Serial Number | 79259971 |
Word Mark | PARABUILD |
Filing Date | Tuesday, April 2, 2019 |
Status | 700 - REGISTERED |
Status Date | Tuesday, December 31, 2019 |
Registration Number | 5946976 |
Registration Date | Tuesday, December 31, 2019 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, October 15, 2019 |
Goods and Services | Downloadable computer software for computer aided design (CAD), drafting and modelling; downloadable software for building information modelling (BIM); downloadable software for managing construction projects and data; downloadable software for creating virtual 3D models of construction projects; downloadable software to automatically generate 2D fabrication data and computer numerical control (CNC) files from 3D models; downloadable data processing software; downloadable software for processing images, graphics and text; 3D computer graphics software; downloadable software to design and draft construction and engineering projects; downloadable software for generating drawings, work and fabrication documents; downloadable software for operating, accessing and using a cloud computing network |
Pseudo Mark | PARA BUILD |
Goods and Services | Creation, development, installation, maintenance and updating of registered computer programs and software; computer programming; design and development of software for computer aided design (CAD), drafting and modelling, building information modelling (BIM), software for managing construction projects and data, software for creating virtual 3D models of construction projects, software to automatically generate 2D fabrication data and computer numerical control (CNC) files from 3D models, data processing software, software for processing digital images, software for processing images, graphics and text, software to design and draft construction and engineering projects, software for steel and concrete construction and engineering projects, software for generating drawings, work and fabrication documents; rental of software; computer software consultation in the fields of software as a service (SAAS) and platform as a service (PAAS); providing temporary use of non-downloadable software for computer aided design (CAD), drafting and modelling, building information modelling (BIM), managing construction projects and data, creating virtual 3D models of construction projects, to automatically generate 2D fabrication data and computer numerical control (CNC) files from 3D models, data processing, for processing images, graphics and text, to design and draft construction and engineering projects, and for generating drawings, work and fabrication documents |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Friday, June 7, 2019 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, June 7, 2019 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | PARABUILD INTERNATIONAL BV |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 99 - Other |
Address | BE |
Party Name | CAD Systems NV |
Party Type | 30 - Original Registrant |
Legal Entity Type | 32 - NOT AVAILABLE |
Address | BE |
Party Name | CAD Systems NV |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 32 - NOT AVAILABLE |
Address | BE |
Party Name | CAD Systems NV |
Party Type | 10 - Original Applicant |
Legal Entity Type | 32 - NOT AVAILABLE |
Address | BE |
Event Date | Event Description |
Sunday, March 24, 2024 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, January 7, 2023 | CHANGE OF OWNER RECEIVED FROM IB |
Sunday, January 1, 2023 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Sunday, January 1, 2023 | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS |
Sunday, January 1, 2023 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Sunday, January 1, 2023 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Friday, May 8, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, April 17, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, April 16, 2020 | FINAL DISPOSITION PROCESSED |
Tuesday, March 31, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, January 7, 2020 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Tuesday, December 31, 2019 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, October 15, 2019 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, October 15, 2019 | PUBLISHED FOR OPPOSITION |
Saturday, October 12, 2019 | NOTIFICATION PROCESSED BY IB |
Wednesday, September 25, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, September 25, 2019 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, September 25, 2019 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Monday, September 9, 2019 | ASSIGNED TO LIE |
Saturday, September 7, 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Tuesday, August 27, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, August 27, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, August 27, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, July 19, 2019 | REFUSAL PROCESSED BY IB |
Tuesday, July 2, 2019 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, July 2, 2019 | REFUSAL PROCESSED BY MPU |
Friday, June 14, 2019 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Thursday, June 13, 2019 | NON-FINAL ACTION WRITTEN |
Wednesday, June 12, 2019 | ASSIGNED TO EXAMINER |
Tuesday, June 11, 2019 | APPLICATION FILING RECEIPT MAILED |
Friday, June 7, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, June 6, 2019 | SN ASSIGNED FOR SECT 66A APPL FROM IB |