
| Serial Number | 98858771 |
| Word Mark | V |
| Filing Date | Monday, November 18, 2024 |
| Status | 647 - EXAMINERS AMENDMENT - MAILED |
| Status Date | Monday, April 20, 2026 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | NOT AVAILABLE |
| Pseudo Mark | VECTOR |
| Indication of Colors claimed | Color is not claimed as a feature of the mark. |
| Description of Mark | The mark consists of the letter "V" formed by a continuous bold, solid, line where the top of the left portion of the letter forms an arrow; a shaded lightning bolt design sits in the bottom-center of the "V"; and all appear within a thinly lined circle. |
| Goods and Services | Testing, monitoring, and inspection of infrastructure for the transmission and distribution of electricity and electrical energy and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; Testing of apparatus in the field of electrical engineering; Scientific testing and analysis in the nature of thermography testing and analysis services, namely, electrical-system testing services of others using thermography; Design, engineering, research, development, consulting, analysis, and testing of infrastructure for the transmission and distribution of electricity and electrical energy and electricity and electrical energy distribution and transmission and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; Consulting services for others in the field of design, planning, and implementation project management in the electrical, utilities, industrials, renewables, and data center industries; Scientific research and development; scientific and technological services, namely, scientific research, scientific development, and scientific testing in the electrical, utilities, industrials, renewables, and data center industries; Conducting scientific feasibility studies |
| Goods and Services | Construction of high-voltage substations, low and medium-voltage controls and distribution, power houses, and switchgear in the electrical, utilities, industrials, renewables, and data center industries; installation of infrastructure for the transmission and distribution of electricity and electrical energy, electrical apparatus, cables, and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; maintenance of infrastructure for the transmission and distribution of electricity and electrical energy, electrical apparatus, cables, and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; repair of infrastructure, electrical apparatus, cables, and equipment in the electrical, utilities, industrials, renewables, and data center industries; installation, maintenance, and repair consultation of infrastructure for the transmission and distribution of electricity and electrical energy and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; Machinery retrofit and conversion services; Infrastructure for the transmission and distribution of electricity and electrical energy and electricity and electrical energy distribution and transmission equipment construction, maintenance, and project management services |
| Goods and Services | Educational services, namely, providing training in the fields of infrastructure and equipment engineering, testing, construction, installation, maintenance, and repair in the electrical, utilities, industrials, renewables, and data center industries; Educational services, namely, providing safety training in the fields of infrastructure and equipment engineering, testing, construction, installation, maintenance, and repair in the electrical, utilities, industrials, renewables, and data center industries. |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 18, 2024 |
| Primary Code | 037 |
| First Use Anywhere Date | Thursday, September 1, 2022 |
| First Use In Commerce Date | Thursday, September 1, 2022 |
| International Class | 041 - Education; providing of training; entertainment; sporting and cultural activities. |
| US Class Codes | 100, 101, 107 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 18, 2024 |
| Primary Code | 041 |
| First Use Anywhere Date | Thursday, September 1, 2022 |
| First Use In Commerce Date | Thursday, September 1, 2022 |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 18, 2024 |
| Primary Code | 042 |
| First Use Anywhere Date | Thursday, September 1, 2022 |
| First Use In Commerce Date | Thursday, September 1, 2022 |
| Party Name | Vector Power LLC |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | Plano, TX 75024 US |
| Event Date | Event Description |
| Monday, November 18, 2024 | NEW APPLICATION ENTERED |
| Thursday, May 1, 2025 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Thursday, May 1, 2025 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
| Thursday, May 1, 2025 | ASSIGNED TO EXAMINER |
| Tuesday, May 20, 2025 | NON-FINAL ACTION WRITTEN |
| Tuesday, May 20, 2025 | NON-FINAL ACTION E-MAILED |
| Tuesday, May 20, 2025 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Friday, May 16, 2025 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
| Friday, May 16, 2025 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
| Friday, May 16, 2025 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
| Friday, May 16, 2025 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
| Friday, May 16, 2025 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Thursday, May 22, 2025 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
| Thursday, May 22, 2025 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
| Thursday, May 22, 2025 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Tuesday, August 19, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, August 19, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, August 20, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, January 20, 2026 | FINAL REFUSAL WRITTEN |
| Tuesday, January 20, 2026 | FINAL REFUSAL E-MAILED |
| Tuesday, January 20, 2026 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Monday, April 20, 2026 | EXAMINERS AMENDMENT -WRITTEN |
| Monday, April 20, 2026 | EXAMINERS AMENDMENT E-MAILED |
| Monday, April 20, 2026 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
| Monday, April 20, 2026 | EXAMINER'S AMENDMENT ENTERED |