Serial Number | 79182712 |
Word Mark | MAMMUT |
Filing Date | Monday, June 8, 2015 |
Status | 713 - CANCELLED - SECTION 18 |
Status Date | Wednesday, July 10, 2019 |
Registration Number | 5547716 |
Registration Date | Tuesday, August 28, 2018 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, November 21, 2017 |
Indication of Colors claimed | The color(s) blue, red and white is/are claimed as a feature of the mark. |
Description of the Colors Claimed | Blue: term "MAMMUT", most part of the depicted mammoth, and lower one of the two depicted angles; red: upper one of the two depicted angles; white: remainder of the depicted mammoth and background. |
Goods and Services | Building and construction materials and elements of metal for construction of buildings and structures, namely, metal panels, boards, sheets, pillars, posts, joists, studs, beams, trusses, rafters, blocks, brackets, laths, lintels, latticework, railings, cornices, braces, shores, supports and trim moldings for building, architectural metal work, metal trim for buildings, metal sheathing, cladding and siding for buildings, metal rebars, rods and mesh for reinforcing concrete, metal tiles, panels, boards, sheets and trim moldings for walls, floors, ceilings or roofs of buildings, metal frames and frameworks for building, roofing materials of metal, flooring materials of metal, metal gutters and gutter pipes, metal pipes for water, steam or gas, pipeworks of metal, metal pipe fittings, metal ducts for heating and ventilation, metal conduits, non-electric cables of metal, wires of common metal, metal chimneys, chimney caps, chimney covers and chimney cowls, window blinds of metal, stairs of metal, metal countertops, drywall corner bead of metal, metal building partitions, metal awnings and canopies, metal fascia, metal decking, and metal materials for constructing floors, walls or ceilings; unprocessed and semi-processed materials of metal for construction of buildings and structures, namely, metals and alloys of metal, metal reinforcement materials for building, and sheets, rods, bars, tubes, posts, pillars, beams, profiles, wires and meshes of common metal for building; metal hardware, namely metal fasteners, metal structural members, metal fittings, and metal ornamental members for construction of buildings and structures; doors, gates, windows and shutters of metal; structures and transportable buildings of metal; statues and works of art of common metals; containers, and transportation and packaging articles, of metal; parts and fittings for all the aforementioned goods |
Goods and Services | Building and construction materials and elements, not of metal, for construction of buildings and structures, namely, cement, concrete, mortar, grout, plaster, stucco, cobbles, bricks, pavers and stone for building, non-metal reinforcement materials for building, non-metal panels, boards, sheets, rods, bars, tubes, pillars, posts, joists, studs, beams, trusses, rafters, blocks, brackets, laths, lintels, latticework, railings, cornices, braces, shores, supports, profiles and trim moldings for building, architectural woodwork, non-metal trim for buildings, non-metal sheathing, cladding and siding for buildings, non-metal tiles, panels, boards, sheets and trim moldings for walls, floors, ceilings or roofs of buildings, non-metal frames and frameworks for building, non-metal roofing materials, non-metal flooring materials, non-metal gutters and gutter pipes, non-metal pipes for water, steam or gas, non-metal pipeworks, non-metal pipe fittings, non-metal ducts for heating and ventilation, non-metal conduits, non-metal chimneys, chimney caps, chimney covers and chimney cowls, non-metal window blinds, non-metal stairs, non-metal countertops, drywall corner bead not of metal, non-metal building partitions, non-metal awnings and canopies, non-metal fascia, non-metal decking, non-metal materials for constructing floors, walls or ceilings, composite panels primarily of non-metal materials, concrete-based slabs, concrete floors and walls, and glass panes and panels for building; doors, gates, windows and shutters, not of metal; structures and transportable buildings, not of metal; unprocessed and semi-processed materials, not specified for use, namely, pitch, tar, bitumen and asphalt, stone, rock, clay and minerals, wood and artificial wood; statues and works of art, of stone, concrete or marble; parts and fittings for all the aforementioned goods |
