Serial Number | 79232686 |
Word Mark | M MOUNTING SYSTEMS |
Filing Date | Wednesday, November 8, 2017 |
Status | 700 - REGISTERED |
Status Date | Tuesday, February 5, 2019 |
Registration Number | 5667856 |
Registration Date | Tuesday, February 5, 2019 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, November 20, 2018 |
Description of Mark | The mark consists of a stylized "M" rotated 90 degrees above the wording "MOUNTING SYSTEMS". |
Goods and Services | Photovoltaic appliances and plants made thereof, namely, sun collectors and solar panels for power generation and electronic cabling; electric control and regulating units for solar plants and photovoltaics; both for in-plant flow of operations and for the positioning control of the collectors and modules |
Goods and Services | Building materials made of metal in the nature of metal reinforcement materials, fastening material made of metal in the nature of bolts, nails, rivets, screws, fastening clamps and fastening clips; supporting frames, framing, posts, piles and masts, profiles and frames all made of metal, transportable structures made of metal; all the aforementioned building materials, in particular for photovoltaic and thermal solar plants as on-roof mounting system, in-roof mounting system and flat roof or open-air mounting system |
Goods and Services | Installation, maintenance and repair of plants, machines and parts for the generation of renewable energy; roofing services |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "MOUNTING SYSTEMS" |
Goods and Services | Services provided by engineers, carrying-out of technical measuring work, services provided by a building contractor, namely, the technical preparation in the nature of surveying building projects, preparation of technical expert opinions in the nature of technological consulting, engineering planning and counselling, all in the field of development and design of photovoltaic and thermal solar plants |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, May 29, 2018 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, May 29, 2018 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, May 29, 2018 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, May 29, 2018 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Mounting Systems GmbH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 16 - Limited Liability Company |
Address | DE |
Party Name | Mounting Systems GmbH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | DE |
Party Name | Mounting Systems GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | DE |
Event Date | Event Description |
Monday, February 5, 2024 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Saturday, April 16, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, June 21, 2019 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Saturday, June 1, 2019 | FINAL DISPOSITION NOTICE SENT TO IB |
Saturday, June 1, 2019 | FINAL DISPOSITION PROCESSED |
Sunday, May 5, 2019 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, February 5, 2019 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, November 20, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, November 20, 2018 | PUBLISHED FOR OPPOSITION |
Saturday, November 17, 2018 | NOTIFICATION PROCESSED BY IB |
Wednesday, October 31, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, October 31, 2018 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, October 31, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, October 10, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, September 19, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, September 18, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, September 18, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, July 20, 2018 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, June 30, 2018 | REFUSAL PROCESSED BY IB |
Wednesday, June 13, 2018 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Wednesday, June 13, 2018 | REFUSAL PROCESSED BY MPU |
Wednesday, June 6, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, June 5, 2018 | NON-FINAL ACTION WRITTEN |
Saturday, June 2, 2018 | APPLICATION FILING RECEIPT MAILED |
Tuesday, May 29, 2018 | ASSIGNED TO EXAMINER |
Tuesday, May 29, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, May 24, 2018 | SN ASSIGNED FOR SECT 66A APPL FROM IB |