Serial Number | 87447481 |
Word Mark | LOOKING AHEAD, GOING BEYOND EXPECTATIONS AHEAD BEYOND |
Filing Date | Friday, May 12, 2017 |
Status | 710 - CANCELLED - SECTION 8 |
Status Date | Friday, March 14, 2025 |
Registration Number | 5553076 |
Registration Date | Tuesday, September 4, 2018 |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, June 19, 2018 |
Description of Mark | The mark consists of the wording "Looking ahead, going beyond expectations" in black arrayed above the wording "Ahead Beyond" in blue wherein a red arrow is disposed between the words "Ahead" and "Beyond." |
Goods and Services | Pumps, namely, volute pumps, axial-flow pumps, mixed-flow pumps, vortex pumps, gear pumps, submersible motor pumps, vacuum pumps, screw pumps, vane pumps, nuclear recirculation water pumps, ultrahigh-pressure hydraulic pumps, ultrahigh- temperature hydraulic pumps, cryogenic submersible hydraulic pumps, pumps as parts of machines, motors and engines, standard hydraulic pumps, centrifugal pumps, reciprocating hydraulic pumps, rotary pumps; boiler feed pumps; pumps for pumping water and water with solids, namely, water drainage pumps; vacuum pumps; high-pressure pumps for washing appliances and installations and for use in oil or gas well hydraulic fracturing operations; pneumatic or hydraulic machines and instruments, namely, centrifugal compressors, axial-flow compressors, fans for motors and engines, namely, standard fans, centrifugal fans, axial-flow fans, mixed-flow fans, multiple-vane fans, blowers, namely, centrifugal blowers, rotary blowers, axial flow blowers, turbo blowers, compressors, namely, reciprocating compressors, rotary compressors, axial flow compressors, turbo compressors; semiconductor manufacturing machines and systems comprising machinery for manufacturing semiconductors, gas abatement systems, ozonized water generations, ultrahigh-concentration clean ozonizers, clean pumps, chemical mechanical polishing systems, wafer plating systems, bevel polishing equipment |
Indication of Colors claimed | The color(s) red, blue and black is/are claimed as a feature of the mark. |
Goods and Services | Freezing machines and apparatus, namely, absorption refrigeration chillers, direct fired absorption chiller heaters, centrifugal refrigeration chillers, refrigeration screw chillers, heat pump chilling units, water cooling towers, radiator type air-cooled cooling chillers, thermally insulated cooling units for storing ice, gas refrigerators, ice machines, refrigerating machines, cooling evaporators, cooling domes, freezers, refrigerator and freezer cases; air-conditioning apparatus for industrial purposes; garbage incinerators for industrial purposes; industrial boilers not for parts of motor machines or engines; fans for air conditioning, air supply, exhaust air, ventilation, and smoke exhaust, namely, standard fans, centrifugal fans, axial-flow fans, mixed-flow fans, multiple-vane fans |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | 2 - Sec. 8 - Entire Registration |
Class Status Date | Friday, March 14, 2025 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | 2 - Sec. 8 - Entire Registration |
Class Status Date | Friday, March 14, 2025 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Ebara Corporation |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | Ota-ku, Tokyo JP |
Party Name | Ebara Corporation |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | Ota-ku, Tokyo JP |
Party Name | Ebara Corporation |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Ota-ku, Tokyo JP |
Event Date | Event Description |
Tuesday, May 16, 2017 | NEW APPLICATION ENTERED |
Wednesday, May 17, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, May 18, 2017 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Monday, June 12, 2017 | TEAS VOLUNTARY AMENDMENT RECEIVED |
Tuesday, July 18, 2017 | ASSIGNED TO LIE |
Friday, July 21, 2017 | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED |
Thursday, August 10, 2017 | ASSIGNED TO EXAMINER |
Wednesday, August 16, 2017 | NON-FINAL ACTION E-MAILED |
Wednesday, August 16, 2017 | NON-FINAL ACTION WRITTEN |
Wednesday, August 16, 2017 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, December 14, 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, December 18, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, December 18, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, January 5, 2018 | SUSPENSION LETTER WRITTEN |
Friday, January 5, 2018 | LETTER OF SUSPENSION E-MAILED |
Friday, January 5, 2018 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Friday, April 6, 2018 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
Monday, April 9, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, April 9, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, May 7, 2018 | PRIORITY ACTION WRITTEN |
Monday, May 7, 2018 | PRIORITY ACTION E-MAILED |
Monday, May 7, 2018 | NOTIFICATION OF PRIORITY ACTION E-MAILED |
Monday, May 14, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, May 15, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, May 15, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, May 16, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, May 30, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Tuesday, June 19, 2018 | PUBLISHED FOR OPPOSITION |
Tuesday, June 19, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, September 4, 2018 | REGISTERED-PRINCIPAL REGISTER |
Monday, September 4, 2023 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
Friday, March 14, 2025 | CANCELLED SEC. 8 (6-YR) |