Serial Number | 87853201 |
Word Mark | TRUE ROOF BY TRUE SEAL |
Filing Date | Wednesday, March 28, 2018 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Wednesday, May 26, 2021 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Disclaimer with Predetermined Text | "SEAL" OR "ROOF" |
Goods and Services | Metal roofing accessories and materials, namely, non-electric stationary vents for ventilation and wind uplift securement in residential and commercial buildings, rigid facia strips, rigid and flexible corner flashing, scuppers, drains, drain clamping expansion rings, drip edge covering, drain leaf grates, gravel stops, flashings, roofing membrane sheeting, termination bars, roof membrane stress distribution plates; metal roofing systems comprised of non-electric stationary vents for ventilation and wind uplift securement in residential and commercial buildings, rigid facia strips, rigid and flexible corner flashing, roof scuppers, drains, drain clamping expansion rings, drip edge covering, drain leaf grates, gravel stops, flashings, roofing membrane sheeting, termination bars, roof membrane stress distribution plates; Metal deck roofing materials, namely, drains, rigid facia strips, scuppers, roof membrane stress distribution plates, screws and metal flashings, all excluding non-metal roofing panels |
Goods and Services | Non-metal roofing accessories and materials, namely, non-electric stationary vents for ventilation and wind uplift securement in residential and commercial buildings, rigid facia strips, rigid and flexible corner flashing, scuppers, drains, drain clamping expansion rings, drip edge covering, drain leaf grates, gravel stops, flashings, roofing membrane sheeting, PVC roofing membrane, underlayment, underlayment made of fiberglass mat and plastic film, termination bars, roof membrane stress distribution plates, polystyrene foam insulation, and roof decking materials; Non-metal roofing systems comprised of non-electric stationary vents for ventilation and wind uplift securement in residential and commercial buildings, rigid facia strips, rigid and flexible corner flashing, scuppers, drains, drain clamping expansion rings, drip edge covering, drain leaf grates, gravel stops, flashings, roofing membrane sheeting, PVC roofing membrane, underlayment, underlayment made of including fiberglass mat and plastic film, termination bars, roof membrane stress distribution plates, polystyrene foam insulation, and roof decking materials; non-metal deck roofing materials, namely, butyl tape; sealing termination between substrate and roofing system, PVC T-Patches; redundant seal used at membrane intersections, PVC corners; pre-fabricated corner reinforcements around curbs and roof edges; Non-metal decking and fencing accessories and materials, namely posts, exterior boards for construction, handrails, planks, pickets, post caps, post base collars and end caps for affixing to the ends of boards; Non-metal decking and fencing systems comprised of posts, exterior boards for construction, handrails, planks, pickets, post caps, post base collars and end caps for affixing to the ends of boards, all excluding non-metal roofing panels |
Goods and Services | roofing consulting and contracting services; roofing installation services; roofing maintenance services; roofing repair services; roofing services; roof decking services |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, April 4, 2018 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, April 4, 2018 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, April 4, 2018 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | True Seal Inc. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Markham, Ontario L3R9X8 CA |
Event Date | Event Description |
Wednesday, May 26, 2021 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
Wednesday, May 26, 2021 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Thursday, November 12, 2020 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED |
Thursday, November 12, 2020 | INQUIRY TO SUSPENSION E-MAILED |
Thursday, November 12, 2020 | SUSPENSION INQUIRY WRITTEN |
Monday, October 26, 2020 | LIE CHECKED SUSP - TO ATTY FOR ACTION |
Thursday, April 23, 2020 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Thursday, April 23, 2020 | LETTER OF SUSPENSION E-MAILED |
Thursday, April 23, 2020 | SUSPENSION LETTER WRITTEN |
Monday, April 6, 2020 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, April 6, 2020 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, April 3, 2020 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
Sunday, October 6, 2019 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED |
Sunday, October 6, 2019 | INQUIRY TO SUSPENSION E-MAILED |
Sunday, October 6, 2019 | SUSPENSION INQUIRY WRITTEN |
Monday, September 9, 2019 | LIE CHECKED SUSP - TO ATTY FOR ACTION |
Thursday, August 29, 2019 | ASSIGNED TO LIE |
Wednesday, January 30, 2019 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Wednesday, January 30, 2019 | LETTER OF SUSPENSION E-MAILED |
Wednesday, January 30, 2019 | SUSPENSION LETTER WRITTEN |
Saturday, December 29, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, December 28, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, December 28, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, June 28, 2018 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, June 28, 2018 | NON-FINAL ACTION E-MAILED |
Thursday, June 28, 2018 | NON-FINAL ACTION WRITTEN |
Monday, June 25, 2018 | ASSIGNED TO EXAMINER |
Wednesday, April 4, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Saturday, March 31, 2018 | NEW APPLICATION ENTERED IN TRAM |