Serial Number | 79083733 |
Word Mark | WIND BLADE |
Filing Date | Thursday, February 11, 2010 |
Status | 404 - IR CANCELLED - US REGISTRATION CANCELLED |
Status Date | Wednesday, February 12, 2020 |
Registration Number | 3903318 |
Registration Date | Tuesday, January 11, 2011 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, October 26, 2010 |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "WIND BLADE" |
Description of Mark | The mark consists of the wording "WIND BLADE" with the design of a windmill propeller, the center of which is the dot of the letter "I". |
Goods and Services | Machinery and equipment for the generation of regenerative energy, namely, wind-powered electricity generators, windmills, wind turbines, wind diesel plants, and parts for the foregoing goods in the nature of rotor blades, towers, masts, rotor consoles, machine housings, rotor control devices and gears |
Goods and Services | Electrical power plants, appliances and instruments for wind power energy plants, namely, generators, switching devices, namely, high frequency switching power supplies, control gear, and measuring, signaling, and control instruments, namely, control and monitoring software |
Goods and Services | Engineering services, namely, development, design, calculation, and load simulation concerning wind power energy plants; Engineering services, namely, design, development, calculation, and load simulation concerning water treatment plants and sea water desalination plants; Engineering services, namely, design and development of rotor blades, rotors, towers, and further components of wind power energy plants; Preparation of technical expert opinions concerning wind power energy plants; Material testing concerning wind power energy plants; Testing of wind power energy plants; Engineering services, namely, technical project planning of wind power energy plant projects; Research in the field of wind power energy generation; Design and development of software used in the operation of wind power energy plants; Technical consulting in the field of wind power energy plants |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, August 18, 2017 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, August 18, 2017 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, August 18, 2017 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | WINDnovation Engineering Solutions GmbH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 16 - Limited Liability Company |
Address | DE |
Party Name | WINDnovation Engineering; Solutions GmbH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | DE |
Party Name | WINDnovation Engineering; Solutions GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | DE |
Event Date | Event Description |
Friday, September 4, 2020 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED |
Friday, September 4, 2020 | DEATH OF INTERNATIONAL REGISTRATION |
Saturday, May 19, 2018 | TOTAL INVALIDATION PROCESSED BY THE IB |
Friday, April 20, 2018 | GENERIC MADRID TRANSACTION SENT TO IB |
Friday, April 20, 2018 | GENERIC MADRID TRANSACTION CREATED |
Wednesday, April 18, 2018 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, August 18, 2017 | CANCELLED SECTION 71 |
Monday, January 11, 2016 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Tuesday, February 19, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, August 30, 2012 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Thursday, August 30, 2012 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Tuesday, May 10, 2011 | FINAL DISPOSITION NOTICE SENT TO IB |
Tuesday, May 10, 2011 | FINAL DISPOSITION PROCESSED |
Monday, April 11, 2011 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, January 11, 2011 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, October 26, 2010 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, October 26, 2010 | PUBLISHED FOR OPPOSITION |
Tuesday, September 21, 2010 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Tuesday, September 21, 2010 | ASSIGNED TO LIE |
Thursday, September 16, 2010 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, September 15, 2010 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, September 15, 2010 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, September 15, 2010 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, August 6, 2010 | REFUSAL PROCESSED BY IB |
Monday, July 19, 2010 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, July 16, 2010 | REFUSAL PROCESSED BY MPU |
Friday, July 16, 2010 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, July 16, 2010 | APPLICATION FILING RECEIPT MAILED |
Thursday, July 15, 2010 | NON-FINAL ACTION WRITTEN |
Monday, July 12, 2010 | ASSIGNED TO EXAMINER |
Monday, July 12, 2010 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Friday, July 9, 2010 | SN ASSIGNED FOR SECT 66A APPL FROM IB |