Serial Number | 79413344 |
Word Mark | LES |
Filing Date | Wednesday, November 13, 2024 |
Status | 661 - RESPONSE AFTER NON-FINAL ACTION - ENTERED |
Status Date | Monday, August 25, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Construction services, namely, general building contractor services; building construction services; construction, building, installation and repair services with regard to installation and repair of refractory building material, refractory linings, prefabricated building components, industrial furnaces, industrial kilns, rotary kilns and industrial high temperature aggregates; consultancy and information in relation to the aforesaid services, included in this class. |
Goods and Services | Analysis of the status of refractory linings; analysis of the status of used refractory linings; analysis of the status of used refractory linings in industrial furnaces and kilns; analysis of the status of used refractory linings in rotary kilns; industrial analysis; analysis of scientific and technology services; engineering services; research and development services in the field of engineering; technical project studies, namely, conducting scientific feasibility studies; materials testing; chemical and physical analysis, technological analysis services in the field of refractory building material, refractory linings, furnaces, industrial furnaces, industrial high-temperature aggregates, industrial installations for the melting of metals, industrial automation installations, machinery, technical installations, machinery installations, industrial plant, prefabricated components, computer hardware systems, manufacturing processes, computer systems used in industrial settings, industrial materials and machinery; services for the provision of technological information; scientific and industrial research, namely, scientific research, analysis and testing in the field of refractory building material, refractory linings, furnaces, industrial furnaces, industrial high-temperature aggregates, industrial installations for the melting of metals, industrial automation installations, machinery, technical installations, machinery installations, industrial plant, prefabricated components, computer hardware systems, manufacturing processes, computer systems used in industrial settings, industrial materials and machinery; consultancy and information in relation to the aforesaid services, included in this class. |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, December 26, 2024 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, December 26, 2024 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Refractory Intellectual Property GmbH & |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | AT |
Event Date | Event Description |
Thursday, December 26, 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Sunday, December 29, 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Sunday, December 29, 2024 | APPLICATION FILING RECEIPT MAILED |
Thursday, March 6, 2025 | ASSIGNED TO EXAMINER |
Thursday, March 13, 2025 | NON-FINAL ACTION WRITTEN |
Friday, March 14, 2025 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Thursday, April 24, 2025 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, April 24, 2025 | REFUSAL PROCESSED BY MPU |
Monday, August 25, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, August 25, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, August 25, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, May 9, 2025 | REFUSAL PROCESSED BY IB |