SNOWSHADOW MARBLE Trademark

Trademark Overview


On Monday, March 10, 2025, a trademark application was filed for SNOWSHADOW MARBLE with the United States Patent and Trademark Office. The USPTO has given the SNOWSHADOW MARBLE trademark a serial number of 99075755. The federal status of this trademark filing is NON-FINAL ACTION - MAILED as of Thursday, August 14, 2025. This trademark is owned by NT Trading INC. The SNOWSHADOW MARBLE trademark is filed in the Non-Metallic Building Material Products category with the following description:

Building materials, namely, manufactured marble veneer for use on floors, walls, exterior surfaces; Natural stone
snowshadow marble

General Information


Serial Number99075755
Word MarkSNOWSHADOW MARBLE
Filing DateMonday, March 10, 2025
Status641 - NON-FINAL ACTION - MAILED
Status DateThursday, August 14, 2025
Registration Number0000000
Registration DateNOT AVAILABLE
Mark Drawing4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form
Published for Opposition DateNOT AVAILABLE

Trademark Statements


Goods and ServicesBuilding materials, namely, manufactured marble veneer for use on floors, walls, exterior surfaces; Natural stone
Pseudo MarkSNOW SHADOW MARBLE
NOT AVAILABLENo claim is made to the exclusive right to use marble, apart from the mark as shown.

Classification Information


International Class019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal.
US Class Codes001, 012, 033, 050
Class Status Code6 - Active
Class Status DateMonday, March 10, 2025
Primary Code019
First Use Anywhere DateFriday, January 1, 2010
First Use In Commerce DateFriday, January 1, 2010

Trademark Owner History


Party NameNT Trading INC
Party Type10 - Original Applicant
Legal Entity Type03 - Corporation
AddressHawthorne, NJ 07506

Trademark Events


Event DateEvent Description
Monday, March 10, 2025NEW APPLICATION ENTERED
Tuesday, July 29, 2025NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Monday, August 11, 2025ASSIGNED TO EXAMINER
Thursday, August 14, 2025NON-FINAL ACTION E-MAILED
Thursday, August 14, 2025NOTIFICATION OF NON-FINAL ACTION E-MAILED
Thursday, August 14, 2025NON-FINAL ACTION WRITTEN
Monday, March 10, 2025APPLICATION FILING RECEIPT MAILED