Serial Number | 79375239 |
Word Mark | REMAGIN |
Filing Date | Thursday, June 15, 2023 |
Status | 686 - PUBLISHED FOR OPPOSITION |
Status Date | Tuesday, September 3, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, September 3, 2024 |
Goods and Services | Structures being portable building and transportable buildings, not of metal; building and construction materials and elements, not of metal, in the nature of gypsum and calcium silicate building materials, non-metal materials for constructing floors, walls and ceilings; prefabricated buildings, not of metal, transportable buildings, not of metal; building timber; non-metallic civil engineering structures, for building and construction, namely, engineered pre-assembled frames for building and engineered pre-assembled door, window, and cold frames for construction; non-metallic frames being nonmetal framework for building for use with partitions; framework, not of metal, for building; non-metallic modular building units, namely, non-metal modular homes comprised of wood; modular homes, not of metal; non-metallic modular units being modular nonmetal structures with a pre-assembled frame for public sector for constructing prefabricated buildings; prefabricated houses kits, not of metal, comprised primarily of non-metal modular homes and also including modular pre-assembled frames not of metal for building; prefabricated non-metal buildings; structural frameworks, not of metal, for buildings; transportable buildings of timber; gypsum for use as building materials; intumescent building materials, namely, fire resisting plasterboard; fiberboard being building materials; building and construction materials and elements in the nature of sheathing made of wood and artificial wood; drywall; gypsum boards for construction purposes; fibre cement; sheathing boards, not of metal; roofing materials being roof boards of wood and insulation not of metal, in the nature of non-metal building panels incorporating acoustic insulation for building purpose; non-metallic cladding materials being non-metal cladding for building; non-metallic flooring in the nature of non-metallic floor boards being a type of building material and non-metal floor panels incorporating acoustic insulation; ceilings, not of metal; non-metallic wall panels |
Goods and Services | Ready made metal building components, namely, construction elements made of metal being fabricated metal components for building loadbearing superstructures; steel building materials, namely, steel frames for building; steel frames for building; structural frames of metal for building; stud rails of metal for flats; space frames of metal for building; modular prefabricated steel framing for building; modular portable building units of metal, namely, metal modular portable homes; metal modular portable building structures, namely, modular external building envelopes to roofs and external walls of metal that is portable; modular metallic structures, namely, metal modular homes; metal modular building units, namely, modular metallic buildings; metal materials for construction, namely, metal piles; metal materials for building and construction, namely, steel angles for use in building construction, metal blocks for building; prefabricated metal framed buildings; ironmongery of metal for building, namely, metal latches and hinges for buildings; frameworks of metal, namely, framework of metal for building; framework of metal for building; frames of metal for building |
Goods and Services | Advisory services relating to the construction of buildings and other structures; building construction advisory services; building construction consultancy; construction consultancy; construction information; building construction services, namely, construction works for prefabricated houses; consultancy and information services relating to construction; consultancy relating to residential and building construction; consultancy, information and advisory services relating to the construction of public works; information services relating to the construction of buildings; installation of prefabricated building elements; providing information relating to building construction; providing information relating to building reconstruction; providing online information relating to building construction |
Goods and Services | Advisory services relating to building design; advisory services relating to design engineering; computer aided design services relating to building projects; computer assisted engineering design services; computer-aided engineering design services; computer-aided engineering design and drawing services; consultancy in the field of construction drafting; construction drafting; design of residential buildings; design of engineered building systems; design services for architecture; design services relating to architecture; design services relating to civil engineering; engineering and computer-aided engineering services |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 28, 2023 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 28, 2023 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 28, 2023 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 28, 2023 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Etex New Ways NV |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 32 - NOT AVAILABLE |
Address | BE |
Party Name | Etex New Ways NV |
Party Type | 10 - Original Applicant |
Legal Entity Type | 32 - NOT AVAILABLE |
Address | BE |
Event Date | Event Description |
Thursday, July 27, 2023 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, July 28, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, August 1, 2023 | APPLICATION FILING RECEIPT MAILED |
Monday, October 2, 2023 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
Monday, October 2, 2023 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Monday, October 2, 2023 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Monday, October 2, 2023 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Monday, October 2, 2023 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, March 14, 2024 | NON-FINAL ACTION WRITTEN |
Friday, March 15, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, April 1, 2024 | REFUSAL PROCESSED BY MPU |
Friday, May 31, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, May 31, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, May 31, 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, July 5, 2024 | FINAL REFUSAL E-MAILED |
Friday, July 5, 2024 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Friday, July 5, 2024 | FINAL REFUSAL WRITTEN |
Friday, July 26, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, July 26, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, July 26, 2024 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Tuesday, July 30, 2024 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Tuesday, July 30, 2024 | EXAMINERS AMENDMENT E-MAILED |
Tuesday, July 30, 2024 | EXAMINER'S AMENDMENT ENTERED |
Tuesday, July 30, 2024 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Tuesday, July 30, 2024 | EXAMINERS AMENDMENT -WRITTEN |
Wednesday, August 14, 2024 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Tuesday, September 3, 2024 | PUBLISHED FOR OPPOSITION |
Tuesday, September 3, 2024 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, April 23, 2024 | REFUSAL PROCESSED BY IB |
Tuesday, March 5, 2024 | ASSIGNED TO EXAMINER |
Tuesday, April 2, 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |