
| Serial Number | 79205365 |
| Word Mark | PREVEX |
| Filing Date | Friday, February 10, 2017 |
| Status | 709 - CANCELLED - SECTION 71 |
| Status Date | Friday, October 18, 2024 |
| Registration Number | 5435394 |
| Registration Date | Tuesday, April 3, 2018 |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, January 16, 2018 |
| Goods and Services | water supply and sanitation equipment, namely, water closets, sinks, waste outlets in the nature of pipes being parts of sanitary facilities, toilets, bathtubs, bathtub enclosures, and showers; plumbing fixtures, namely, sink sprayers, shower mixers, shower sprayers, and sink traps; sanitary sewerage installations, namely, waste valves being plumbing fittings and pipes being parts of sanitary facilities; waste fittings for sanitary ware, namely, strainers for plumbing drains; waste fittings for baths, namely, drain structures for use in baths; flexible pipes as parts of sink, basin, shower and bath plumbing installations; plumbing fittings, namely, valves, baffles, traps, drains, couplers, cocks, bibbs, faucet filters, faucet aerators, sanitary pipes and joints for sanitary pipes, siphons, and shower and bathtub spouts; water control valves for faucets; plumbing fittings, namely, wash basin stoppers being parts of sanitary installations; taps; fittings for basins being parts of sanitary installations, namely, strainers for water lines and strainers for use with shower trays; fittings for the draining of water, namely, drains and strainers for plumbing drains; waste fittings for basins being parts of sanitary installations, namely, drains; waste assemblies for baths, namely, drain structures for use in baths; plumbing fittings, namely, bibcocks; tub wastes being tub parts; plumbing fittings, namely, spouts; plumbing fittings, namely, sink sprayers; plumbing fittings, namely, sink strainers; plumbing fittings, namely, faucet filters; plumbing fittings, namely, shower control valves; plumbing fittings, namely, tub control valves; plastic elbow bends for pipes being parts of sanitary installations; sanitary water fittings, namely, faucet filters, water faucet spouts, and strainers for water lines with overflow connection; waste pipes for sanitary installations; apparatus for the supply of water for sanitary purposes, namely, mixer faucets for water pipes; plumbing fittings, namely, sanitary drain armatures all for drip pipelines being parts of sanitary facilities, showers, basins and baths; shower mixing valves; washers for water taps; HVAC units; valves for air conditioners; evaporators for air conditioners |
| International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
| US Class Codes | 013, 021, 023, 031, 034 |
| Class Status Code | F - NOT AVAILABLE |
| Class Status Date | Friday, October 18, 2024 |
| Primary Code | 011 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Oy Prevex Ab |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | FI |
| Party Name | Oy Prevex Ab |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | FI |
| Party Name | Oy Prevex Ab |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | FI |
| Event Date | Event Description |
| Thursday, April 13, 2017 | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB |
| Monday, April 17, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Friday, April 21, 2017 | APPLICATION FILING RECEIPT MAILED |
| Friday, May 5, 2017 | ASSIGNED TO EXAMINER |
| Wednesday, May 10, 2017 | NON-FINAL ACTION WRITTEN |
| Thursday, May 11, 2017 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Thursday, May 18, 2017 | REFUSAL PROCESSED BY MPU |
| Thursday, May 18, 2017 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Saturday, June 3, 2017 | REFUSAL PROCESSED BY IB |
| Tuesday, September 26, 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, September 26, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, September 26, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, October 17, 2017 | FINAL REFUSAL WRITTEN |
| Tuesday, October 17, 2017 | FINAL REFUSAL E-MAILED |
| Tuesday, October 17, 2017 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Wednesday, November 29, 2017 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Wednesday, November 29, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Thursday, November 30, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Friday, December 1, 2017 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, December 27, 2017 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Wednesday, December 27, 2017 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, December 27, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Thursday, December 28, 2017 | NEW REPRESENTATIVE AT IB RECEIVED |
| Tuesday, January 16, 2018 | PUBLISHED FOR OPPOSITION |
| Tuesday, January 16, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Saturday, February 3, 2018 | NOTIFICATION PROCESSED BY IB |
| Tuesday, April 3, 2018 | REGISTERED-PRINCIPAL REGISTER |
| Tuesday, July 3, 2018 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Friday, July 6, 2018 | LIMITATION OF GOODS RECEIVED FROM IB |
| Tuesday, July 17, 2018 | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
| Wednesday, July 18, 2018 | FINAL DISPOSITION PROCESSED |
| Wednesday, July 18, 2018 | FINAL DISPOSITION NOTICE SENT TO IB |
| Friday, August 10, 2018 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Saturday, May 1, 2021 | NEW REPRESENTATIVE AT IB RECEIVED |
| Monday, April 3, 2023 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
| Friday, October 18, 2024 | CANCELLED SECTION 71 |
| Wednesday, June 18, 2025 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Wednesday, November 12, 2025 | INVALIDATION PROCESSED |
| Wednesday, November 12, 2025 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
| Sunday, November 30, 2025 | TOTAL INVALIDATION PROCESSED BY THE IB |