NITRO Trademark

Trademark Overview


On Tuesday, May 29, 2018, a trademark application was filed for NITRO with the United States Patent and Trademark Office. The USPTO has given the NITRO trademark a serial number of 87938944. The federal status of this trademark filing is REGISTERED as of Tuesday, January 5, 2021. This trademark is owned by Nitro Construction Services, Inc.. The NITRO trademark is filed in the Construction & Repair Services, Transportation & Storage Services, Treatment & Processing of Materials Services, Computer & Software Services & Scientific Services, Personal, and Legal & Social Services categories with the following description:

Building Construction Services; Electrical contractor services; Mechanical Contractor Services; HVAC/R contractor services; Pipe erection services; Construction services, namely, maintenance and installation of building construction machines and equipment; millwright services, namely, installation and repair of scaffolding and building construction equipment and machines; installation and maintenance of systems for building security, safety, and electricity; Machinery retrofit and conversion services; Installation and maintenance of building automation systems; consulting services in the field of construction of electrical systems and power monitoring stations; Installation and maintenance of Uninterruptible Power Systems for buildings; installation and maintenance of wireless access control systems for buildings; building construction services, namely, retrofitting of fire sprinkler systems; installation, repair and maintenance of fire sprinkler systems, fire alarm systems, fire extin...

Underground and above ground water supply services

Custom fabrication of pipes and custom fabrication of fire sprinkler systems

Mechanical engineering services; architectural design services for commercial and industrial buildings; Consulting services in the field of building automation; Testing of Fiber optic and ethernet network infrastructure cabling performance and quality and for determining conformity with certification standards; monitoring electrical systems for electrical disturbances and power quality, and logging results; ARC flash testing to determine the heat transfer response through a material, fabric, or fabric system when exposed to the thermal energy from an electric arc for use in the building and construction industry; calculation of hydraulic pressure for fire sprinkler systems; design, inspection, and testing of fire sprinkler systems, fire alarm systems, fire extinguishers, fire hydrants, fire pumps, standpipe systems, backflow prevention systems, and foam systems; design of fire sprinkler systems, fire alarm systems

Fire alarm and building security alarm monitoring
nitro

General Information


Serial Number87938944
Word MarkNITRO
Filing DateTuesday, May 29, 2018
Status700 - REGISTERED
Status DateTuesday, January 5, 2021
Registration Number6236138
Registration DateTuesday, January 5, 2021
Mark Drawing4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form
Published for Opposition DateTuesday, October 20, 2020

Trademark Statements


Goods and ServicesBuilding Construction Services; Electrical contractor services; Mechanical Contractor Services; HVAC/R contractor services; Pipe erection services; Construction services, namely, maintenance and installation of building construction machines and equipment; millwright services, namely, installation and repair of scaffolding and building construction equipment and machines; installation and maintenance of systems for building security, safety, and electricity; Machinery retrofit and conversion services; Installation and maintenance of building automation systems; consulting services in the field of construction of electrical systems and power monitoring stations; Installation and maintenance of Uninterruptible Power Systems for buildings; installation and maintenance of wireless access control systems for buildings; building construction services, namely, retrofitting of fire sprinkler systems; installation, repair and maintenance of fire sprinkler systems, fire alarm systems, fire extinguishers, fire hydrants, fire pumps, standpipe systems, backflow prevention systems, and foam systems; laying pipe for accessing underground and above ground water sources; installation and maintenance of Power over Ethernet devices and systems in connection with construction projects; installation and maintenance of computer hardware systems for building automation, building security, HVAC, fire and smoke detection, prevention, and extinguishing, building access and building access controls, IOT (internet of things) as related to networks for buildings and construction projects, and closed circuit television
Goods and ServicesUnderground and above ground water supply services
Goods and ServicesCustom fabrication of pipes and custom fabrication of fire sprinkler systems
Goods and ServicesMechanical engineering services; architectural design services for commercial and industrial buildings; Consulting services in the field of building automation; Testing of Fiber optic and ethernet network infrastructure cabling performance and quality and for determining conformity with certification standards; monitoring electrical systems for electrical disturbances and power quality, and logging results; ARC flash testing to determine the heat transfer response through a material, fabric, or fabric system when exposed to the thermal energy from an electric arc for use in the building and construction industry; calculation of hydraulic pressure for fire sprinkler systems; design, inspection, and testing of fire sprinkler systems, fire alarm systems, fire extinguishers, fire hydrants, fire pumps, standpipe systems, backflow prevention systems, and foam systems; design of fire sprinkler systems, fire alarm systems
Goods and ServicesFire alarm and building security alarm monitoring

