Serial Number | 97522135 |
Word Mark | STRUCTURE LOCK |
Filing Date | Wednesday, July 27, 2022 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Monday, September 11, 2023 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Buckles of common metal; Hardware, namely, metal brackets for general use; Metal bathroom hardware, namely, pulls; Metal clasps for a replacement of bridging and blocking between joists; Metal concrete construction hardware, namely, load transfer dowels; Metal hardware, namely, carabiners of metal; Metal hardware, namely, double-end swivels; Metal hardware, namely, nuts; Metal hardware, namely, spacers used in the installation of flooring; Metal hardware, namely, springs; Metal hardware, namely, washers; Metal hardware, namely, pulleys |
Disclaimer with Predetermined Text | "LOCK" |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, August 4, 2022 |
Primary Code | 006 |
First Use Anywhere Date | Monday, July 31, 2017 |
First Use In Commerce Date | Monday, July 31, 2017 |
Party Name | Viribus Structural Connectors Inc |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | Vancouver V6G2Z6 CA |
Event Date | Event Description |
Monday, September 11, 2023 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
Monday, September 11, 2023 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Monday, September 11, 2023 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Friday, May 26, 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, May 26, 2023 | NON-FINAL ACTION E-MAILED |
Friday, May 26, 2023 | NON-FINAL ACTION WRITTEN |
Monday, May 15, 2023 | ASSIGNED TO EXAMINER |
Thursday, August 4, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Saturday, July 30, 2022 | NEW APPLICATION ENTERED |