Serial Number | 86972788 |
Word Mark | V VERTIV |
Filing Date | Tuesday, April 12, 2016 |
Status | 700 - REGISTERED |
Status Date | Tuesday, May 31, 2022 |
Registration Number | 6746942 |
Registration Date | Tuesday, May 31, 2022 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, May 1, 2018 |
Goods and Services | educational services, namely, conducting classes, seminars, and workshops in the field of electrical power systems, and data center infrastructure management, and distribution of training material in connection therewith |
Goods and Services | manufacture of electrical power switches and controllers for computer and telecommunications network applications to the order and/or specification of others; manufacture of power solutions for network applications; manufacture of power supplies for computing, communications, and industrial equipment applications to order and/or specification of others; custom manufacture of electrical power solutions for network applications; custom manufacture of power supplies for computing, communications, and industrial equipment applications; manufacture of electrical power solutions for network applications for others; manufacture of power supplies for computing, communications, and industrial equipment applications for others |
Description of Mark | The mark consists of a solid circle surrounding a cutout of a stylized letter "V" and a pyramid cutout at the bottom adjacent to the stylized text "VERTIV". |
Goods and Services | electric control panels for monitoring electrical and battery back-up power system critical system alarms; automatic transfer switches; battery backup power systems; computer hardware and peripherals for remote access and control of computers; computer hardware and software for data center infrastructure configuration and management; data center and computer room infrastructure management systems comprised primarily of uninterruptible power supplies, electronic controller for controlling air conditioning and temperature, air flow sensors, software for monitoring data center and computer room infrastructure equipment, and also containing a cooling system comprised primarily of air cooling apparatus, cooling evaporators, air conditioning units, electric fans, water cooling towers and associated electronic fan controls, air conditioning controls and power controllers, cabinets specially adapted for computer hardware equipment, and racks, curtains, doors and containment panels for use with computer systems, all sold together as a unit; data center monitoring and control systems, namely, microprocessor based hardware and software used to monitor and control electrical and electronic equipment, and climate conditions in a data center, telecommunication center, computer room or electronic equipment room environment; electric control switches; electric power converters; electric power monitoring and control systems, namely, microprocessor based hardware and software used to monitor the status and control electrical power systems, power transfer switches, electric power load banks, electric power distribution units, battery systems and uninterruptible electrical power supply systems; electrical power distribution units; electrical power load banks, namely, electrical power distribution units; electrical power transfer switches; electronic controls for server racks and data center cooling units; enclosures, cabinets and racks for computer servers and electrical and electronic equipment; electronic thermostat regulating devices for control of heat; climate control and cooling systems for telecom and data communication equipment, consisting of thermostats for cooling equipment and a programmable logic controller (PLC); microprocessor based hardware and software used to monitor and control cooling and air handler units for data centers and other computer and telecommunications equipment applications; power line conditioners; electric power converters; electrical power distribution units; power dividers, namely, electric switches; power supplies; power switches; rectifiers; regulating apparatus for electric power; electric regulating apparatus for the operation of power systems; regulators for phase shifting of communication signal regulators for phase shifting of electronic signals; remote electrical power control switches; remote controllers for power supplies; server rack monitoring systems, namely, microprocessor based hardware and software used to monitor the status of electronic and electrical equipment in a server rack; computer server racks; computer server racks incorporating integrated cooling units; electric luminescent display panels; software for data center infrastructure configuration and management; automatic transfer switches (ATS); uninterruptible electrical power supplies; voltage regulators; voltage surge protectors; voltage surge suppressors |
Goods and Services | metal panel systems comprising metal walls, ceiling, floor and door panels and metal mounting accessories therefor, namely, for use in controlling the flow of cooling air in data centers and computer rooms; brackets |
