
| Serial Number | 79066694 |
| Word Mark | RAICO |
| Filing Date | Monday, December 19, 2005 |
| Status | 706 - SECTION 71 ACCEPTED |
| Status Date | Thursday, March 4, 2021 |
| Registration Number | 3918919 |
| Registration Date | Tuesday, February 15, 2011 |
| Mark Drawing | 5 - Drawing with word(s) / letter(s) / number(s) in Stylized form |
| Published for Opposition Date | Tuesday, November 30, 2010 |
| Description of Mark | The mark consists of the word "RAICO" in red letters outlined in black. |
| Goods and Services | Non-metallic building materials, namely, non-metal profiles, rigid non-metal pipes, non-metal plates; sheets, namely, wood sheets, non-woven textile sheets, and sheet glass for building purposes; non-metal foils, namely, plastic, glass, and rubber foils for buildings, building facades and prefabricated buildings in the nature of conservatories, gazebos and houses and industrial structures in the nature of awnings and sunshades; non-metal windows; non-metal portals, namely, non-metal doors, non-metal gates, non-metal shutters, non-metal wickets, and non-metal doorway barriers; non-metal panels, namely, non-metal wainscots and non-metal sheathing; non-metal coverings, namely, non-metal wall panels, non-metal molding and non-metal casing; non-metal doors; non-metal facades for buildings, houses, and industrial structures; non-metal building materials for constructing roofs, namely, non-metal roof trusses, non-metal rafters and non-metal trellises; prefabricated buildings in the nature of conservatories not primarily of metal; non-metal window frames; prefabricated non-metal parts, namely, non-metal profiles, non-metal tubes, non-metal gussets and non-metal connectors for doors, windows, facades, canopies, gazebos and roofs of prefabricated buildings in the nature of conservatories; non-metal canopy roofs and non-metal cantilever roofs consisting primarily of non-metal frames, non-metal awnings and non-metal profiles; non-metal facade building systems and non-metal vertical-horizontal rod systems for support of awnings consisting primarily of non-metal profiles, non-metal tubes, non-metal gussets, non-metal rods, and non-metal connectors; non-metal window shutters, non-metal window blinds and roll shutters for indoor and outdoor use; all of the aforesaid goods made primarily of synthetic material, wood, glass, stone, or a combination of these materials |
| Goods and Services | [ Machines and machine tools for production, processing, and installation of building facades, profiles, tubes, plates, panels and connectors, all for use in the construction of buildings; pressroom machines, namely, cutting presses and drilling machines; cutters, namely, metal parting, slitting, and slicing machines; welding machines, namely, electric welding machines, gas welding machines, and laser welding machines; metal clamps used for holding in place parts on machine tool tables; notching machines for tubes, plates, panels, and profiles; shears, namely, metal shearing and clipping machines; machines parts in the nature of slide sweeps, servo drives and electric drives for operating windows, door wickets, hatches, canopies, and cantilever roofs; servo drives for operating window blinds, shade devices, and roller shutters; aforementioned goods excluding stump cutters, wood chippers, brush cutters, bulldozers, front end loaders and other machines used for logging or landscaping purposes; aforementioned goods excluding machines for positioning items during assembly, manufacturing, or packaging ] |
| Goods and Services | Metal building materials, namely, metal profiles, metal pipes, metal plates, sheet metal plates, metal foils, metal windows, metal portals, namely, metal doors, metal gates, metal shutters, metal wickets, and metal doorway barriers; metal panels, namely, metal wainscots and metal sheathing; metal coverings, namely, metal wall panels, metal molding and metal casing; metal hinges; metal window frames; metal facades for buildings, houses, and industrial structures; metal building materials for constructing roofs, namely, metal shingles, metal roof trusses, metal rafters, metal trellises and metal roofing tiles; prefabricated buildings in the nature of conservatories primarily made of metal; prefabricated metal parts, namely, metal profiles, metal tubes, metal gussets and metal connectors, for doors, windows, building facades, canopies, gazebos and roofs; prefabricated metal roofs and metal cantilever roofs consisting primarily of metal frames, metal awnings, and metal profiles; metal opening and closing devices for windows and doors; metal spring-loaded catches for windows, hatches, wickets and doors; metal armature wire; metal cover profiles for windows, window frames, doors, door frames and facades of prefabricated buildings in the nature of conservatories primarily made of metal; metal facade building systems and metal vertical-horizontal rod systems, consisting primarily of profiles and tubes, gussets, rods and connectors used as supports for metal awnings; metal window shutters, metal exterior blinds, metal roll shutters for indoor and outdoor use; metal screws, metal nuts, all the aforesaid goods made primarily of metal or metal combined with synthetic material, wood, glass or stone; metal locksmith goods, namely, metal locks, metal braces, metal hinges and parts therefor |
| Indication of Colors claimed | The color(s) red and black is/are claimed as a feature of the mark. |
| Goods and Services | [ Awnings ] |
| International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
| US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Saturday, April 28, 2012 |
| Primary Code | 006 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
| US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Wednesday, July 26, 2017 |
| Primary Code | 007 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Saturday, April 28, 2012 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 022 - Ropes, string, nets, tents, awnings, tarpaulins, sails, sacks and bags (not included in other classes); padding and stuffing materials (except of rubber or plastics); raw fibrous textile materials. |
| US Class Codes | 001, 002, 007, 019, 022, 042, 050 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Wednesday, July 26, 2017 |
