
| Serial Number | 79276337 |
| Word Mark | PICHLER STAHLBAU & FASSADEN |
| Filing Date | Monday, October 14, 2019 |
| Status | 700 - REGISTERED |
| Status Date | Tuesday, December 21, 2021 |
| Registration Number | 6592272 |
| Registration Date | Tuesday, December 21, 2021 |
| Mark Drawing | 5000 - Drawing with word(s) / letter(s) / number(s) in Stylized form |
| Published for Opposition Date | Tuesday, October 5, 2021 |
| Description of Mark | The mark consists of the stylized word "PICHLER" in blue. To the lower right in smaller stylized lettering are the words "Stahlbau & Fassaden" in blue. |
| Goods and Services | Non-metallic prefabricated buildings; transportable buildings of wood; transportable buildings, not of metal; concrete building elements, namely, concrete pipes, concrete panels, concrete vaults, concrete piles, concrete walls, concrete footings, concrete blocks, concrete beams, concrete bollards, concrete floors ; semi-worked construction wood; glass bricks; ceramic floor tiles and façade coverings; wall coverings non-metallic, namely, wall tiles not of metal, wall panels not of metal, non-metal wall cladding for building, wall boards; non-metallic reinforcement materials for construction, namely, reinforcing materials not of metal for building purposes; non-metallic modular animal stalls, non-metallic prefabricated stables; wooden window frames; wooden pipes for construction; insulating construction glass; insulating glass for construction |
| Goods and Services | Metal door frames; metal rods, namely, metal welding rods, metal brazing, metal reinforcing rod; metal architectural columns for construction; metal containers for storage or transport; roofing materials of metal, namely, metal roofing, metal roof flashing, metal roof trusses, metal roofing hips, metal roofing tiles, metal roofing panels, roofing covers of metal; transportable steel constructions; metal constructions, namely, metal piles, metal supports, metal braces, metal shores, fabricated metal components for building foundations, and metal cladding for construction and building; transportable metal constructions; metal windows; metal scaffolding; metal building materials, namely, metal floor panels, metal fascia, metal soffits, metal canopies, metal awnings, metal ceiling and floor boards, and metal reinforcing materials for building; metal refractory construction materials; metal doors; metal railings for bridges; metal wall cladding for construction; metal construction cladding; metal stairs; metal portable stairs; metal supports for construction; frames of metal for windows; metal partitions for building |
| Goods and Services | Building renovation; construction consultancy services relating to the construction of buildings and other structures; consultancy services relating to the maintenance, repair and renovation of buildings and engineering structures; building construction supervision services relating to shopping centers, industrial complexes, offices, residential buildings and other real estate structures; building construction supervision services concerning real estate projects; supervision of construction works for real estate projects; waterproofing services for basements and buildings |
| Pseudo Mark | PICHLER STAHLBAU AND FASSADEN |
| Indication of Colors claimed | The color(s) blue is/are claimed as a feature of the mark. |
| Translation of Words in Mark | The English translation of "STAHLBAU & FASSADEN" in the mark is "steel construction and facades". |
| Disclaimer with Predetermined Text | "STAHLBAU & FASSADEN" |
| Goods and Services | Consultancy in the field of technological design, namely, architectural design, building design, construction design; preparation of reports relating to technical architectural design studies for buildings; architectural services for the design of buildings; architectural services for the design of commercial buildings; architectural services for the design of industrial buildings; architectural services and engineering; civil engineering services; technical design studies in the field of construction, namely, architectural design, building design, construction design |
| International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
| US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Tuesday, January 14, 2020 |
| Primary Code | 006 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Tuesday, January 14, 2020 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Tuesday, January 14, 2020 |
| Primary Code | 037 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Tuesday, January 14, 2020 |
| Primary Code | 042 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Pichler Projects - Srl |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | IT |
| Party Name | Pichler Projects - Srl |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | IT |
| Party Name | Pichler Projects - Srl |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | IT |
| Event Date | Event Description |
| Monday, June 27, 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Saturday, June 4, 2022 | FINAL DISPOSITION NOTICE SENT TO IB |
| Friday, June 3, 2022 | FINAL DISPOSITION PROCESSED |
| Monday, March 21, 2022 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Tuesday, December 21, 2021 | REGISTERED-PRINCIPAL REGISTER |
| Sunday, October 10, 2021 | NOTIFICATION PROCESSED BY IB |
| Tuesday, October 5, 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Tuesday, October 5, 2021 | PUBLISHED FOR OPPOSITION |
| Wednesday, September 15, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Wednesday, September 15, 2021 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, September 15, 2021 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Saturday, August 28, 2021 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Thursday, July 29, 2021 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Wednesday, July 28, 2021 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, July 28, 2021 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Sunday, June 27, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Wednesday, June 9, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Wednesday, June 9, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Thursday, January 28, 2021 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Thursday, January 28, 2021 | FINAL REFUSAL E-MAILED |
| Thursday, January 28, 2021 | FINAL REFUSAL WRITTEN |
| Monday, January 11, 2021 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Monday, January 11, 2021 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Friday, January 8, 2021 | ASSIGNED TO LIE |
| Wednesday, September 30, 2020 | NOTICE OF REVIVAL - E-MAILED |
| Wednesday, September 30, 2020 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Wednesday, September 30, 2020 | PETITION TO REVIVE-GRANTED |
| Wednesday, September 30, 2020 | TEAS PETITION TO REVIVE RECEIVED |
| Wednesday, September 2, 2020 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
| Wednesday, September 2, 2020 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
| Friday, March 13, 2020 | REFUSAL PROCESSED BY IB |
| Friday, February 21, 2020 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Thursday, February 20, 2020 | REFUSAL PROCESSED BY MPU |
| Friday, January 24, 2020 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Thursday, January 23, 2020 | NON-FINAL ACTION WRITTEN |
| Saturday, January 18, 2020 | APPLICATION FILING RECEIPT MAILED |
| Friday, January 17, 2020 | ASSIGNED TO EXAMINER |
| Tuesday, January 14, 2020 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
| Thursday, January 9, 2020 | SN ASSIGNED FOR SECT 66A APPL FROM IB |