Serial Number | 79353959 |
Word Mark | RETICTOR |
Filing Date | Thursday, June 9, 2022 |
Status | 700 - REGISTERED |
Status Date | Tuesday, March 5, 2024 |
Registration Number | 7318262 |
Registration Date | Tuesday, March 5, 2024 |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, December 19, 2023 |
Goods and Services | Operating biogas installations, namely, electricity generation, gas generation and heat generation; generation of gas and electricity; gas production services |
Goods and Services | Filtering machines for chemical processing and for separating the solid and liquid substrates in biogas installations, separators being waste and trash separator machines and being machines for separating the solid and liquid substrates in biogas installations, and centrifuges; filters being parts of machines for separating the solid and liquid substrates in biogas installations; feed pumps being parts of machines; conveyors being machines; rotating screw conveyors; biogas installations and parts therefor, namely, centrifugal separators for the extraction of fluids from fermentation substrates and agitators for the recirculation of thickened fermentation substrates; installations and machinery for the production of biogas and biomethane; pumps for machines |
Goods and Services | Tanks of metal, namely, metal storage tanks; metal structures, namely, bins; silos of metal; fermentation containers of metal for biogas installations for fermentation substrates |
Translation of Words in Mark | The wording "RETICTOR" has no meaning in a foreign language. |
Goods and Services | Filters for fluids, namely, for fermentation substrates; apparatus for filtering liquids and liquid and solid mixtures, in particular slurry, namely, apparatus for filtering of slurry and fermentation substrates; filters for fermentation containers for biogas installations, namely, filters for slurry and fermentation substrates; installations for treatment of waste sludge, namely, installations for filtering of slurry and fermentation substrates |
Goods and Services | Engineering services in the field of generating electricity, biogas and natural gas and renewable energy resources; Technological consultancy in the field of generating electricity, biogas, biogas installations, natural gas and renewable energy resources; Engineering project management services; Technological planning and consulting services in the field of biogas plants, plants for power generation and renewable energy resources; Conducting of technical feasibility studies, namely, conducting scientific feasibility studies; Design and development of regenerative energy generation systems; Drafting services being design and development of biogas installations |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 024, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 024, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | PlanET Biogas Group GmbH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 27 - NOT AVAILABLE |
Address | DE |
Party Name | PlanET Biogas Group GmbH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 27 - NOT AVAILABLE |
Address | DE |
Party Name | PlanET Biogas Group GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 27 - NOT AVAILABLE |
Address | DE |
Event Date | Event Description |
Thursday, November 3, 2022 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, November 4, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, November 8, 2022 | APPLICATION FILING RECEIPT MAILED |
Thursday, March 23, 2023 | ASSIGNED TO EXAMINER |
Monday, March 27, 2023 | NON-FINAL ACTION WRITTEN |
Tuesday, March 28, 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, May 15, 2023 | REFUSAL PROCESSED BY MPU |
Monday, May 15, 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, June 6, 2023 | REFUSAL PROCESSED BY IB |
Tuesday, August 8, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, August 8, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, August 9, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Sunday, October 1, 2023 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, November 11, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, November 29, 2023 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, November 29, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, November 29, 2023 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Tuesday, December 19, 2023 | PUBLISHED FOR OPPOSITION |
Tuesday, December 19, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, March 5, 2024 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, March 5, 2024 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
Thursday, June 6, 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Thursday, June 6, 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Thursday, June 6, 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, December 19, 2023 | NOTIFICATION PROCESSED BY IB |