| Primary Code | 022 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Raico Bautechnik GmbH |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | Pfaffenhausen 87772 DE |
| Party Name | Raico Bautechnik GmbH |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | DE |
| Party Name | Raico Bautechnik GmbH |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | DE |
| Event Date | Event Description |
| Thursday, April 9, 2009 | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB |
| Monday, April 13, 2009 | LIMITATION OF GOODS/SERVICES FROM IB ENTERED |
| Tuesday, April 14, 2009 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, April 14, 2009 | ASSIGNED TO EXAMINER |
| Saturday, April 18, 2009 | APPLICATION FILING RECEIPT MAILED |
| Thursday, April 23, 2009 | NON-FINAL ACTION WRITTEN |
| Friday, April 24, 2009 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Friday, April 24, 2009 | REFUSAL PROCESSED BY MPU |
| Friday, April 24, 2009 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Thursday, May 21, 2009 | REFUSAL PROCESSED BY IB |
| Tuesday, October 20, 2009 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Tuesday, October 20, 2009 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, October 20, 2009 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, October 20, 2009 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, November 17, 2009 | FINAL REFUSAL WRITTEN |
| Tuesday, November 17, 2009 | FINAL REFUSAL E-MAILED |
| Tuesday, November 17, 2009 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Tuesday, May 11, 2010 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Tuesday, May 11, 2010 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, May 11, 2010 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Wednesday, May 19, 2010 | FINAL REFUSAL WRITTEN |
| Wednesday, May 19, 2010 | FINAL REFUSAL E-MAILED |
| Wednesday, May 19, 2010 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Friday, May 28, 2010 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
| Friday, May 28, 2010 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
| Thursday, September 9, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Thursday, September 9, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, October 12, 2010 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Tuesday, October 5, 2010 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Tuesday, October 5, 2010 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, October 5, 2010 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Saturday, October 23, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Monday, October 25, 2010 | ASSIGNED TO LIE |
| Monday, October 25, 2010 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
| Thursday, November 4, 2010 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Thursday, November 4, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Thursday, November 11, 2010 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Thursday, November 11, 2010 | NEW REPRESENTATIVE AT IB RECEIVED |
| Thursday, November 11, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Thursday, November 18, 2010 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Thursday, November 18, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Saturday, November 20, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Thursday, November 25, 2010 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Thursday, November 25, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Saturday, November 27, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Tuesday, November 30, 2010 | PUBLISHED FOR OPPOSITION |
| Tuesday, November 30, 2010 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Friday, December 3, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Saturday, December 11, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Tuesday, February 15, 2011 | REGISTERED-PRINCIPAL REGISTER |
| Sunday, May 15, 2011 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Friday, May 20, 2011 | FINAL DISPOSITION PROCESSED |
| Friday, May 20, 2011 | FINAL DISPOSITION NOTICE SENT TO IB |
| Friday, June 22, 2012 | INTERNATIONAL REGISTRATION RENEWED |
| Saturday, November 17, 2012 | DEATH OF INTERNATIONAL REGISTRATION |
| Sunday, February 17, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Wednesday, February 15, 2017 | REGISTERED-SEC.71 FILED |
| Wednesday, February 15, 2017 | TEAS PETITION TO DIRECTOR RECEIVED |
| Friday, February 24, 2017 | ASSIGNED TO PETITION STAFF |
| Thursday, July 20, 2017 | CORRECTION TRANSACTION RECEIVED FROM IB |
| Monday, July 24, 2017 | REINSTATED |
| Monday, July 24, 2017 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Wednesday, July 26, 2017 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Wednesday, July 26, 2017 | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED |
| Wednesday, July 26, 2017 | REGISTERED - PARTIAL SEC 71 ACCEPTED |
| Wednesday, July 26, 2017 | NOTICE OF ACCEPTANCE OF SEC. 71 - MAILED |
| Sunday, August 27, 2017 | PETITION TO DIRECTOR DISMISSED |
| Monday, March 26, 2018 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Tuesday, April 3, 2018 | INVALIDATION PROCESSED |
| Tuesday, April 3, 2018 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
| Saturday, May 19, 2018 | PARTIAL INVALIDATION PROCESSED BY THE IB |
| Friday, October 5, 2018 | NEW REPRESENTATIVE AT IB RECEIVED |
| Sunday, February 7, 2021 | TEAS SECTION 71 RECEIVED |
| Thursday, March 4, 2021 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
| Thursday, November 4, 2021 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Saturday, April 23, 2022 | LIMITATION OF GOODS RECEIVED FROM IB |
| Thursday, March 4, 2021 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Thursday, March 4, 2021 | REGISTERED-SEC.71 ACCEPTED |
| Friday, July 1, 2022 | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
| Wednesday, February 19, 2025 | GENERIC MADRID TRANSACTION SENT TO IB |
| Wednesday, February 19, 2025 | GENERIC MADRID TRANSACTION CREATED |
| Thursday, May 12, 2022 | INTERNATIONAL REGISTRATION RENEWED |
| Wednesday, February 19, 2025 | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE |
| Saturday, April 12, 2025 | Further Decision Processed by IB |