Serial Number | 79354864 |
Word Mark | PEAK |
Filing Date | Friday, January 14, 2022 |
Status | 645 - FINAL REFUSAL - MAILED |
Status Date | Monday, February 26, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Description of Mark | The mark consists of the stylized term "PEAK." To the right of the term is a triangle design comprised of several curved bands. |
Goods and Services | Gasifiers; gas converters being gasifiers; gas compressors; compressors for gases; suction valves for gas compressors; electric compressors for gas generators; pumps for gas generators; air compressors; compressed air machines; inert gas-operated power generators being machines; filtering machines for cleansing gas; gas filters for machine motors and engines; membrane filters for use as parts of machines; filters being parts of gas compressing machines or engines; regulators being parts of machines; vacuum pumps for the extraction of gases; replacement parts and fittings specially adapted for all of the aforementioned goods; inert gas-operated power generators; installations, namely, inert gas-operated power generators |
Goods and Services | Machinery installation, maintenance and repair, namely installing, maintaining and repairing gas generators for use in scientific laboratories; repair or maintenance of laboratory apparatus and instruments, namely gas generators; providing information relating to the repair or maintenance of laboratory apparatus and instruments, namely gas generators; maintenance and repair of gas installations; maintenance, servicing and repair of gas generation equipment and components; repair of gas supply systems; installation of gas supply and distribution apparatus; rental of gas or air compressors; information, advisory and consultancy services relating to all of the aforementioned services |
Goods and Services | Gas generation equipment, namely, electrochemical gas generators; gas generators, namely, electrochemical gas generators; laboratory electrochemical gas generators; gas generation components specially adapted for electrochemical gas generators, namely, filters for gas conditioning, hydrogen fuel cells, membrane filters, carbon molecular sieves, air compressors and catalyst chambers; solenoid control valves for regulating the flow of gases, motherboards and printed circuit boards (PCBs) for gas generators, all of the foregoing being integral parts specially adapted for electrochemical gas generators; automatic nozzles specially adapted for electrochemical gas generators; hydrogen generators; membrane apparatus for generating nitrogen; zero air generators in the nature of air purifiers; dry air generators in the nature of air purifiers; heat regenerators being heat exchangers, other than parts of machines; gas heat generators; electric air dryers; air purifying apparatus and machines; air filtering installations; air sterilisers; gas scrubbing apparatus and gas purification apparatus; gas purifying installations and apparatus; gas purification apparatus; gas concentrators in the nature of dryers for the removal of water vapor from compressed gases; fuel processors, namely, gas purification machines; steam generators; steam reformers being steamers for chemical processing; oxygen generators, namely, membrane apparatus for generating oxygen; electrochemical gas generators; heat pumps for gas generators; total organic carbon generators in the nature of air purifiers; gas regulators; regulating accessories for gas apparatus, namely, gas regulators; gas recovery apparatus, namely, gas recycling system comprised primarily of swing adsorption equipment for the recovery of gases in industrial applications; cooling installations for gas; gas chromatography apparatus for industrial use; chromatography apparatus for industrial purposes; filters for cleaning gases being parts of household or industrial installations, namely, filters for gas conditioning; electric fans for gas extractors; filters for gas extractors, namely, filters for gas conditioning; separators for purifying gas; replacement parts and fittings specially adapted for all of the aforementioned goods |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 024, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Monday, November 14, 2022 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 024, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Monday, November 14, 2022 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Monday, November 14, 2022 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Peak Scientific Instruments Limited |
Party Type | 10 - Original Applicant |
Legal Entity Type | 24 - NOT AVAILABLE |
Address | GB |
Event Date | Event Description |
Wednesday, April 10, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, April 10, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Monday, February 26, 2024 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Monday, February 26, 2024 | FINAL REFUSAL E-MAILED |
Monday, February 26, 2024 | FINAL REFUSAL WRITTEN |
Friday, February 9, 2024 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Wednesday, August 2, 2023 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Wednesday, August 2, 2023 | LETTER OF SUSPENSION E-MAILED |
Wednesday, August 2, 2023 | SUSPENSION LETTER WRITTEN |
Thursday, July 20, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, July 19, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, July 19, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, February 15, 2023 | REFUSAL PROCESSED BY IB |
Friday, January 20, 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, January 20, 2023 | REFUSAL PROCESSED BY MPU |
Friday, November 18, 2022 | APPLICATION FILING RECEIPT MAILED |
Tuesday, November 15, 2022 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, November 14, 2022 | NON-FINAL ACTION WRITTEN |
Monday, November 14, 2022 | ASSIGNED TO EXAMINER |
Monday, November 14, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, November 10, 2022 | SN ASSIGNED FOR SECT 66A APPL FROM IB |