Goods and Services | installation, maintenance and repair of data center cooling systems; installation, maintenance and repair of power generating, computer and telecommunications equipment; installation, maintenance and repair of computer room air conditioning (CRAC) systems; installation, repair and maintenance of batteries; installation, repair and maintenance of electrical power systems; installation, repair and maintenance of batteries and fuel cells for electrical power systems; maintenance and preventive maintenance services of air conditioning for data centers and computer rooms; installation of electrical power systems for computer and telecommunications network applications for others |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | air handlers for cooling data centers; cooling units and systems comprised of cooling units and air conditioners for computer server racks and computer data centers; cooling units for computers and computer rooms; air conditioning condensers for use in cooling data centers, computer rooms and other computer and electronic equipment applications |
Goods and Services | air conditioning maintenance assessment services for the performance and reliability of air conditioning systems for data centers and computer rooms; battery monitoring and testing; consulting services in the field of design and engineering of electrical and battery back-up power systems for data centers, computer rooms and other commercial and industrial facilities; design of electrical and battery back-up power systems for computer and telecommunications network applications for others; engineering services, namely, technical project planning and design engineering for others in the fields of electrical and battery back-up power systems, computer networks and telecommunications projects; electrical engineering services, namely, providing technical analysis, testing, studies, recommendations and drafting plans relating to the safety, efficiency, performance and reliability of electrical equipment and power systems; electrical and battery back-up power systems and data center computer and telecommunications equipment engineering services; engineering services, namely, providing technical assessment of the performance, reliability, maintenance and configuration of data center and commercial and industrial facility electrical and battery back-up power systems; engineering services, namely, providing technical assessment of the performance, reliability, maintenance and configuration of data center cooling systems; remote monitoring of the functioning and use of data center and computer room electrical equipment, electrical and battery back-up power systems, and data center and computer room heating, ventilating and air conditioning apparatus; technical consultation in the fields of engineering of electrical and battery back-up power systems |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, April 15, 2016 |
Primary Code | 006 |
First Use Anywhere Date | Tuesday, November 14, 2017 |
First Use In Commerce Date | Tuesday, November 14, 2017 |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Friday, April 15, 2016 |
Primary Code | 009 |
First Use Anywhere Date | Thursday, December 1, 2016 |
First Use In Commerce Date | Monday, May 1, 2017 |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 024, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Friday, April 15, 2016 |
Primary Code | 011 |
First Use Anywhere Date | Friday, May 19, 2017 |
First Use In Commerce Date | Friday, May 19, 2017 |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, April 15, 2016 |
Primary Code | 037 |
First Use Anywhere Date | Thursday, December 1, 2016 |
First Use In Commerce Date | Thursday, December 1, 2016 |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, April 15, 2016 |
Primary Code | 040 |
First Use Anywhere Date | Thursday, June 15, 2017 |
First Use In Commerce Date | Wednesday, November 1, 2017 |
International Class | 041 - Education; providing of training; entertainment; sporting and cultural activities. |
US Class Codes | 100, 101, 107 |
Class Status Code | 6 - Active |
Class Status Date | Friday, April 15, 2016 |
Primary Code | 041 |
First Use Anywhere Date | Thursday, December 1, 2016 |
First Use In Commerce Date | Thursday, December 1, 2016 |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, April 15, 2016 |
Primary Code | 042 |
First Use Anywhere Date | Thursday, December 1, 2016 |
First Use In Commerce Date | Thursday, December 1, 2016 |
Party Name | VERTIV GROUP CORPORATION |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | COLUMBUS, OH 43085 |
Party Name | VERTIV GROUP CORPORATION |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | COLUMBUS, OH 43085 |
Party Name | Vertiv Co. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Columbus, OH 43085 |
Event Date | Event Description |
Wednesday, January 24, 2024 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
Tuesday, May 31, 2022 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
Tuesday, May 31, 2022 | REGISTERED-PRINCIPAL REGISTER |
Wednesday, April 27, 2022 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
Tuesday, April 26, 2022 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