Classification Information


International Class037 - Building construction; repair; installation services.
US Class Codes100, 103, 106
Class Status Code6 - Active
Class Status DateMonday, June 4, 2018
Primary Code037
First Use Anywhere DateThursday, November 30, 1967
First Use In Commerce DateThursday, November 30, 1967

International Class039 - Transport; packaging and storage of goods; travel arrangement.
US Class Codes100, 105
Class Status Code6 - Active
Class Status DateFriday, March 8, 2019
Primary Code039
First Use Anywhere DateThursday, November 30, 1967
First Use In Commerce DateThursday, November 30, 1967

International Class040 - Treatment of materials.
US Class Codes100, 103, 106
Class Status Code6 - Active
Class Status DateMonday, June 4, 2018
Primary Code040
First Use Anywhere DateThursday, November 30, 1967
First Use In Commerce DateThursday, November 30, 1967

International Class042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software.
US Class Codes100, 101
Class Status Code6 - Active
Class Status DateMonday, June 4, 2018
Primary Code042
First Use Anywhere DateThursday, November 30, 1967
First Use In Commerce DateThursday, November 30, 1967

International Class045 - Legal services; security services for the protection of property and individuals; personal and social services rendered by others to meet the needs of individuals.
US Class Codes100, 101
Class Status Code6 - Active
Class Status DateFriday, March 8, 2019
Primary Code045
First Use Anywhere DateThursday, November 30, 1967
First Use In Commerce DateThursday, November 30, 1967

Trademark Owner History


Party NameNitro Construction Services, Inc.
Party Type30 - Original Registrant
Legal Entity Type03 - Corporation
AddressNitro, WV 25143

Party NameNitro Construction Services, Inc.
Party Type20 - Owner at Publication
Legal Entity Type03 - Corporation
AddressNitro, WV 25143

Party NameNitro Construction Services, Inc.
Party Type10 - Original Applicant
Legal Entity Type03 - Corporation
AddressNitro, WV 25143

Trademark Events


Event DateEvent Description
Tuesday, January 5, 2021REGISTERED-PRINCIPAL REGISTER
Tuesday, October 20, 2020OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Tuesday, October 20, 2020PUBLISHED FOR OPPOSITION
Wednesday, September 30, 2020NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Friday, September 11, 2020LAW OFFICE PUBLICATION REVIEW COMPLETED
Thursday, September 3, 2020APPROVED FOR PUB - PRINCIPAL REGISTER
Thursday, September 3, 2020EXAMINER'S AMENDMENT ENTERED
Thursday, September 3, 2020NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Thursday, September 3, 2020EXAMINERS AMENDMENT E-MAILED
Thursday, September 3, 2020EXAMINERS AMENDMENT -WRITTEN
Wednesday, September 2, 2020PREVIOUS ALLOWANCE COUNT WITHDRAWN
Tuesday, August 25, 2020WITHDRAWN FROM PUB - OG REVIEW QUERY
Wednesday, August 12, 2020APPROVED FOR PUB - PRINCIPAL REGISTER
Friday, August 7, 2020EXAMINER'S AMENDMENT ENTERED
Thursday, August 6, 2020NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Thursday, August 6, 2020EXAMINERS AMENDMENT E-MAILED
Thursday, August 6, 2020EXAMINERS AMENDMENT -WRITTEN
Tuesday, June 2, 2020NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Tuesday, June 2, 2020LETTER OF SUSPENSION E-MAILED
Tuesday, June 2, 2020SUSPENSION LETTER WRITTEN
Friday, May 8, 2020TEAS/EMAIL CORRESPONDENCE ENTERED
Friday, May 8, 2020CORRESPONDENCE RECEIVED IN LAW OFFICE
Thursday, May 7, 2020TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Wednesday, April 29, 2020REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Wednesday, April 29, 2020ASSIGNED TO LIE
Tuesday, October 15, 2019REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Thursday, March 28, 2019NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Thursday, March 28, 2019LETTER OF SUSPENSION E-MAILED
Thursday, March 28, 2019SUSPENSION LETTER WRITTEN
Friday, March 8, 2019TEAS/EMAIL CORRESPONDENCE ENTERED
Thursday, March 7, 2019CORRESPONDENCE RECEIVED IN LAW OFFICE
Thursday, March 7, 2019TEAS RESPONSE TO OFFICE ACTION RECEIVED
Thursday, September 20, 2018NOTIFICATION OF NON-FINAL ACTION E-MAILED
Thursday, September 20, 2018NON-FINAL ACTION E-MAILED
Thursday, September 20, 2018NON-FINAL ACTION WRITTEN
Tuesday, September 18, 2018ASSIGNED TO EXAMINER
Monday, June 4, 2018NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM
Friday, June 1, 2018NEW APPLICATION ENTERED IN TRAM