Serial Number | 79382780 |
Word Mark | NEXULA |
Filing Date | Thursday, August 10, 2023 |
Status | 681 - PUBLICATION/ISSUE REVIEW COMPLETE |
Status Date | Tuesday, November 5, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, November 26, 2024 |
Goods and Services | Thermal insulating materials; thermal insulating materials for use in the aircraft industry; thermal insulating materials for use in energy storage applications; aerogel-based insulation products, namely, aerogel-based insulation being insulating materials for use in the automotive industry, in the aircraft industry, in the transportation industry, and for energy storage applications; insulating materials, namely, thermal insulation to act as a thermal and fire barrier; insulating materials, namely, thermal insulation to prevent thermal runaway; thermal insulating materials for use in the transportation industry; thermal insulating materials for use in the automotive industry; insulating materials; insulation materials for pipes for industrial oil, gas, liquefied natural gas and hydrogen; aerogel based insulation products, namely, aerogel based insulation materials for oil and gas, offshore liquid natural gas production, shipping and storage, clothing and apparel, military, aerospace, energy production, distribution and conservation, petrochemical, building and construction, automotive, appliances, refrigeration, cold chain and utility industries; insulation materials for oil pipelines; building insulation; acoustical insulation for buildings; insulating felt for use in footwear, clothing, automobiles, aircrafts and industrial equipment; insulators for electrical cables; thermally insulated supports for pipes and pipelines; aerogel based insulating material for use in electronic device, road paving; aerogel based thermal insulation materials for use in batteries and battery manufacturing; insulation materials for heat preservation; insulation material for pipes |
Goods and Services | Compositions for preventing fire, namely, aerogel-based compositions for blocking heat and fire inside and outside the batteries; aerogel being industrial chemicals for use in batteries and battery manufacturing; aerogel being industrial chemicals for insulation |
International Class | 001 - Chemicals used in industry, science and photography, as well as in agriculture, horticulture and forestry; unprocessed artificial resins; unprocessed plastics; manures; fire extinguishing compositions; tempering and soldering preparations; chemical substances for preserving foodstuffs; tanning substances; adhesives used in industry. |
US Class Codes | 001, 005, 006, 010, 026, 046 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, November 16, 2023 |
Primary Code | 001 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
US Class Codes | 001, 005, 012, 013, 035, 050 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, November 16, 2023 |
Primary Code | 017 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | LG CHEM, LTD. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | KR |
Event Date | Event Description |
Thursday, November 9, 2023 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Thursday, November 16, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, November 21, 2023 | APPLICATION FILING RECEIPT MAILED |
Wednesday, March 27, 2024 | ASSIGNED TO EXAMINER |
Monday, April 1, 2024 | NON-FINAL ACTION WRITTEN |
Tuesday, April 2, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, April 19, 2024 | REFUSAL PROCESSED BY MPU |
Friday, April 19, 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, May 14, 2024 | REFUSAL PROCESSED BY IB |
Friday, October 4, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, October 4, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, October 4, 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, October 30, 2024 | APPROVED FOR PUB - PRINCIPAL REGISTER |