
| Serial Number | 79221131 |
| Word Mark | SHEAR BRILLIANCE |
| Filing Date | Tuesday, September 26, 2017 |
| Status | 708 - PARTIAL SECTION 71 & 15 ACCEPTED AND ACKNOWLEDGED |
| Status Date | Wednesday, May 14, 2025 |
| Registration Number | 5624662 |
| Registration Date | Tuesday, December 11, 2018 |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, September 25, 2018 |
| Goods and Services | [ Electrical controllers, electric controlling devices, and electric control panels for use with controlling metal working machinery; programmable electronic controllers for sheet metal working centres and sheet metal processing machinery; computer software for computer-aided design/computer-aided manufacturing (CAD/CAM) for use during the processing of sheet metal; computer-aided design (CAD) software and electronic production control computer hardware for sheet metal working systems; computer hardware and computer software for controlling and operating sheet metal working centres and for controlling and operating machines and apparatus for working sheet metal; computer numerical control hardware and their electronic controllers and electronic remote controllers for machinery used in sheet metal working; data processing terminals for sheet metal working centres and for machines and apparatus for working sheet metal ] |
| Goods and Services | Machine tools, namely tool bits; metalworking machine tools; sheet metal working machines and structural parts thereof; punching machines for metalworking; punching presses for metalworking; punches for punching machines; cutting machines; cutting tools being parts of machines; power operated cutting tools, particularly shears for industrial use; shearing machines for metalworking; laser cutters for metalworking; servo-cutters as metal working machines; bending machines for metalworking; shaping machines for metalworking; holding devices for machine tools; grinding machines for cutting tools; hydraulic controls for machines, motors and engines; pneumatic controls for machines, motors and engines; transporting machines for transporting metal sheets namely, lifting installations for the transport of sheet metal, automatic loading and unloading machines; automatic loading and unloading machines for moving sheet metal; sorting conveyors and conveyor belts as a part of flexible automatic manufacturing systems for working and handling metal sheets; industrial robots; handling apparatus for loading and unloading, namely lifting installations for the transport of sheet metal, automatic loading and unloading apparatus for loading and unloading metal sheets; automatic storing, sorting and stacking machines for handling of metal sheets and sheet components, namely, automatic material handling machines, namely, palletizers, case elevators, automatic pallet dispensing machines and automatic slip sheet dispensing machines; flexible automatic manufacturing systems for working and handling of metals comprising automated sheet metal working stations, sheet metal working machines, metal sheet shearing machines, right angle metal shearing machines, clamps used in turret punch press machines for holding metal sheets, machine punch presses, metal bending machines, lifting installations for the transport of sheet metal, sorting conveyors, loading and unloading machines for moving metal sheets, material handling machines, namely, palletizers, case elevators, automatic pallet dispensing machines and automatic slip sheet dispensing machines, industrial robots and their component parts |
| Goods and Services | [ Repair or maintenance of metalworking machines and tools; repair and maintenance of automated sheet metal working stations and sheet metal working machinery; installation of metalworking machines; installation of automated metal working stations for processing sheet metal and sheet metal working machinery ] |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Wednesday, May 14, 2025 |
| Primary Code | 037 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
| US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
| Class Status Code | 6 - Active |
| Class Status Date | Saturday, November 25, 2017 |
| Primary Code | 007 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Wednesday, May 14, 2025 |
| Primary Code | 009 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Finn-Power Oy |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | Seinäjoki FI-60100 FI |
| Party Name | Finn-Power Oy |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | FI-62200 Kauhava FI |
| Party Name | Finn-Power Oy |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | FI-62200 Kauhava FI |
| Event Date | Event Description |
| Friday, July 17, 2020 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
| Monday, April 21, 2025 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Tuesday, January 9, 2018 | NON-FINAL ACTION WRITTEN |
| Sunday, August 12, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Saturday, November 25, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, September 25, 2018 | PUBLISHED FOR OPPOSITION |
| Wednesday, November 29, 2017 | APPLICATION FILING RECEIPT MAILED |
| Tuesday, September 25, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Friday, July 20, 2018 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Saturday, July 21, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Friday, July 20, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Thursday, November 16, 2017 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Wednesday, January 10, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Saturday, January 20, 2018 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Saturday, February 10, 2018 | REFUSAL PROCESSED BY IB |
| Saturday, January 20, 2018 | REFUSAL PROCESSED BY MPU |
| Monday, March 11, 2019 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Tuesday, March 19, 2019 | FINAL DISPOSITION NOTICE SENT TO IB |
| Tuesday, March 19, 2019 | FINAL DISPOSITION PROCESSED |
| Friday, April 5, 2019 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Tuesday, December 11, 2018 | REGISTERED-PRINCIPAL REGISTER |
| Wednesday, September 5, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Wednesday, May 14, 2025 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED |
| Wednesday, September 5, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Monday, December 9, 2024 | TEAS SECTION 71 & 15 RECEIVED |
| Wednesday, September 5, 2018 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Monday, December 11, 2023 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
| Wednesday, May 14, 2025 | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. |
| Friday, October 4, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
| Thursday, August 23, 2018 | ASSIGNED TO LIE |
| Friday, July 20, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, January 2, 2018 | ASSIGNED TO EXAMINER |
| Monday, July 23, 2018 | ASSIGNED TO EXAMINER |
| Friday, September 21, 2018 | NOTIFICATION PROCESSED BY IB |