Serial Number | 90439879 |
Word Mark | NEWORLD ENERGY |
Filing Date | Thursday, December 31, 2020 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Tuesday, January 30, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Production of energy in buildings via renewable resources for use in facilitating the cyber secure and optimal use of Grid, Solar, Bi-directional chargers and storage systems to power all buildings and to the power grid; generation of energy, namely, conversion and combination of Grid AC power with Solar, Bi-directional chargers and stored DC power into whole building variable frequency and voltage AC power for highest electrical appliance and device energy efficiency and run time |
Goods and Services | Apparatuses which isolate and transform the electrical power from the Grid, Solar, EV Bi - directional Chargers and Energy Storage systems in buildings into a microgrid, namely, energy efficient apparatuses and systems comprised of downloadable renewable energy interface software and downloadable buffer and control software for controlling and regulating power and loads, electrical integrated control systems for use in buildings the field of electric microgrid energy, Electrical controllers comprising hardware with embedded software for use in managing a building's power from the Grid, EV Bi-directional chargers, Solar and Energy Storage and to monitor and control the function and status of comprised of the controller, batteries, power conversion systems, power meters, and an energy sources, building energy management and control system for balancing energy resources with electrical demand in order to conserve energy comprised of computers, recorded operating software, bus bars, inverters, electrical switches, switchgear, circuit breakers, and containing electricity generators, all for the purpose of highest energy efficiency and resilient self-consumption of renewable energy and Grid balancing on demand |
Disclaimer with Predetermined Text | "ENERGY" |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Monday, March 29, 2021 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Monday, March 29, 2021 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Neworld.Energy, LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Reno, NV 89509 |
Event Date | Event Description |
Tuesday, January 30, 2024 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
Tuesday, January 30, 2024 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
Tuesday, January 30, 2024 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Monday, October 16, 2023 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Monday, October 16, 2023 | FINAL REFUSAL E-MAILED |
Monday, October 16, 2023 | FINAL REFUSAL WRITTEN |
Monday, September 18, 2023 | ASSIGNED TO EXAMINER |
Tuesday, August 8, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, August 8, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, August 8, 2023 | ASSIGNED TO LIE |
Thursday, March 30, 2023 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
Thursday, February 23, 2023 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Monday, July 18, 2022 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Wednesday, March 9, 2022 | ASSIGNED TO EXAMINER |
Monday, January 10, 2022 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Monday, January 10, 2022 | LETTER OF SUSPENSION E-MAILED |
Monday, January 10, 2022 | SUSPENSION LETTER WRITTEN |
Saturday, January 8, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, January 7, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, January 7, 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, July 16, 2021 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, July 16, 2021 | NON-FINAL ACTION E-MAILED |
Friday, July 16, 2021 | NON-FINAL ACTION WRITTEN |
Wednesday, July 7, 2021 | ASSIGNED TO EXAMINER |
Monday, March 29, 2021 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Monday, January 4, 2021 | NEW APPLICATION ENTERED |