Serial Number | 79383504 |
Word Mark | REINFORCEKIT |
Filing Date | Friday, October 13, 2023 |
Status | 641 - NON-FINAL ACTION - MAILED |
Status Date | Monday, June 24, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Rubber, gutta-percha, gum in the nature of natural rubber, asbestos, mica and goods made from these materials and not included in other classes, namely, rubber sheets, rubber cords, electrical insulating mica products, asbestos felt, asbestos nets, pipe joint tapes, insulating tapes; plastics in extruded form for use in further manufacturing; packing and insulating materials; flexible tubes, not of metal, namely, rubber tubes, semi-processed plastic tubes, plastic tubes for pipe repair and general industrial use |
Pseudo Mark | REINFORCE KIT |
International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
US Class Codes | 001, 005, 012, 013, 035, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, November 20, 2023 |
Primary Code | 017 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | SAM 3X ENGINEERING |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | MC |
Event Date | Event Description |
Thursday, November 16, 2023 | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB |
Monday, June 24, 2024 | REFUSAL PROCESSED BY MPU |
Friday, November 17, 2023 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
Monday, November 20, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, November 24, 2023 | APPLICATION FILING RECEIPT MAILED |
Friday, May 31, 2024 | NON-FINAL ACTION WRITTEN |
Friday, May 31, 2024 | ASSIGNED TO EXAMINER |
Friday, June 14, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, June 24, 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Saturday, July 20, 2024 | REFUSAL PROCESSED BY IB |