Serial Number | 79257925 |
Word Mark | SUMI-MODULE |
Filing Date | Wednesday, January 30, 2019 |
Status | 700 - REGISTERED |
Status Date | Tuesday, June 9, 2020 |
Registration Number | 6071691 |
Registration Date | Tuesday, June 9, 2020 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, March 24, 2020 |
Goods and Services | Photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic units for the production of electrical power comprised of photovoltaic solar modules, inverters, electric junction boxes, power cables, and mounts for photovoltaic solar modules; photovoltaic installations for generating electricity, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; solar panels for the production of electricity; solar cells; photovoltaic solar modules; photovoltaic cells; photovoltaic modules; automatic solar tracking sensors; power distribution or control machines and apparatus, namely, electrical power distribution units; testing and measuring equipment for use in testing the performance and efficiency of power plant equipment; electrical cells and batteries; electricity meters; magnetometers; computer software for measuring power generation performance of solar panels, downloadable or recorded; computers; computer software for design of photovoltaic power generation systems, downloadable or recorded; computer software for simulation of photovoltaic power generation systems, downloadable or recorded; computer software for monitoring and controlling photovoltaic power generation systems, downloadable or recorded; electric cables and wires; magnetic cores; resistance wires; electrodes |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, May 15, 2019 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Sumitomo Electric Industries, LTD. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | JP |
Party Name | Sumitomo Electric Industries, LTD. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | JP |
Party Name | Sumitomo Electric Industries, LTD. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | JP |
Event Date | Event Description |
Sunday, October 25, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, October 1, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, October 1, 2020 | FINAL DISPOSITION PROCESSED |
Wednesday, September 9, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, June 9, 2020 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, March 24, 2020 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, March 24, 2020 | PUBLISHED FOR OPPOSITION |
Wednesday, March 4, 2020 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, February 12, 2020 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, January 22, 2020 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, January 21, 2020 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, January 21, 2020 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, August 16, 2019 | REFUSAL PROCESSED BY IB |
Friday, July 26, 2019 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, July 26, 2019 | REFUSAL PROCESSED BY MPU |
Tuesday, July 2, 2019 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, July 1, 2019 | NON-FINAL ACTION WRITTEN |
Tuesday, May 21, 2019 | APPLICATION FILING RECEIPT MAILED |
Wednesday, May 15, 2019 | ASSIGNED TO EXAMINER |
Wednesday, May 15, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Tuesday, May 14, 2019 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
Thursday, May 2, 2019 | SN ASSIGNED FOR SECT 66A APPL FROM IB |