Serial Number | 88489450 |
Word Mark | SHYFT POWER SOLUTIONS |
Filing Date | Wednesday, June 26, 2019 |
Status | 654 - REPORT COMPLETED SUSPENSION CHECK - CASE STILL SUSPENDED |
Status Date | Friday, January 5, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Description of Mark | The mark consists of the words "SHYFT POWER SOLUTIONS" in stylized font where the words are in the color deep purple and an arrow shape in the color yellow comprises the horizontal bar in the "H" and part of the "Y" in the word "SHYFT". |
Goods and Services | Downloadable software for monitoring and controlling electric power systems in the field of electricity distribution, power grid load shifting, and energy utilization metering, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; downloadable software for budget and cost/benefit analysis regarding use of alternative electric power sources in the field of electricity distribution, power grid load shifting, and energy utilization metering; Automatic switching apparatus and controllers for controlling electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; Residential, commercial and industrial automation controllers in the field of electricity distribution, power grid load shifting, and energy utilization metering comprised of computer hardware and downloadable software for controlling networked devices in the internet of things (IoT), operating internet-enabled and connected electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; electric meters, for tracking, monitoring, controlling, or reporting energy, gas, and water, usage; transformers, transformer switches being electric switches, and structural components therefor in the field of electricity distribution, power grid load shifting, and energy utilization metering |
Goods and Services | Installation of solar energy systems and alternative energy products for residential, commercial and industrial use; providing information on the environmental and cost-saving benefits of solar or battery installations in the nature of information regarding best practices for typical installations, and environmental and cost-savings benefits |
Pseudo Mark | SHIFT POWER SOLUTIONS |
Indication of Colors claimed | The color(s) Yellow and Deep Purple is/are claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "POWER SOLUTIONS" |
Goods and Services | Providing online nondownloadable software for controlling electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; providing online nondownloadable software for budget and cost/benefit analysis regarding use of alternative electric power sources in the field of electricity distribution, power grid load shifting, and energy utilization metering; cloud computing provider services in the nature of providing electronic data storage in the field of electricity distribution, power grid load shifting, and energy utilization metering; design of energy systems for residential, commercial and industrial use |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Saturday, July 6, 2019 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Saturday, July 6, 2019 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Saturday, July 6, 2019 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Shyft Power Solutions, Inc. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Houston, TX 77004 |
Event Date | Event Description |
Friday, January 5, 2024 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Sunday, November 19, 2023 | ASSIGNED TO EXAMINER |
Friday, June 30, 2023 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Tuesday, December 13, 2022 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Friday, May 6, 2022 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Wednesday, September 15, 2021 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Monday, August 23, 2021 | ASSIGNED TO EXAMINER |
Wednesday, February 10, 2021 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Sunday, July 12, 2020 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Sunday, July 12, 2020 | LETTER OF SUSPENSION E-MAILED |
Sunday, July 12, 2020 | SUSPENSION LETTER WRITTEN |
Wednesday, July 8, 2020 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, July 8, 2020 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, July 8, 2020 | ASSIGNED TO LIE |
Saturday, June 27, 2020 | NOTICE OF REVIVAL - E-MAILED |
Friday, June 26, 2020 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, June 26, 2020 | PETITION TO REVIVE-GRANTED |
Friday, June 26, 2020 | TEAS PETITION TO REVIVE RECEIVED |
Thursday, June 4, 2020 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
Thursday, June 4, 2020 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Friday, October 11, 2019 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, October 11, 2019 | NON-FINAL ACTION E-MAILED |
Friday, October 11, 2019 | NON-FINAL ACTION WRITTEN |
Monday, September 16, 2019 | ASSIGNED TO EXAMINER |
Tuesday, July 9, 2019 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Saturday, July 6, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Saturday, June 29, 2019 | NEW APPLICATION ENTERED |