Translation of Words in Mark | The English translation of "MAMMUT" in the mark is "Mammoth". |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 3 - Sec. 18 - Entire Registration |
Class Status Date | Wednesday, July 10, 2019 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 3 - Sec. 18 - Entire Registration |
Class Status Date | Wednesday, July 10, 2019 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | NOT AVAILABLE |
Party Type | 30 - Original Registrant |
Legal Entity Type | 01 - Individual |
Address | AE |
Party Name | NOT AVAILABLE |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 01 - Individual |
Address | AE |
Party Name | NOT AVAILABLE |
Party Type | 10 - Original Applicant |
Legal Entity Type | 01 - Individual |
Address | AE |
Event Date | Event Description |
Friday, June 19, 2020 | TOTAL INVALIDATION PROCESSED BY THE IB |
Thursday, May 21, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Thursday, May 21, 2020 | INVALIDATION PROCESSED |
Tuesday, March 10, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Wednesday, July 10, 2019 | CANCELLED SECTION 18-TOTAL |
Wednesday, July 10, 2019 | CANCELLATION TERMINATED NO. 999999 |
Tuesday, July 9, 2019 | CANCELLATION GRANTED NO. 999999 |
Wednesday, March 27, 2019 | CANCELLATION INSTITUTED NO. 999999 |
Friday, December 28, 2018 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Monday, December 10, 2018 | FINAL DISPOSITION NOTICE SENT TO IB |
Monday, December 10, 2018 | FINAL DISPOSITION PROCESSED |
Wednesday, November 28, 2018 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, August 28, 2018 | REGISTERED-PRINCIPAL REGISTER |
Friday, July 20, 2018 | TTAB RELEASE CASE TO TRADEMARKS |
Friday, July 20, 2018 | OPPOSITION TERMINATED NO. 999999 |
Friday, July 20, 2018 | OPPOSITION SUSTAINED NO. 999999 |
Friday, April 13, 2018 | REFUSAL PROCESSED BY IB |
Thursday, March 29, 2018 | OPPOSITION INSTITUTED NO. 999999 |
Thursday, March 22, 2018 | OPPOSITION NOTICE (IB REFUSAL) SENT TO IB |
Thursday, March 22, 2018 | OPPOSITION NOTICE (IB REFUSAL) CREATED |
Thursday, December 14, 2017 | EXTENSION OF TIME TO OPPOSE RECEIVED |
Tuesday, November 21, 2017 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, November 21, 2017 | PUBLISHED FOR OPPOSITION |
Wednesday, November 1, 2017 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Friday, October 6, 2017 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, September 21, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, September 20, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, September 20, 2017 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Friday, August 4, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, July 19, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, July 19, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Wednesday, April 12, 2017 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Wednesday, April 12, 2017 | FINAL REFUSAL E-MAILED |
Wednesday, April 12, 2017 | FINAL REFUSAL WRITTEN |
Wednesday, April 5, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, April 4, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, April 4, 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, October 13, 2016 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, October 13, 2016 | NON-FINAL ACTION E-MAILED |
Thursday, October 13, 2016 | NON-FINAL ACTION WRITTEN |
Friday, September 9, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, September 8, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, September 8, 2016 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Saturday, March 26, 2016 | REFUSAL PROCESSED BY IB |
Tuesday, March 8, 2016 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, March 8, 2016 | REFUSAL PROCESSED BY MPU |
Saturday, March 5, 2016 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, March 4, 2016 | NON-FINAL ACTION WRITTEN |
Friday, March 4, 2016 | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW |
Wednesday, March 2, 2016 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, March 1, 2016 | NON-FINAL ACTION WRITTEN |
Tuesday, March 1, 2016 | APPLICATION FILING RECEIPT MAILED |
Thursday, February 25, 2016 | ASSIGNED TO EXAMINER |
Thursday, February 25, 2016 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Tuesday, February 23, 2016 | SN ASSIGNED FOR SECT 66A APPL FROM IB |