Monday, March 28, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, March 28, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, March 28, 2022 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Thursday, March 24, 2022 | ASSIGNED TO LIE |
Tuesday, March 22, 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, September 24, 2021 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, September 24, 2021 | NON-FINAL ACTION E-MAILED |
Friday, September 24, 2021 | SU - NON-FINAL ACTION - WRITTEN |
Monday, August 23, 2021 | STATEMENT OF USE PROCESSING COMPLETE |
Friday, August 20, 2021 | USE AMENDMENT FILED |
Friday, August 20, 2021 | TEAS STATEMENT OF USE RECEIVED |
Tuesday, February 9, 2021 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Monday, February 8, 2021 | SOU EXTENSION 5 GRANTED |
Friday, January 22, 2021 | SOU EXTENSION 5 FILED |
Monday, February 8, 2021 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
Friday, January 22, 2021 | SOU TEAS EXTENSION RECEIVED |
Wednesday, August 19, 2020 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Monday, August 17, 2020 | SOU EXTENSION 4 GRANTED |
Monday, August 17, 2020 | SOU EXTENSION 4 FILED |
Monday, August 17, 2020 | SOU TEAS EXTENSION RECEIVED |
Saturday, February 29, 2020 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Thursday, February 20, 2020 | SOU EXTENSION 3 GRANTED |
Thursday, February 20, 2020 | SOU EXTENSION 3 FILED |
Thursday, February 20, 2020 | SOU TEAS EXTENSION RECEIVED |
Wednesday, February 19, 2020 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Wednesday, February 19, 2020 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Wednesday, February 19, 2020 | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS |
Wednesday, February 19, 2020 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Wednesday, February 19, 2020 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Wednesday, February 19, 2020 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
Friday, August 23, 2019 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Wednesday, August 21, 2019 | SOU EXTENSION 2 GRANTED |
Wednesday, August 21, 2019 | SOU EXTENSION 2 FILED |
Wednesday, August 21, 2019 | SOU TEAS EXTENSION RECEIVED |
Wednesday, June 12, 2019 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
Tuesday, February 19, 2019 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, February 21, 2019 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Tuesday, February 19, 2019 | SOU EXTENSION 1 GRANTED |
Tuesday, February 19, 2019 | SOU EXTENSION 1 FILED |
Tuesday, February 19, 2019 | SOU TEAS EXTENSION RECEIVED |
Tuesday, August 21, 2018 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Wednesday, July 11, 2018 | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED |
Tuesday, May 15, 2018 | EXTENSION OF TIME TO OPPOSE RECEIVED |
Tuesday, May 1, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, May 1, 2018 | PUBLISHED FOR OPPOSITION |
Wednesday, April 11, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Friday, March 23, 2018 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Friday, March 16, 2018 | ASSIGNED TO LIE |
Friday, March 9, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, March 9, 2018 | EXAMINER'S AMENDMENT ENTERED |
Friday, March 9, 2018 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Friday, March 9, 2018 | EXAMINERS AMENDMENT E-MAILED |
Friday, March 9, 2018 | EXAMINERS AMENDMENT -WRITTEN |
Friday, March 9, 2018 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
Thursday, March 8, 2018 | NOTICE OF ALLOWANCE CANCELLED |
Tuesday, December 5, 2017 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Wednesday, November 22, 2017 | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP |
Tuesday, October 10, 2017 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, October 10, 2017 | PUBLISHED FOR OPPOSITION |
Wednesday, September 20, 2017 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Monday, August 28, 2017 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Monday, August 28, 2017 | EXAMINER'S AMENDMENT ENTERED |
Monday, August 28, 2017 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Monday, August 28, 2017 | EXAMINERS AMENDMENT E-MAILED |
Monday, August 28, 2017 | EXAMINERS AMENDMENT -WRITTEN |
Friday, August 4, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, August 3, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, August 3, 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, February 3, 2017 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, February 3, 2017 | NON-FINAL ACTION E-MAILED |
Friday, February 3, 2017 | NON-FINAL ACTION WRITTEN |
Saturday, January 14, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, January 13, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, January 13, 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, July 19, 2016 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Tuesday, July 19, 2016 | NON-FINAL ACTION E-MAILED |
Tuesday, July 19, 2016 | NON-FINAL ACTION WRITTEN |
Monday, July 18, 2016 | ASSIGNED TO EXAMINER |
Saturday, April 16, 2016 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Friday, April 15, 2016 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, April 15, 2016 | NEW APPLICATION ENTERED |