
| Serial Number | 88176265 |
| Word Mark | NEUCO NEW ENGLAND UTILITY CONSTRUCTORS INC. |
| Filing Date | Wednesday, October 31, 2018 |
| Status | 700 - REGISTERED |
| Status Date | Tuesday, January 21, 2020 |
| Registration Number | 5964750 |
| Registration Date | Tuesday, January 21, 2020 |
| Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | Tuesday, November 5, 2019 |
| Description of Mark | The mark consists of the wording "neuco" in black with an orange image of the New England map partially above and partially within the letter "u", all above the orange words "NEW ENGLAND UTILITY CONSTRUCTORS INC." The color white represents background and/or transparent areas and is not claimed as a feature of the mark. |
| Goods and Services | Installation, repair, replacement and maintenance of utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware systems; Underground infrastructure construction, namely, trenching in the nature of subsurface excavation and trench construction for new utilities; Restoration in the field of utilities, namely, restoration of utility pipe networks; Replacement of utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware and septic systems; Pipe milling and pavement milling services; Road surface preparation, namely, road paving services for removing and replacing road pavement materials, road pavement sealing, road pavement stripping and traffic lane painting for roadway overlays and repairs; Installation of pipelines and below ground cable using trenchless technology methods, namely, tunneling, micro- tunneling (MTM), horizontal directional drilling (HDD), directional boring, pipe ramming (PR), pipe jacking (PJ), moling, horizontal auger boring (HAB)and other below ground methods with minimal excavation; Vacuum excavation services; Construction services, namely, industrial fabrication and construction of energy pipelines and storage structures; Underground infrastructure construction, namely, trenching in the nature of subsurface excavation and trench construction for new utilities; Replacement of utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware and septic systems; Repair of existing utilities, namely, utility cables, electricity distribution networks, water and gas distribution networks, and sanitary systems; Laying and construction of pipelines; Pipeline construction and maintenance; Pipeline construction; Pipe laying services |
| Section 2(f) Limitation Statement | as to "NEW ENGLAND" |
| Indication of Colors claimed | The color(s) orange is/are claimed as a feature of the mark. |
| NOT AVAILABLE | "UTILITY CONSTRUCTORS INC." |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Thursday, November 15, 2018 |
| Primary Code | 037 |
| First Use Anywhere Date | Thursday, November 30, 2017 |
| First Use In Commerce Date | Thursday, November 30, 2017 |
| Party Name | CENTURI GROUP, INC. |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 03 - Corporation |
| Address | PHOENIX, AZ 85027 |
| Party Name | CENTURI GROUP, INC. |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 03 - Corporation |
| Address | PHOENIX, AZ 85027 |
| Party Name | CENTURI GROUP, INC. |
| Party Type | 11 - New Owner Before Publication |
| Legal Entity Type | 03 - Corporation |
| Address | PHOENIX, AZ 85027 |
| Party Name | Centuri Construction Group, Inc. |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 03 - Corporation |
| Address | Phoenix, AZ 85027 |
| Event Date | Event Description |
| Saturday, November 3, 2018 | NEW APPLICATION ENTERED |
| Thursday, November 15, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Friday, November 16, 2018 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
| Wednesday, February 6, 2019 | ASSIGNED TO EXAMINER |
| Tuesday, February 19, 2019 | NON-FINAL ACTION WRITTEN |
| Tuesday, February 19, 2019 | NON-FINAL ACTION E-MAILED |
| Tuesday, February 19, 2019 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Monday, July 15, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Monday, July 15, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Monday, July 15, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, September 3, 2019 | NON-FINAL ACTION WRITTEN |
| Tuesday, September 3, 2019 | NON-FINAL ACTION E-MAILED |
| Tuesday, September 3, 2019 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Tuesday, September 3, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, September 3, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, September 3, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Wednesday, September 4, 2019 | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP |
| Sunday, September 29, 2019 | EXAMINERS AMENDMENT -WRITTEN |
| Sunday, September 29, 2019 | EXAMINERS AMENDMENT E-MAILED |
| Sunday, September 29, 2019 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
| Sunday, September 29, 2019 | EXAMINER'S AMENDMENT ENTERED |
| Sunday, September 29, 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, October 16, 2019 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Tuesday, November 5, 2019 | PUBLISHED FOR OPPOSITION |
| Tuesday, November 5, 2019 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Tuesday, January 21, 2020 | REGISTERED-PRINCIPAL REGISTER |
| Friday, December 9, 2022 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
| Friday, December 9, 2022 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
| Friday, December 9, 2022 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Tuesday, January 21, 2025 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |