
| Serial Number | 79237337 |
| Word Mark | MW M+W GROUP |
| Filing Date | Friday, September 22, 2017 |
| Status | 700 - REGISTERED |
| Status Date | Tuesday, July 2, 2019 |
| Registration Number | 5790451 |
| Registration Date | Tuesday, July 2, 2019 |
| Mark Drawing | 5 - Drawing with word(s) / letter(s) / number(s) in Stylized form |
| Published for Opposition Date | Tuesday, April 16, 2019 |
| Goods and Services | Technical planning of building technology and process technology installations for the air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; performance of technical inspections of statutory operability of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; building technology services, namely, performance of technical inspections of operability of building technology installations and of technical production and process flow; technical planning and consultancy therefor relating to implementation of production process and flow in the field of microelectronics, the pharmaceutical industry and the food industry; technical planning and consultancy therefor relating to environmentally-friendly microelectronics manufacture; technological consultancy for the implementation of environmentally-friendly microelectronics manufacture; technical consultancy in the redesigning of semi-conductor factories; technical consultancy for improving ecological efficiency and energy saving and recycling technology; technical planning of semi-conductor factories; technical planning, performance of technical inspection, also with regard to legal requirements, as well as certification of clean rooms and all types of technical building equipment at the stages of planning, installation, function and performance, and of the documentation therefore in the context of technical project management and performance of technical inspections; technical planning of building and process technology installations |
| Goods and Services | Building construction supervision; maintenance in the field of repair and cleaning of semi-conductor factories; construction of semi-conductor factories; installation of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; implementation of maintenance and inspection facilities and/or projects in the context of monitoring maintenance and inspection intervals stipulated by the manufacturer and repair and maintenance of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus |
| Description of Mark | The mark consists of a white letter "M" with a blue border and a blue letter "W", all above the blue wording "M+W GROUP". |
| Pseudo Mark | MEISSNER WURST MEISSNER PLUS WURST GROUP; MEISSNER WURST MEISSNER ADD WURST GROUP |
| Goods and Services | Electronic apparatus and instruments for controlling, regulating and monitoring heating, air conditioning and ventilating installations for use in clean room installations; electronic control, regulating and monitoring apparatus and instruments, namely, thermostats, monitors and recording devices, measuring and control devices for pressure, temperature, consumption, and speed, all for control and monitoring of building and supply components, namely, air conditioners, clean rooms, clean air suppliers, and filter fan units; computers and computer programs for monitoring and/or automating building control technology |
| NOT AVAILABLE | "GROUP" |
| Indication of Colors claimed | The color(s) blue and white is/are claimed as a feature of the mark. |
| Goods and Services | electric fans, filters for the industrial air purification, air filter ventilator units, lights, ventilating apparatus for air conditioning as well as air conditioning apparatus, all being for use in clean rooms, climatic chambers, clean room ceilings, rotation locks and tunnel locks; all the aforementioned goods fitted to the use in grid ceilings, walls, floors, covering plates and partitions; heating and air conditioning installations for building technology; refrigerating, heating, drying and ventilating installations, equipment and apparatus; air conditioning equipment and apparatus and installations consisting of thereof; dust, solvent vapour and oil mist extraction and separating apparatus and installations, all being for use in clean room installations or for use in the treatment of atmospheric gases; electric fans for the aforementioned goods |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 27, 2018 |
| Primary Code | 009 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
| US Class Codes | 013, 021, 023, 031, 034 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 27, 2018 |
| Primary Code | 011 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 27, 2018 |
| Primary Code | 037 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 27, 2018 |
| Primary Code | 042 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | M+W Group GmbH |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | DE |
| Party Name | M+W Group GmbH |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | DE |
| Party Name | M+W Group GmbH |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | DE |
| Event Date | Event Description |
| Thursday, July 26, 2018 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Friday, July 27, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Friday, July 27, 2018 | ASSIGNED TO EXAMINER |
| Monday, July 30, 2018 | NON-FINAL ACTION WRITTEN |
| Tuesday, July 31, 2018 | APPLICATION FILING RECEIPT MAILED |
| Tuesday, July 31, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Tuesday, August 14, 2018 | REFUSAL PROCESSED BY MPU |
| Tuesday, August 14, 2018 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Saturday, September 1, 2018 | REFUSAL PROCESSED BY IB |
| Friday, February 1, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
| Tuesday, February 12, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, February 12, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, February 13, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Monday, March 4, 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, March 27, 2019 | NOTICE OF PUBLICATION |
| Tuesday, April 16, 2019 | PUBLISHED FOR OPPOSITION |
| Friday, April 19, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
| Tuesday, July 2, 2019 | REGISTERED-PRINCIPAL REGISTER |
| Wednesday, October 2, 2019 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Friday, October 4, 2019 | FINAL DISPOSITION PROCESSED |
| Friday, October 4, 2019 | FINAL DISPOSITION NOTICE SENT TO IB |
| Friday, October 25, 2019 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Friday, November 14, 2025 | NEW REPRESENTATIVE AT IB RECEIVED |