
| Serial Number | 79137218 |
| Word Mark | WOLF BAVARIA |
| Filing Date | Friday, July 5, 2013 |
| Status | 404 - IR CANCELLED - US REGISTRATION CANCELLED |
| Status Date | Thursday, July 6, 2023 |
| Registration Number | 5319127 |
| Registration Date | Tuesday, October 31, 2017 |
| Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | Tuesday, August 15, 2017 |
| Description of Mark | The mark consists of a stylized wording "WOLF BAVARIA" in two lines. The word "WOLF" is presented in stylized capital letters using bold font on the first line. The stylized lettering contains a visible, thick border. The letter "O" in "WOLF" is represented by two concentric circles, superimposed on a hazy background. Below the word "WOLF" is the word "BAVARIA" presented in smaller font beneath the letters "WO". All letters of "BAVARIA" are presented in lower-case lettering except the letter "B", which is presented in capital lettering. |
| Goods and Services | Non-metallic floor, wall and ceiling panels; Building materials, namely, non-metallic pipe supports and joints and expansion joints for floors and walls; Non-metallic fire-resistant construction materials in the form of fire protection floor, wall or ceiling components as well as enclosure components, namely, fire-resistant boards and panels; Construction materials, namely, non-metallic exterior boards with internal multi-layer undulating or honeycomb structures |
| Goods and Services | Material for thermal insulation and fire protection, namely, fire-resistant composite panels, insulating materials and soundproofing materials made of sand, fibers, wool and paper; Insulating materials made of mineral cardboard, pulp cardboard and corrugated cardboard for use in insulation and enclosure of floors, walls and ceiling; Sound absorbing flooring underlayment; Thermally bonded cotton batting used as a sound deadening material; Noise insulation walls |
| Indication of Colors claimed | Color is not claimed as a feature of the mark. |
| Disclaimer with Predetermined Text | "BAVARIA" |
| International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
| US Class Codes | 001, 005, 012, 013, 035, 050 |
| Class Status Code | H - NOT AVAILABLE |
| Class Status Date | Thursday, July 6, 2023 |
| Primary Code | 017 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | H - NOT AVAILABLE |
| Class Status Date | Thursday, July 6, 2023 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | NOT AVAILABLE |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 01 - Individual |
| Address | DE |
| Party Name | NOT AVAILABLE |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 01 - Individual |
| Address | DE |
| Party Name | NOT AVAILABLE |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 01 - Individual |
| Address | DE |
| Event Date | Event Description |
| Sunday, January 21, 2024 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED |
| Sunday, January 21, 2024 | DEATH OF INTERNATIONAL REGISTRATION |
| Tuesday, November 1, 2022 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Tuesday, November 1, 2022 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
| Tuesday, November 1, 2022 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
| Monday, October 31, 2022 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
| Friday, April 6, 2018 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Thursday, February 8, 2018 | FINAL DISPOSITION NOTICE SENT TO IB |
| Thursday, February 8, 2018 | FINAL DISPOSITION PROCESSED |
| Wednesday, January 31, 2018 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Friday, November 3, 2017 | NOTIFICATION PROCESSED BY IB |
| Tuesday, October 31, 2017 | REGISTERED-PRINCIPAL REGISTER |
| Tuesday, August 15, 2017 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Tuesday, August 15, 2017 | PUBLISHED FOR OPPOSITION |
| Wednesday, July 26, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Wednesday, July 26, 2017 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, July 26, 2017 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Thursday, July 13, 2017 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
| Wednesday, July 12, 2017 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Thursday, June 29, 2017 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
| Thursday, June 29, 2017 | ASSIGNED TO LIE |
| Monday, January 30, 2017 | ASSIGNED TO EXAMINER |
| Thursday, December 15, 2016 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
| Thursday, June 9, 2016 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
| Thursday, December 3, 2015 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
| Monday, May 25, 2015 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
| Monday, May 18, 2015 | ASSIGNED TO LIE |
| Friday, April 3, 2015 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Wednesday, March 18, 2015 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Wednesday, March 18, 2015 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Sunday, November 16, 2014 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
| Thursday, May 15, 2014 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
| Thursday, May 15, 2014 | LETTER OF SUSPENSION E-MAILED |
| Thursday, May 15, 2014 | SUSPENSION LETTER WRITTEN |
| Thursday, April 24, 2014 | NEW REPRESENTATIVE AT IB RECEIVED |
| Tuesday, April 22, 2014 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, April 22, 2014 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, April 22, 2014 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Saturday, November 23, 2013 | REFUSAL PROCESSED BY IB |
| Friday, November 1, 2013 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Thursday, October 31, 2013 | REFUSAL PROCESSED BY MPU |
| Wednesday, October 30, 2013 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Tuesday, October 29, 2013 | NON-FINAL ACTION WRITTEN |
| Friday, October 25, 2013 | APPLICATION FILING RECEIPT MAILED |
| Monday, October 21, 2013 | ASSIGNED TO EXAMINER |
| Monday, October 21, 2013 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Friday, October 18, 2013 | SN ASSIGNED FOR SECT 66A APPL FROM IB |