Serial Number | 90836771 |
Word Mark | SMALLER FASTER SMARTER PROVEN |
Filing Date | Monday, July 19, 2021 |
Status | 731 - SECOND EXTENSION - GRANTED |
Status Date | Tuesday, June 11, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, April 18, 2023 |
Goods and Services | Components for semiconductor manufacturing machines, namely, electrodes, pedestals in the nature of electro-static chuck pedestals being sensors in the nature of pressure sensors for machine chucks, calibration devices for calibrating pressure sensors, electric actuators, electric measurement sensors, recorded operating software for operating semiconductor manufacturing machines, electrical controllers, transducers in the nature of electrical transducers and electro-optic transducers, electronic signal transmitters, electronic signal receivers, coaxial cables, fiber optic cables, Pressure and optical sensors, vacuums being vacuum gauges, tubes being electron tubes and photoelectric tubes, feed lines being connection cables, power supplies, power cables; Components for semiconductor substrates manufacturing machines, namely, electrodes, pedestals in the nature of electro-static chuck pedestals being sensors in the nature of pressure sensors for machine chucks, calibration devices for calibrating pressure sensors, electric actuators, electric measurement sensors, recorded operating software for operating semiconductor substrates manufacturing machines, electrical controllers, transducers in the nature of electrical transducers and electro-optic transducers, electronic signal transmitters, electronic signal receivers, coaxial cables, fiber optic cables, Pressure and optical sensors, vacuums being vacuum gauges, tubes being electron tubes and photoelectric tubes, feed lines being connection cables, power supplies, power cables; Components for semiconductor wafer processing machines, namely, electrodes, pedestals in the nature of electro-static chuck pedestals being sensors in the nature of pressure sensors for machine chucks, calibration devices for calibrating pressure sensors, electric actuators, electric measurement sensors, recorded operating software for operating semiconductor wafer processing machines, electrical controllers, transducers in the nature of electrical transducers and electro-optic transducers, electronic signal transmitters, electronic signal receivers, coaxial cables, fiber optic cables, Pressure and optical sensors, vacuums being vacuum gauges, tubes being electron tubes and photoelectric tubes, feed lines being connection cables, power supplies, power cables; Components for semiconductor wafer processing equipment, namely, electrodes, pedestals in the nature of electro-static chuck pedestals being sensors in the nature of pressure sensors for machine chucks, calibration devices for calibrating pressure sensors, electric actuators, electric measurement sensors, recorded operating software for operating semiconductor wafer processing equipment, electrical controllers, transducers in the nature of electrical transducers and electro-optic transducers, electronic signal transmitters, electronic signal receivers, coaxial cables, fiber optic cables, Pressure and optical sensors, vacuums being vacuum gauges, tubes being electron tubes and photoelectric tubes, feed lines being connection cables, power supplies, power cables; Computer hardware and recorded software systems for the installation, operation, maintenance, and repair of semiconductor manufacturing machines, semiconductor substrates manufacturing machines, semiconductor wafer processing machines; Downloadable interactive multimedia computer program for the installation, operation, maintenance, and repair of semiconductor manufacturing machines, semiconductor substrates manufacturing machines, semiconductor wafer processing machines; Measurement apparatus and instruments, namely, pressure measuring apparatus, distance measuring apparatus for use in semiconductor manufacturing, semiconductor substrates manufacturing, and semiconductor wafer processing |
NOT AVAILABLE | "SMALLER FASTER" |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, September 21, 2021 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Lam Research Corporation |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | Fremont, CA 94538 |
Party Name | Lam Research Corporation |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Fremont, CA 94538 |
Event Date | Event Description |
Thursday, July 22, 2021 | NEW APPLICATION ENTERED |
Tuesday, September 21, 2021 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, December 3, 2021 | ASSIGNED TO EXAMINER |
Friday, December 10, 2021 | NON-FINAL ACTION WRITTEN |
Friday, December 10, 2021 | NON-FINAL ACTION E-MAILED |
Friday, December 10, 2021 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, December 10, 2021 | NON-FINAL ACTION WRITTEN |
Friday, December 10, 2021 | NON-FINAL ACTION E-MAILED |
Friday, December 10, 2021 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, June 2, 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, June 2, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, June 2, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, July 28, 2022 | FINAL REFUSAL WRITTEN |
Thursday, July 28, 2022 | FINAL REFUSAL E-MAILED |
Thursday, July 28, 2022 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Tuesday, September 27, 2022 | ASSIGNED TO EXAMINER |
Sunday, November 20, 2022 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Sunday, November 20, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, November 21, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, December 13, 2022 | NON-FINAL ACTION WRITTEN |
Tuesday, December 13, 2022 | NON-FINAL ACTION E-MAILED |
Tuesday, December 13, 2022 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Wednesday, March 8, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, March 8, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, March 8, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, March 16, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Tuesday, April 18, 2023 | PUBLISHED FOR OPPOSITION |
Wednesday, March 29, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Thursday, April 13, 2023 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Thursday, April 13, 2023 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, April 13, 2023 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Tuesday, April 18, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, June 13, 2023 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Tuesday, June 11, 2024 | SOU TEAS EXTENSION RECEIVED |
Tuesday, December 12, 2023 | SOU TEAS EXTENSION RECEIVED |
Tuesday, December 12, 2023 | SOU EXTENSION 1 FILED |
Tuesday, December 12, 2023 | SOU EXTENSION 1 GRANTED |
Thursday, December 14, 2023 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Tuesday, June 11, 2024 | SOU EXTENSION 2 FILED |
Tuesday, June 11, 2024 | SOU EXTENSION 2 GRANTED |
Monday, September 23, 2024 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Monday, September 23, 2024 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
Monday, September 23, 2024 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Thursday, June 13, 2024 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |