Serial Number | 79259376 |
Word Mark | LS ENERGY SOLUTIONS |
Filing Date | Tuesday, February 12, 2019 |
Status | 700 - REGISTERED |
Status Date | Tuesday, May 26, 2020 |
Registration Number | 6060986 |
Registration Date | Tuesday, May 26, 2020 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, March 10, 2020 |
Certificate of Correction for Registration | In the Statement, class 9 has been corrected per the Fnote dated 8/23/2021. |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "ENERGY SOLUTIONS" |
Description of Mark | The mark consists of the wording "LS ENERGY SOLUTIONS" with an arrow appearing above the letter "S" in "LS". |
Goods and Services | Gas insulated switchgears; gas insulated transformers; gas insulated electrical switches; electronic control apparatus, being gas shut-off apparatus; electrical relays; high voltage switchgears; industrial factory automation controllers; recorded computer software for electricity distribution, regulating energy consumption, and energy automation and control, all in the field of energy management; recorded computer operating programs; air circuit breakers; earth leakage circuit breakers; digital protective relays; visualization software for use in local and remote automatic and computer controlled processes in the nature of graphical representation; molded transformers; circuit breakers for wiring; switchboards; distribution automation machines and apparatus for electricity distribution, regulating energy consumption, and energy automation and control, all in the field of energy management; transformers; * electronic control systems for * distributed control system (DCS) for machines; electrical distribution boards for industrial purposes; water supply and drainage treatment installation controllers; energy storage system (ESS) comprised of batteries, computer hardware to charge and manage battery control power levels and inverters; thermal imaging camera; remote electric meter reading machines and apparatus; electric telemetering controllers; hydraulic electricity transformers; inverters; electric servo motor controllers; electric power monitoring controllers; electric power system simulators; watt hour meters; electrical load controllers; computer programs for use in analysis relating to the causes of faults of electrical power installations; machines and apparatus for diagnosis of power installation in the nature of inverters; electric power protective controllers; power control system (PCS) comprised of computer hardware to remotely control and monitor the power status of servers; power control unit (PCU) for electricity distribution, regulating energy consumption, and energy automation and control, all in the field of energy management; magnetic switches in the nature of electric relays; electronic motor protection relays; electromagnetic contactors; electronic switchboards; energy management system apparatus and computer software, namely, BEMS (Building Energy Management System), FEMS (Factory Energy Management System), HEMS (Home Energy Management System) comprised of electric and remote controls for monitoring and management of battery performance and storage; electrical distribution boards for houses; vacuum interrupters in the nature of electrical switches that uses electrical contacts in a vacuum; vacuum circuit breakers; * electric control devices for * supervisory control and data acquisition systems (SCADA systems) comprising computer hardware for monitoring and controlling energy flow and use; railway signal installation controllers; * electric control devices for * railway automatic fare collection controllers; * electric control devices for* railway communications installation controllers; high-voltage direct current systems (HVDC systems) comprised of high-voltage power supplies, high voltage multipliers, high voltage reactors and high voltage transformers; maximum demand electric power controllers; solar batteries; solar cell panels; programmable logic controller (PLC); program control machines and apparatus in the nature of Electronic controllers for use with power converters and Power controllers; electrical protocol converters; current limiting power fuse; circuit breakers |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, May 29, 2019 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | LS Corp. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | Seoul KR |
Party Name | LS Corp. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | Seoul KR |
Party Name | LS Corp. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Seoul KR |
Event Date | Event Description |
Tuesday, August 24, 2021 | LIMITATION FROM THE IB EXAMINED AND ENTERED |
Tuesday, August 24, 2021 | CORRECTION UNDER SECTION 7 ¿ PROCESSED |
Friday, August 13, 2021 | LIMITATION OF GOODS RECEIVED FROM IB |
Saturday, October 17, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, September 24, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, September 24, 2020 | FINAL DISPOSITION PROCESSED |
Wednesday, August 26, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, May 26, 2020 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, March 10, 2020 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, March 10, 2020 | PUBLISHED FOR OPPOSITION |
Saturday, March 7, 2020 | NOTIFICATION PROCESSED BY IB |
Wednesday, February 19, 2020 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, February 19, 2020 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, February 19, 2020 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Monday, February 3, 2020 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, January 31, 2020 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, January 31, 2020 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, January 31, 2020 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, January 9, 2020 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, January 9, 2020 | NON-FINAL ACTION E-MAILED |
Thursday, January 9, 2020 | NON-FINAL ACTION WRITTEN |
Thursday, January 9, 2020 | NON-FINAL ACTION WRITTEN |
Wednesday, December 18, 2019 | EXAMINER'S AMENDMENT ENTERED |
Wednesday, December 18, 2019 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Wednesday, December 18, 2019 | EXAMINERS AMENDMENT E-MAILED |
Wednesday, December 18, 2019 | EXAMINERS AMENDMENT -WRITTEN |
Wednesday, November 27, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, November 26, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, November 26, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, November 20, 2019 | CORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED |
Friday, October 25, 2019 | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
Thursday, August 29, 2019 | CORRECTION TRANSACTION RECEIVED FROM IB |
Friday, July 19, 2019 | REFUSAL PROCESSED BY IB |
Friday, July 12, 2019 | CORRECTION TRANSACTION RECEIVED FROM IB |
Thursday, June 20, 2019 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, June 20, 2019 | REFUSAL PROCESSED BY MPU |
Tuesday, June 4, 2019 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, June 4, 2019 | APPLICATION FILING RECEIPT MAILED |
Monday, June 3, 2019 | NON-FINAL ACTION WRITTEN |
Wednesday, May 29, 2019 | ASSIGNED TO EXAMINER |
Wednesday, May 29, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, May 23, 2019 | SN ASSIGNED FOR SECT 66A APPL FROM IB |