Serial Number | 85541924 |
Word Mark | PLANTFLOOR24 |
Filing Date | Tuesday, February 14, 2012 |
Status | 710 - CANCELLED - SECTION 8 |
Status Date | Thursday, June 6, 2024 |
Registration Number | 4265728 |
Registration Date | Tuesday, December 25, 2012 |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, July 10, 2012 |
Pseudo Mark | PLANT FLOOR 24 |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Engineering and engineering consulting services in the fields of information technology, automation, manufacturing, enterprise integration, EMI (enterprise manufacturing intelligence), EAI (enterprise application integration), and electronic business, namely, PLC (programmable logic controllers)/DCS (distributed control system) development and replacement; front-end engineering services; engineering project management; technological consulting services in the field of energy optimization, manufacturing plant documentation for operations, engineering, DCS (distributed control system)/HMI (human-machine interface) specification development and configuration; piping and instrumentation diagram development; piping and instrumentation design and development, process control functional description and specification development, detailed electrical instrumentation design, electrical instrument specification; medium-and low-voltage power distribution system design and implementation, hardwired safety interlock design, software safety interlock design, electrical heat trace design, electrical control cabinet construction, control cabinet design and layout, network design and layout, computer networking and system architecture design and implementation; Internet, intranet and extranet website design and development; custom database design and configuration; preparing engineering compliance reports; engineering consulting services, namely, technician calibration, outage services and planning, advanced process control solutions, demand planning, production planning and scheduling, logistics and distribution, manufacturing execution/production management, manufacturing intelligence, quality management, system health checks, product update monitoring, subsystem communication, system simulation; Remote monitoring in the field of industrial process controls systems, namely, PLC (programmable logic controllers), DCS (distributed control systems), and HMI (human machine interface) systems; Technical support services, namely, troubleshooting of industrial process control computer software problems; Maintenance of software used in PLC, DCS and HMI industrial process control systems; Providing engineering and engineering consulting services remotely in the fields of information technology, automation, manufacturing, and enterprise integration; remote computer network technical monitoring, software maintenance services, and data recovery services |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 2 - Sec. 8 - Entire Registration |
Class Status Date | Thursday, June 6, 2024 |
Primary Code | 042 |
First Use Anywhere Date | Monday, September 17, 2012 |
First Use In Commerce Date | Monday, September 17, 2012 |
Party Name | Maverick Technologies Holdings, LLC |
Party Type | 30 - Original Registrant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Columbia, IL 62236 |
Party Name | Maverick Technologies Holdings, LLC |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | Columbia, IL 62236 |
Party Name | Maverick Technologies Holdings, LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Columbia, IL 62236 |
Event Date | Event Description |
Wednesday, February 22, 2012 | NOTICE OF PSEUDO MARK MAILED |
Tuesday, February 21, 2012 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Monday, March 26, 2012 | ASSIGNED TO EXAMINER |
Saturday, March 31, 2012 | NON-FINAL ACTION WRITTEN |
Saturday, March 31, 2012 | NON-FINAL ACTION E-MAILED |
Saturday, March 31, 2012 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Tuesday, April 24, 2012 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, April 24, 2012 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, April 25, 2012 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, May 15, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Monday, June 4, 2012 | ASSIGNED TO LIE |
Thursday, June 7, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Wednesday, June 20, 2012 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Tuesday, July 10, 2012 | PUBLISHED FOR OPPOSITION |
Tuesday, July 10, 2012 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, September 4, 2012 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Thursday, October 25, 2012 | TEAS STATEMENT OF USE RECEIVED |
Thursday, October 25, 2012 | USE AMENDMENT FILED |
Monday, October 29, 2012 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
Monday, October 29, 2012 | STATEMENT OF USE PROCESSING COMPLETE |
Monday, November 19, 2012 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
Monday, November 19, 2012 | LAW OFFICE REGISTRATION REVIEW COMPLETED |
Tuesday, November 20, 2012 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
Tuesday, December 25, 2012 | REGISTERED-PRINCIPAL REGISTER |
Monday, December 25, 2017 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
Thursday, December 20, 2018 | TEAS SECTION 8 & 15 RECEIVED |
Thursday, December 20, 2018 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Wednesday, January 23, 2019 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Saturday, February 2, 2019 | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. |
Saturday, February 2, 2019 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED |
Saturday, December 25, 2021 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED |
Thursday, May 25, 2023 | TEAS SECTION 8 & 9 RECEIVED |
Monday, November 20, 2023 | POST REGISTRATION ACTION MAILED - SEC. 8 & 9 |
Thursday, June 6, 2024 | CANCELLED SEC. 8 (10-YR) |
Thursday, June 6, 2024 | NOTICE OF CANCELLATION SEC. 8 EMAILED |
Monday, November 20, 2023 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |