Serial Number | 79181520 |
Word Mark | PARTENA |
Filing Date | Thursday, August 20, 2015 |
Status | 709 - CANCELLED - SECTION 71 |
Status Date | Friday, March 3, 2023 |
Registration Number | 5024678 |
Registration Date | Tuesday, August 23, 2016 |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, June 7, 2016 |
Goods and Services | Non-freestanding partitions, movable partitions, and removable partitions for building, in particular for bathroom, shower, WC, changing room cubicles, glass stops, doors, and windows, all these products being wholly or substantially not of metal; non metal parts for the structure, assembly, connecting and fastening of the aforementioned products, in particular building panels, door kick plates, posts, poles, crosspieces, latch bars, pipes, rails, wainscoting, profiles, fish plates in the nature of hardware for fastening rails, frames for building, hinges, fittings for doors and windows, casters, door stops, pipe connectors, holders for signs; joinery not of metal, namely, wood joints; door frames not of metal; cladding not of metal for building; building materials, not of metal, namely, soffits, fascia, and ceiling boards; partitions not of metal for building; cupboards not of metal; lockers and accessories not of metal, namely, rails, posts, sliding poles for electric lines, connecting pieces in the nature of wood joints, glass door stops, door frames, wainscoting, doors, profiles in the nature of decorative moldings for use in building construction, cladding panels for building; all the aforementioned products not for display, stands, exhibitions or trade fairs |
Goods and Services | Non-freestanding partitions, movable partitions, and removable partitions for building, in particular for bathroom, shower, WC, changing room cubicles, glass stops, doors, and windows, all these products being wholly or substantially of metal; metal parts for the structure, assembly, connecting and fastening of the aforementioned products, in particular building panels, door kick plates, posts, poles, crosspieces, latch bars, pipes, rails, wainscoting, profiles, fish plates in the nature of hardware for fastening rails, frames for building, hinges, fittings for doors and windows, casters, door stops, pipe connectors, holders for signs; ironmongery and small items of metal hardware, namely, nuts, pulleys, springs, washers, and pulls; screws and bolts of metal; joinery of metal; door frames of metal; cladding of metal for building; building materials of metal, namely, soffits, fascia, and ceiling boards; partitions of metal for building; cupboards of metal; lockers and accessories of metal, namely, rails, posts, sliding poles, connecting pieces in the nature of anchors, glass door stops, frames for building, wainscoting, doors, profiles, cladding panels; all the aforementioned products not for display, stands, exhibitions or trade fairs |
Translation of Words in Mark | The wording "PARTENA" has no meaning in a foreign language. |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, March 3, 2023 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, March 3, 2023 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | PARTENA |
Party Type | 32 - New Owner After Registration |
Legal Entity Type | 98 - Unknown |
Address | FR |
Party Name | CLOISONS PARTENA |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 99 - Other |
Address | FR |
Party Name | QOVANS INDUSTRIE |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | FR |
Party Name | QOVANS INDUSTRIE |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | FR |
Party Name | QOVANS INDUSTRIE |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | FR |
Event Date | Event Description |
Wednesday, February 17, 2016 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Thursday, February 4, 2016 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Tuesday, February 9, 2016 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, February 9, 2016 | ASSIGNED TO EXAMINER |
Saturday, February 13, 2016 | APPLICATION FILING RECEIPT MAILED |
Tuesday, February 16, 2016 | NON-FINAL ACTION WRITTEN |
Tuesday, March 22, 2016 | FINAL REFUSAL WRITTEN |
Thursday, February 18, 2016 | REFUSAL PROCESSED BY MPU |
Friday, February 19, 2016 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, March 1, 2016 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, March 11, 2016 | REFUSAL PROCESSED BY IB |
Monday, March 14, 2016 | ASSIGNED TO LIE |
Monday, March 21, 2016 | CORRECTION CREATED FOR IB |
Monday, March 21, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, March 21, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, March 21, 2016 | CORRECTION SENT TO IB |
Wednesday, June 1, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Tuesday, March 22, 2016 | FINAL REFUSAL MAILED |
Wednesday, April 20, 2016 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Wednesday, April 20, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, April 20, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, April 22, 2016 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, April 22, 2016 | ASSIGNED TO LIE |
Friday, April 29, 2016 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Wednesday, May 18, 2016 | NOTICE OF PUBLICATION |
Wednesday, June 1, 2016 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Friday, October 20, 2017 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Tuesday, June 7, 2016 | PUBLISHED FOR OPPOSITION |
Friday, July 15, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Tuesday, August 23, 2016 | REGISTERED-PRINCIPAL REGISTER |
Wednesday, November 23, 2016 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, November 29, 2016 | FINAL DISPOSITION PROCESSED |
Tuesday, November 29, 2016 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, August 25, 2017 | CORRECTION TRANSACTION RECEIVED FROM IB |
Friday, August 25, 2017 | USPTO CORRECTION PROCESSED BY IB |
Wednesday, September 13, 2017 | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
Friday, March 4, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, March 3, 2023 | CANCELLED SECTION 71 |
Friday, November 3, 2023 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Sunday, September 29, 2024 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Sunday, December 31, 2023 | CHANGE OF OWNER RECEIVED FROM IB |
Monday, November 6, 2023 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Monday, November 6, 2023 | INVALIDATION PROCESSED |
Monday, November 27, 2023 | TOTAL INVALIDATION PROCESSED BY THE IB |