Serial Number | 86451978 |
Word Mark | S STEP |
Filing Date | Wednesday, November 12, 2014 |
Status | 710 - CANCELLED - SECTION 8 |
Status Date | Friday, October 7, 2022 |
Registration Number | 4923819 |
Registration Date | Tuesday, March 22, 2016 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, April 14, 2015 |
Description of Mark | The mark consists of orange and blue stylized S with the word STEP below the S in black stylized font. To the right are Chinese characters in black stylized font. |
Goods and Services | Common metals and their alloys including stainless steel; Galena ores; Iron ores; Lead ores; Manganese ores; Materials of metal for railway construction; Metal building flashing; Metal building material, namely, fascia; Metal building materials, namely, ceiling boards and floor boards; Metal building materials, namely, soffits; Metal hardware for use in descending ropes, namely, belay devices; Metal hardware for use in descending ropes, namely, descenders; Metal hardware, namely, carabiners of metal; Metal hardware, namely, double-end swivels; Metal hardware, namely, general use wall and ceiling mounts for audio, video or computer equipment; Metal hardware, namely, karabiners of metal; Metal hardware, namely, nuts; Metal hardware, namely, pulleys; Metal hardware, namely, springs; Metal hardware, namely, washers; Metal ores; Metal railway crossovers; Modular metallic buildings; Non-electric cables and wires of common metals; Portable metal buildings; Pre-fabricated metal building assembly kits; Pre-packaged kits containing metal hardware in the nature of suspension clamps, yoke plates and connecting links and electrical protection devices in the nature of insulators, corona rings, armor-rods and surge arresters, all of which attach or connect transmission conductors to high voltage electric transmission towers; Prefabricated metal buildings; Railway points; Railway sleepers of metal; Small items of metal hardware, namely, high security locks and sheet metal plates primarily for the casino and gaming industry; Stair nosing of metal |
Indication of Colors claimed | The color(s) blue, orange and black is/are claimed as a feature of the mark. |
Transliteration Statement | The non-Latin characters in the mark transliterate to SI TAN PU and this means STEP in English. |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 2 - Sec. 8 - Entire Registration |
Class Status Date | Friday, October 7, 2022 |
Primary Code | 006 |
First Use Anywhere Date | Thursday, October 15, 2015 |
First Use In Commerce Date | Thursday, October 15, 2015 |
Party Name | Step Valve Manufacture Co., Ltd |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | Mesa, IL 85202 |
Party Name | Step Valve Manufacture Co., Ltd |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | Mesa, IL 85202 |
Party Name | Step Valve Manufacture Co., Ltd |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Mesa, IL 85202 |
Event Date | Event Description |
Friday, October 7, 2022 | CANCELLED SEC. 8 (6-YR) |
Monday, March 22, 2021 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
Tuesday, March 22, 2016 | REGISTERED-PRINCIPAL REGISTER |
Wednesday, February 17, 2016 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
Tuesday, February 16, 2016 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
Wednesday, January 27, 2016 | STATEMENT OF USE PROCESSING COMPLETE |
Monday, December 7, 2015 | USE AMENDMENT FILED |
Tuesday, January 19, 2016 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
Monday, December 7, 2015 | TEAS STATEMENT OF USE RECEIVED |
Tuesday, June 9, 2015 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Tuesday, April 14, 2015 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, April 14, 2015 | PUBLISHED FOR OPPOSITION |
Wednesday, March 25, 2015 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Thursday, March 5, 2015 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Tuesday, March 3, 2015 | ASSIGNED TO EXAMINER |
Thursday, November 20, 2014 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Wednesday, November 19, 2014 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Saturday, November 15, 2014 | NEW APPLICATION ENTERED IN TRAM |