Serial Number | 99005258 |
Word Mark | VISTA HARDWARE |
Filing Date | Friday, January 17, 2025 |
Status | 641 - NON-FINAL ACTION - MAILED |
Status Date | Monday, July 7, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
NOT AVAILABLE | The non-Latin characters in the mark transliterate to Vista Hardware and this has no meaning in a foreign language. |
Goods and Services | Anchors; Andirons; Brackets of metal for building; Construction elements made of metal, namely, braces; Construction elements made of metal, namely, fabricated metal components for building foundations; Eye bolts; Furniture fittings of metal; Guard rails of metal; Metal clothesline wire; Metal fence posts; Metal railings; Metal rigging chain; Posts of metal; Stainless steel pipes; Stair treads of metal; Wire rope fittings of metal, namely, Wire rope buckle; Wire rope sling; Wire ropes |
Translation of Words in Mark | The wording Vista Hardware has no meaning in a foreign language. |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, January 17, 2025 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Shenzhen Qianji Technology Co., Ltd. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | Shenzhen, Guangdong 518000 CN |
Event Date | Event Description |
Friday, January 17, 2025 | NEW APPLICATION ENTERED |
Friday, January 17, 2025 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, June 26, 2025 | ASSIGNED TO EXAMINER |
Monday, July 7, 2025 | NON-FINAL ACTION WRITTEN |
Monday, July 7, 2025 | NON-FINAL ACTION E-MAILED |
Monday, July 7, 2025 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |