Serial Number | 79386973 |
Word Mark | LUXEN ENERGY |
Filing Date | Friday, October 20, 2023 |
Status | 641 - NON-FINAL ACTION - MAILED |
Status Date | Friday, June 28, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Wires, electric; relays, electric; current rectifiers; electrolysis apparatus for laboratory use; solar batteries; solar panels for the production of electricity; modules for photovoltaic power generation; photovoltaic cells; plates for batteries; solar-powered battery chargers |
NOT AVAILABLE | "ENERGY" |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Friday, January 5, 2024 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Luxen Solar Energy Co., Ltd. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | CN |
Event Date | Event Description |
Wednesday, June 5, 2024 | ASSIGNED TO EXAMINER |
Saturday, June 15, 2024 | NON-FINAL ACTION WRITTEN |
Thursday, January 4, 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, January 5, 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, January 9, 2024 | APPLICATION FILING RECEIPT MAILED |
Friday, June 28, 2024 | REFUSAL PROCESSED BY MPU |
Sunday, June 16, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, June 28, 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Saturday, July 20, 2024 | REFUSAL PROCESSED BY IB |