factory and industrial plant construction services; construction services in the field of refractory services, namely, installation, repair, and maintenance, and demolition of refractory linings in high temperature vessels; installation of insulation for firestopping and structural fireproofing; specialty mechanical construction services in the nature of machinery and equipment installation, process piping, tank and vessel installation; boiler repair services; installation of building scaffolds, working platforms, and building platforms; construction services, namely, applying refractory coatings resistant to thermal shocks and high temperatures; construction and maintenance of buildings and industrial plants; specialty civil construction services in the nature of installation of precast concrete slabs, building foundations, piers, and pedestals; constructions site grading services; construction services, namely, excavation; excavation services, namely, hydro excavation; pipeline right of way maintenance; installation of oil and gas refining equipment, namely, installation of Fluidized Catalytic Cracking Units (FCCU) and Sulfur Recover Units (SRU); erection of structural steel buildings; construction project management services; construction project oversight services, namely, client and contractor liaison, project management, project coordination, progress reviews, site visits for progress review, project management review of project change orders and oversight of third-party building construction inspections; construction project management services, namely, establishing scheduling parameters for construction projects |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Business management services for construction projects, namely, project development and program management; project budget development, cost tracking of construction, equipment, and soft costs for others for cost accounting purposes and logistics coordination |
NOT AVAILABLE | "REFRACTORY" |
Goods and Services | Industrial inspection of equipment and machinery in the oil and gas, petrochemical, chemical, power, and refinery industries; hydrotesting of equipment and machinery in the oil and gas, petrochemical, chemical, power, and refinery industries; quality assessment service and quality management services, namely, quality evaluation and analysis, quality assurance, and quality control, in the field of construction; analysis, testing, evaluation and verification of products, components, materials, services, methods, and quality-control procedures of others to determine conformity with certification standards; analysis, testing, evaluation and verification of products, components, materials, services, methods, and quality-control procedures of others for compliance with industry standards related to the construction of buildings; engineering drawing services for construction of shops; architect services, namely, as-built drawing preparation; construction project oversight services, namely, quality assurance reviews |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, November 30, 2021 |
Primary Code | 040 |
First Use Anywhere Date | Friday, December 31, 1993 |
First Use In Commerce Date | Friday, December 31, 1993 |
International Class | 035 - Advertising; business management; business administration; office functions. |
US Class Codes | 100, 101, 102 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, November 30, 2021 |
Primary Code | 035 |
First Use Anywhere Date | Friday, December 31, 1993 |
First Use In Commerce Date | Friday, December 31, 1993 |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, November 30, 2021 |
Primary Code | 037 |
First Use Anywhere Date | Friday, December 31, 1993 |
First Use In Commerce Date | Friday, December 31, 1993 |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, November 30, 2021 |
Primary Code | 042 |
First Use Anywhere Date | Friday, December 31, 1993 |
First Use In Commerce Date | Friday, December 31, 1993 |
Party Name | Western Refractory Construction, Incorporated |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Longmont, CO 80504 |
Event Date | Event Description |
Saturday, November 27, 2021 | NEW APPLICATION ENTERED |
Tuesday, November 30, 2021 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Wednesday, December 1, 2021 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Tuesday, September 6, 2022 | ASSIGNED TO EXAMINER |
Tuesday, September 13, 2022 | NON-FINAL ACTION WRITTEN |
Tuesday, September 13, 2022 | NON-FINAL ACTION E-MAILED |
Tuesday, September 13, 2022 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, February 16, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, February 16, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, February 17, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, September 26, 2023 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Wednesday, March 27, 2024 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Tuesday, February 21, 2023 | SUSPENSION LETTER WRITTEN |
Tuesday, February 21, 2023 | LETTER OF SUSPENSION E-MAILED |
Tuesday, February 21, 2023 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Saturday, May 4, 2024 | TEAS WITHDRAWAL OF ATTORNEY RECEIVED |
Saturday, May 4, 2024 | WITHDRAWAL OF ATTORNEY GRANTED |
Tuesday, November 19, 2024 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |