Serial Number | 98794632 |
Word Mark | PARISH BUILT |
Filing Date | Thursday, October 10, 2024 |
Status | 641 - NON-FINAL ACTION - MAILED |
Status Date | Monday, April 14, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Description of Mark | The mark consists of The mark consists of a shield-shaped design outlined in green. Within the shield, at the top, is a stylized green map of Louisiana with parish boundaries and white lines for rivers. On either side of the map are sets of horizontal blue lines decreasing in width, creating a sense of movement. Inside the shield is a green rectangular banner with rounded corners and a blue outline. The banner contains the stylized wording "PARISH BUILT" in white capital letters, with "BUILT" in a smaller font size below "PARISH". White horizontal lines are on both sides of "BUILT". The background of the shield is white, and there are additional blue horizontal lines at the bottom of the shield below the banner. |
Goods and Services | Roofing repair; Roofing services; Maintenance of roofing |
Indication of Colors claimed | The color(s) Green is/are claimed as a feature of the mark. |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, October 10, 2024 |
Primary Code | 037 |
First Use Anywhere Date | Wednesday, October 9, 2024 |
First Use In Commerce Date | Wednesday, October 9, 2024 |
Party Name | PARISH CONSTRUCTION & ROOFING LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Baton Rouge, LA 70810 |
Event Date | Event Description |
Thursday, October 10, 2024 | NEW APPLICATION ENTERED |
Thursday, October 10, 2024 | APPLICATION FILING RECEIPT MAILED |
Friday, April 11, 2025 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Friday, April 11, 2025 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Monday, April 14, 2025 | ASSIGNED TO EXAMINER |
Monday, April 14, 2025 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Monday, April 14, 2025 | NON-FINAL ACTION WRITTEN |
Monday, April 14, 2025 | NON-FINAL ACTION E-MAILED |