Serial Number | 97712100 |
Word Mark | THESOUTH |
Filing Date | Saturday, December 10, 2022 |
Status | 641 - NON-FINAL ACTION - MAILED |
Status Date | Friday, November 8, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 5 - Drawing with word(s) / letter(s) / number(s) in Stylized form |
Published for Opposition Date | NOT AVAILABLE |
Description of Mark | The mark consists of the stylized wording "THESOUTH". |
Goods and Services | Microchips; Microprocessors; Electronic chips for the manufacture of integrated circuits; Electronic integrated circuits; Integrated circuits; Multiprocessor chips; Semiconductor chips; Temperature sensors; Vibration sensors |
Pseudo Mark | THE SOUTH |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Saturday, January 7, 2023 |
Primary Code | 009 |
First Use Anywhere Date | Monday, October 3, 2022 |
First Use In Commerce Date | Monday, October 3, 2022 |
Party Name | Shenzhen Nanxin International Electronics Co., Ltd. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | Nanshan Dist, Shenzhen 518000 CN |
Event Date | Event Description |
Wednesday, December 14, 2022 | NEW APPLICATION ENTERED |
Saturday, January 7, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Wednesday, September 13, 2023 | ASSIGNED TO EXAMINER |
Saturday, September 16, 2023 | SUSPENSION LETTER WRITTEN |
Saturday, September 16, 2023 | LETTER OF SUSPENSION E-MAILED |
Saturday, September 16, 2023 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Monday, March 18, 2024 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Friday, November 8, 2024 | NON-FINAL ACTION WRITTEN |
Friday, November 8, 2024 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, November 8, 2024 | NON-FINAL ACTION E-MAILED |