
| Serial Number | 79368957 |
| Word Mark | SOLSKIN |
| Filing Date | Tuesday, January 3, 2023 |
| Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
| Status Date | Monday, April 29, 2024 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | NOT AVAILABLE |
| Goods and Services | Solar panels for electricity production; solar cells; photovoltaic apparatus and installations for solar electricity production; photovoltaic installations for generating electricity (photovoltaic power plants); photovoltaic cells and modules; automatic solar tracking sensors; computer software, firmware and hardware; pattern recognition systems composed of computer chips, computer hardware and computer software; smart home-automation hubs; heat regulating apparatus; heat detectors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity |
| Goods and Services | Non-metallic roller shutters; jalousies not of metal; non-metal roofing incorporating solar cells; roofing, not of metal, incorporating photovoltaic cells; construction materials not of metal; framework for building, not of metal |
| Goods and Services | Roller shutters of metal; jalousies of metal; framework for building of metal; building materials of metal; metal roofing incorporating solar cells; roofing, of metal, incorporating photovoltaic cells |
| Goods and Services | Design and development of software for control, regulation and monitoring of solar energy systems; research and development services relating to solar cells and electricity production; technical development of structural elements, devices and systems for solar collectors and photovoltaic plants; scientific and industrial research in the field of photovoltaics and solar collectors; design and development of photovoltaic systems; design, development, installation, updating and maintenance of software; design and development of computer hardware; Software as a Service (SaaS); consultation with respect to software; rental of computer hardware and software; engineering and architectural services; architectural planning and consultation services; advice with respect to artificial intelligence; research in the field of artificial intelligence technology; advice with respect to energy saving; providing scientific information and advice with respect to carbon offsetting |
| International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
| US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, May 5, 2023 |
| Primary Code | 006 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, May 5, 2023 |
| Primary Code | 009 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, May 5, 2023 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, May 5, 2023 |
| Primary Code | 042 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Zurich Soft Robotics GmbH |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 27 - NOT AVAILABLE |
| Address | CH |
| Event Date | Event Description |
| Thursday, May 4, 2023 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Friday, May 5, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, May 9, 2023 | APPLICATION FILING RECEIPT MAILED |
| Wednesday, September 27, 2023 | ASSIGNED TO EXAMINER |
| Monday, October 16, 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Thursday, September 28, 2023 | NON-FINAL ACTION WRITTEN |
| Friday, September 29, 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Tuesday, November 7, 2023 | REFUSAL PROCESSED BY IB |
| Monday, April 29, 2024 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
| Monday, October 16, 2023 | REFUSAL PROCESSED BY MPU |
| Monday, April 29, 2024 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
| Wednesday, April 30, 2025 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Saturday, May 17, 2025 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Monday, April 29, 2024 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
| Thursday, September 5, 2024 | UNDELIVERABLE MAIL - NO ACTION TAKEN |
| Wednesday, April 30, 2025 | FINAL DISPOSITION NOTICE SENT TO IB |
| Thursday, October 9, 2025 | NEW REPRESENTATIVE AT IB RECEIVED |
| Friday, July 11, 2025 | NEW REPRESENTATIVE AT IB RECEIVED |