Serial Number | 79151578 |
Word Mark | SALINI IMPREGILO |
Filing Date | Tuesday, December 24, 2013 |
Status | 708 - PARTIAL SECTION 71 & 15 ACCEPTED AND ACKNOWLEDGED |
Status Date | Friday, June 30, 2023 |
Registration Number | 4975225 |
Registration Date | Tuesday, June 14, 2016 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, March 29, 2016 |
Goods and Services | [ Treatment of building materials, namely, processing, finishing and polishing of stone articles and glass; treatment of wood building materials for preservation purposes, namely, processing, finishing and polishing of wood; recycling of waste and trash ] |
Description of Mark | The mark consists of the wording "SALINI IMPREGILO" in red and a series of red and white curved bands and bars forming a circular shape all shown against a white rectangular border. The black shown in the mark is for outlining purposes only and is not intended as a feature of the mark. |
Goods and Services | [ Building materials not of metal, namely, cement mixes, Portland cement, roofing cement, hydraulic cement, mortars, mortar mix; stone for building and construction, tar-based concrete and asphalt patching compounds, tiles of clay, glass, gypsum, ceramic or earthenware for walls, floors and ceilings; granite, marble, lumber, bricks, wood and concrete beams, planks, non-metal suspended ceiling systems comprising panels; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments not of metal ] |
Goods and Services | Building construction, Building restoration, Construction of railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects, namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators, power plants, civil buildings, hospitals and industrial construction complexes in the public and private sectors; repairing of railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects, namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators and powerplants, civil buildings, hospitals and industrial construction complexes in the public and private sectors; installation services for elevators, lifts, windows, doors, walls, air handling units, generators, appliances and cooling towers, plumbing equipment, lightning systems, electrical systems, fire systems, sanitary fittings, flooring, ceiling systems, roofs in connection with railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects, namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators and powerplants, civil buildings, hospitals and industrial construction complexes in the public and private sectors |
Indication of Colors claimed | The color(s) red and white is/are claimed as a feature of the mark. |
Goods and Services | [ Scientific and technological services, namely, research and design for utility, industrial and commercial companies and governments in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; industrial research for utility, industrial and commercial companies and governments in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; and industrial analysis for utility, industrial and commercial companies and governments, namely, consultation in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; design and development of hardware and software ] |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | G - NOT AVAILABLE |
Class Status Date | Friday, June 30, 2023 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 5, 2014 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | G - NOT AVAILABLE |
Class Status Date | Friday, June 30, 2023 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | G - NOT AVAILABLE |
Class Status Date | Friday, June 30, 2023 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | WEBUILD S.p.A. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | IT |
Party Name | Salini Impregilo S.p.A. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | Milan IT |
Party Name | Salini Impregilo S.p.A. |
Party Type | 11 - New Owner Before Publication |
Legal Entity Type | 99 - Other |
Address | Milan IT |
Party Name | Salini S.p.A. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 09 - Joint Stock Company |
Address | IT |
Event Date | Event Description |
Sunday, April 7, 2024 | PARTIAL INVALIDATION PROCESSED BY THE IB |
Wednesday, March 6, 2024 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Wednesday, March 6, 2024 | INVALIDATION PROCESSED |
Thursday, February 29, 2024 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
Thursday, January 25, 2024 | INTERNATIONAL REGISTRATION RENEWED |
Friday, June 30, 2023 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED |
Friday, June 30, 2023 | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. |
Friday, June 30, 2023 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Monday, December 12, 2022 | TEAS SECTION 71 & 15 RECEIVED |
Friday, July 1, 2022 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Saturday, June 19, 2021 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Monday, June 14, 2021 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Wednesday, October 12, 2016 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Wednesday, September 21, 2016 | FINAL DISPOSITION NOTICE SENT TO IB |
Wednesday, September 21, 2016 | FINAL DISPOSITION PROCESSED |
Wednesday, September 14, 2016 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, June 14, 2016 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, March 29, 2016 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, March 29, 2016 | PUBLISHED FOR OPPOSITION |
Friday, March 25, 2016 | NOTIFICATION PROCESSED BY IB |
Wednesday, March 9, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, March 9, 2016 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, March 9, 2016 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Friday, February 26, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, February 24, 2016 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Thursday, February 18, 2016 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, February 10, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, February 10, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Saturday, January 2, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Saturday, January 2, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Saturday, January 2, 2016 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, November 2, 2015 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Monday, November 2, 2015 | NON-FINAL ACTION E-MAILED |
Monday, November 2, 2015 | NON-FINAL ACTION WRITTEN |
Monday, October 5, 2015 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, October 5, 2015 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, October 5, 2015 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Thursday, July 2, 2015 | CHANGE OF OWNER RECEIVED FROM IB |
Friday, April 17, 2015 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Friday, April 17, 2015 | FINAL REFUSAL E-MAILED |
Friday, April 17, 2015 | FINAL REFUSAL WRITTEN |
Thursday, March 19, 2015 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, March 19, 2015 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, March 12, 2015 | ASSIGNED TO LIE |
Wednesday, March 4, 2015 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Wednesday, March 4, 2015 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, September 25, 2014 | REFUSAL PROCESSED BY IB |
Tuesday, September 9, 2014 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, September 9, 2014 | REFUSAL PROCESSED BY MPU |
Tuesday, September 9, 2014 | APPLICATION FILING RECEIPT MAILED |
Saturday, September 6, 2014 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, September 5, 2014 | NON-FINAL ACTION WRITTEN |
Friday, September 5, 2014 | ASSIGNED TO EXAMINER |
Friday, September 5, 2014 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, September 4, 2014 | SN ASSIGNED FOR SECT 66A APPL FROM IB |