Serial Number | 79276962 |
Word Mark | PICHLER |
Filing Date | Monday, October 14, 2019 |
Status | 700 - REGISTERED |
Status Date | Tuesday, November 30, 2021 |
Registration Number | 6571253 |
Registration Date | Tuesday, November 30, 2021 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, September 14, 2021 |
Goods and Services | Non-metallic prefabricated buildings; transportable buildings of wood; transportable buildings, not of metal; concrete building elements, namely, concrete pipes, concrete panels, concrete vaults, concrete piles, concrete walls, concrete footings, concrete blocks, concrete beams, concrete bollards, concrete floors ; semi-worked construction wood; glass bricks; ceramic floor tiles and façade coverings; wall coverings non-metallic, namely, wall tiles not of metal, wall panels not of metal, non-metal wall cladding for building, wall boards; non-metallic reinforcement materials for construction, namely, reinforcing materials not of metal for building purposes; non-metallic modular animal stalls, non-metallic prefabricated stables; wooden window frames; wooden pipes for construction; insulating construction glass; insulating glass for construction |
Goods and Services | Metal door frames; metal rods, namely, metal welding rods, metal brazing, metal reinforcing rod; metal architectural columns for construction; metal containers for storage or transport; roofing materials of metal, namely, metal roofing, metal roof flashing, metal roof trusses, metal roofing hips, metal roofing tiles, metal roofing panels, roofing covers of metal; transportable steel constructions; metal constructions, namely, metal piles, metal supports, metal braces, metal shores, fabricated metal components for building foundations, and metal cladding for construction and building; transportable metal constructions; metal windows; metal scaffolding; metal building materials, namely, metal floor panels, metal fascia, metal soffits, metal canopies, metal awnings, metal ceiling and floor boards, and metal reinforcing materials for building; metal refractory construction materials; metal doors; metal railings for bridges; metal wall cladding for construction; metal construction cladding; metal stairs; metal portable stairs; metal supports for construction; frames of metal for windows; metal partitions for building |
Goods and Services | Building renovation; construction consultancy services relating to the construction of buildings and other structures; consultancy services relating to the maintenance, repair and renovation of buildings and engineering structures; building construction supervision services relating to shopping centers, industrial complexes, offices, residential buildings and other real estate structures; building construction supervision services concerning real estate projects; supervision of construction works for real estate projects; waterproofing services for basements and buildings |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Consultancy in the field of technological design, namely, architectural design, building design, construction design; preparation of reports relating to technical architectural design studies for buildings; architectural services for the design of buildings; architectural services for the design of commercial buildings; architectural services for the design of industrial buildings; architectural services and engineering; civil engineering services; technical design studies in the field of construction, namely, architectural design, building design, construction design |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, January 28, 2020 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, January 28, 2020 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, January 28, 2020 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, January 28, 2020 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Pichler Projects - Srl |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | IT |
Party Name | Pichler Projects - Srl |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | IT |
Party Name | Pichler Projects - Srl |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | IT |
Event Date | Event Description |
Sunday, June 12, 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, May 19, 2022 | FINAL DISPOSITION NOTICE SENT TO IB |
Wednesday, May 18, 2022 | FINAL DISPOSITION PROCESSED |
Monday, February 28, 2022 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, November 30, 2021 | REGISTERED-PRINCIPAL REGISTER |
Monday, September 20, 2021 | NOTIFICATION PROCESSED BY IB |
Tuesday, September 14, 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, September 14, 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, September 14, 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, September 14, 2021 | PUBLISHED FOR OPPOSITION |
Thursday, August 26, 2021 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Thursday, August 26, 2021 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Thursday, August 26, 2021 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, August 25, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, August 25, 2021 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, August 11, 2021 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, July 29, 2021 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, July 28, 2021 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, July 28, 2021 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Sunday, July 11, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, June 23, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, June 23, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Saturday, January 30, 2021 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Saturday, January 30, 2021 | FINAL REFUSAL E-MAILED |
Saturday, January 30, 2021 | FINAL REFUSAL WRITTEN |
Monday, January 11, 2021 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, January 11, 2021 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, January 8, 2021 | ASSIGNED TO LIE |
Wednesday, September 30, 2020 | NOTICE OF REVIVAL - E-MAILED |
Wednesday, September 30, 2020 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, September 30, 2020 | PETITION TO REVIVE-GRANTED |
Wednesday, September 30, 2020 | TEAS PETITION TO REVIVE RECEIVED |
Tuesday, September 8, 2020 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Tuesday, September 8, 2020 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Friday, March 13, 2020 | REFUSAL PROCESSED BY IB |
Wednesday, February 26, 2020 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Wednesday, February 26, 2020 | REFUSAL PROCESSED BY MPU |
Wednesday, February 5, 2020 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, February 4, 2020 | NON-FINAL ACTION WRITTEN |
Saturday, February 1, 2020 | APPLICATION FILING RECEIPT MAILED |
Tuesday, January 28, 2020 | ASSIGNED TO EXAMINER |
Tuesday, January 28, 2020 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, January 23, 2020 | SN ASSIGNED FOR SECT 66A APPL FROM IB |