Serial Number | 87682915 |
Word Mark | SAFETY THINK AHEAD QUALITY THINK AHEAD |
Filing Date | Monday, November 13, 2017 |
Status | 700 - REGISTERED |
Status Date | Tuesday, January 29, 2019 |
Registration Number | 5664406 |
Registration Date | Tuesday, January 29, 2019 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, November 13, 2018 |
Goods and Services | Pipe fabrication services, namely, custom manufacture of pipes; Pipe fusing, namely, pipe welding services; Industrial fabrication of energy pipelines and storage structures |
Description of Mark | The mark consists of a triangle with the upper portion in orange and the lower portion in black with a white line separating the two portions, with the word "SAFETY" in black over the orange portion and "THINK AHEAD" in white over the black portion, and the triangle is outlined in white and black. To the right is a triangle in an inverse direction with the upper portion in black and the lower portion in yellow with a white line separating the two portions, with the word "QUALITY" in black over the yellow portion and "THINK AHEAD" in white over the black portion, and the triangle is outlined in white and black. The remaining white appearing in the mark is background or transparent area and is not a part of the mark. |
Goods and Services | Construction project management and consultation services; Construction and installation of underground pipelines, utilities and renewable energy systems; Construction services, namely, planning, laying out and construction of pipelines and structures for the storage and transport of energy, natural gas, oil, electricity, water, aviation fuel, fiber optic cables, sewage and telecommunication lines with sustainability and the environment in mind; Construction services, namely, construction of energy pipelines and storage structures; Environmentally conscious and sustainable construction management, consulting and building service; Quality and safety-focused construction management, consulting and building services; Installation, repair, replacement and maintenance of utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware systems; Underground infrastructure construction, namely, trenching in the nature of subsurface excavation and trench construction for new utilities; Restoration in the field of utilities, namely, restoration of utility pipe networks; Replacement of utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware and septic systems; Repair of existing utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware and septic systems; Consultation services in the field of construction of environmentally-conscious buildings; General construction contracting; Laying and construction of pipelines; Pipeline construction and maintenance; Pipeline construction; Pipe laying services; Pipe milling services in the nature of pipeline construction and installation |
Indication of Colors claimed | The color(s) orange, yellow, black, and white is/are claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "SAFETY" AND "QUALITY" |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 24, 2017 |
Primary Code | 037 |
First Use Anywhere Date | Thursday, January 1, 2015 |
First Use In Commerce Date | Thursday, January 1, 2015 |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, August 31, 2018 |
Primary Code | 040 |
First Use Anywhere Date | Thursday, January 1, 2015 |
First Use In Commerce Date | Thursday, January 1, 2015 |
Party Name | CENTURI GROUP, INC. |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 03 - Corporation |
Address | PHOENIX, AZ 85027 |
Party Name | Centuri Construction Group, Inc. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | Phoenix, AZ 85027 |
Party Name | Centuri Construction Group, Inc. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | Phoenix, AZ 85027 |
Party Name | Centuri Construction Group, Inc. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Phoenix, AZ 85027 |
Event Date | Event Description |
Monday, January 29, 2024 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
Friday, December 9, 2022 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Friday, December 9, 2022 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Friday, December 9, 2022 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Wednesday, September 4, 2019 | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP |
Tuesday, January 29, 2019 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, November 13, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, November 13, 2018 | PUBLISHED FOR OPPOSITION |
Wednesday, October 24, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Thursday, September 20, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, September 20, 2018 | EXAMINER'S AMENDMENT ENTERED |
Thursday, September 20, 2018 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Thursday, September 20, 2018 | EXAMINERS AMENDMENT E-MAILED |
Thursday, September 20, 2018 | EXAMINERS AMENDMENT -WRITTEN |
Friday, August 31, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, August 31, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, August 31, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, August 15, 2018 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Tuesday, July 10, 2018 | ASSIGNED TO EXAMINER |
Monday, March 5, 2018 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Monday, March 5, 2018 | NON-FINAL ACTION E-MAILED |
Monday, March 5, 2018 | NON-FINAL ACTION WRITTEN |
Sunday, February 25, 2018 | ASSIGNED TO EXAMINER |
Saturday, November 25, 2017 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Friday, November 24, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, November 16, 2017 | NEW APPLICATION ENTERED |