Serial Number | 79288143 |
Word Mark | SPIDER |
Filing Date | Thursday, January 30, 2020 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Monday, February 22, 2021 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Reinforcement rods for building, not of metal; space frame modular units being building materials, not of metal; slabs, not of metal, for building; prefabricated non-metal buildings; concrete building elements; building components of wood; construction elements of plastic; structural elements (non-metallic -) for use in building; building and construction materials and elements, not of metal; building materials and building components (non-metallic); prefabricated building components (non-metallic -); prefabricated building elements (non-metallic -) for on-site assembly; manufactured building elements (non-metallic -); concrete building materials; building materials of concrete reinforced with plastics and glass fibres; fiber reinforced plastic construction materials; building materials of plastics material; building materials made of rock fibres; expanded plastics for use in construction; building boards of plastics materials; multilayer panels of plastic for use in building; reinforcing materials, not of metal, for building; structural reinforcement (non-metallic -) for construction purposes; beams (non-metallic -) for building purposes; concrete walls for building; brackets, not of metal, for building; woven materials (non-metallic -) for use in buildings; ties (non-metallic -) for use in building; modular units (non-metallic -) for constructing prefabricated buildings; foundation material (non-metallic -) for use in construction; stabilisation fabrics (non-metallic -) for use in construction; framework, not of metal, for building; building sections (non-metallic -); reinforcing mesh made of textile fibres for construction purposes; modular building units (non-metallic -); structural frameworks (non-metallic -) for buildings; building materials, not of metal; building materials [non-metallic]; reinforcing fabrics (non-metallic -) for building; fireproof seals in the nature of building materials; refractory construction materials, not of metal; non-metallic building materials having acoustic properties; partitions being non-metallic building materials; monocoque buildings (non-metallic -); pillars, not of metal, for building; pre-fabricated non-metal architectural columns; pillars (non-metallic -) for buildings; capitals (non-metallic -) being parts of columns; porticos (non-metallic -); props, not of metal; textured wall claddings, not of metal, for building; structural support joists (non-metallic -) for the construction of floors; porches [structures], not of metal |
Goods and Services | Building and construction materials and elements of metal; unwrought or semi-wrought common metals; metal hardware; metal containers for storage or transport; spacers being building elements made of metal; building materials of metal; building components of metal for the construction of arches; building components (metal -) in the form of slabs; modular building units (metal -); steel building materials; reinforcement materials (metal -) for construction; fabricated metal components for building foundations; refractory construction materials of metal; reinforcing materials of metal for building; linings of metal [building]; building structures of metal; mouldings of metal for building; ties of metal for use in building; steel reinforcement for use in the construction of concrete floors; reinforcement rods of metal; reinforcing pins of metal for formwork; reinforcing bars of metal for use in brickwork; frames of metal for building; metal door viewers [non-magnified]; reinforcing fabrics of metal for building; architectural hardware made of common metals and alloys thereof; capitals (metal -) being parts of columns; pre-fabricated metal architectural columns; pillars of metal for building; stays of metal; props of metal; brickwork supports of metal; metal panels; metal brackets; frameworks of metal; frameworks of metal for ceilings |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, June 26, 2020 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, June 26, 2020 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Schock Bauteile GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 27 - NOT AVAILABLE |
Address | DE |
Event Date | Event Description |
Saturday, July 16, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
Sunday, March 13, 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Tuesday, February 22, 2022 | FINAL DISPOSITION NOTICE SENT TO IB |
Tuesday, February 22, 2022 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Sunday, December 19, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, December 1, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, December 1, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Wednesday, March 24, 2021 | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
Monday, February 22, 2021 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Monday, February 22, 2021 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Friday, January 29, 2021 | LIMITATION OF GOODS RECEIVED FROM IB |
Tuesday, August 25, 2020 | REFUSAL PROCESSED BY IB |
Thursday, August 6, 2020 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, August 6, 2020 | REFUSAL PROCESSED BY MPU |
Tuesday, June 30, 2020 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, June 30, 2020 | APPLICATION FILING RECEIPT MAILED |
Monday, June 29, 2020 | NON-FINAL ACTION WRITTEN |
Friday, June 26, 2020 | ASSIGNED TO EXAMINER |
Friday, June 26, 2020 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, June 25, 2020 | SN ASSIGNED FOR SECT 66A APPL FROM IB |