Serial Number | 79089097 |
Word Mark | LEMMINKÄINEN |
Filing Date | Wednesday, March 17, 2010 |
Status | 404 - IR CANCELLED - US REGISTRATION CANCELLED |
Status Date | Wednesday, March 18, 2020 |
Registration Number | 4169679 |
Registration Date | Tuesday, July 10, 2012 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, April 24, 2012 |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Common metals and their alloys; metal building materials, namely, profiles, tubes, scaffolds, building flashings, chimneys, claddings for building and construction, metal roofs and roofings, stair cases, prefabricated platforms, prefabricated metal bridges, metal wall frames and panels, metal gates, metal doors, metal windows and window casements, metal piles and armour steel; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery in the nature of small items of metal hardware, namely, metal sash fasteners for windows, bolts, nails, rivets, screws, brads, clamps, cotter pins, ball lock pins, white metal pins, nuts; pipes and tubes of metal; metal safes; metal ores; metal wire fences, gates and latch bars; metal stands for audience, namely, metal stands for audience seating and metal bleachers, and metal grating; metal gutters; metal roofings |
Goods and Services | Non-metallic building materials, namely, sawn timber and un-sawn timber for use in construction industries; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; bituminous roofing materials and waterproofing products, namely, bitumen roofing membranes, bitumen shingles, bitumen roofing sealants and fixatives; concrete covering stones, ceramic and concrete tiles, edging, fences, walls and wall stones, concrete breeze-blocks, non-metal water channels in the nature of gutters for roofs, balconies, streets and yards; non-metal construction materials, namely, cups for collecting rain water; gouge slabs of concrete, non-metal exterior stairs, concrete driving hindrances and bollards, staircase units of mosaic concrete, natural stone or concrete, steps in the nature of non-metal stairs; and cement chair slabs; building materials, namely, asphalt and bitumen roof coating; non-metallic fences, gates and latch bars |
Goods and Services | Building construction; building repair; installation services in the field of residential construction, commercial and office construction, namely, installation of electrical systems, HVAC systems, plumbing systems, fire protection systems, alarm systems, lighting systems, cooling systems, heating systems, telecommunication systems, data network systems, security systems, automation systems, irrigation systems, and structural and decorative building elements and components, namely, building timber, building stones, building glass, concrete blocks, bricks, pavers, posts, slabs, panels, beams, girders, drywall, columns, paving stones, tiles, walls, wall forms, facades, floor slabs, flooring, shutters, shingles, siding, pipes, paneling, gutters, windows and window frames, doors and door frames, fireplaces, chimneys, stairs, and staircases, ceilings, and roofing; construction of industrial and logistic buildings, underground structures, parking structures, underground sport facilities, roads, bridges, railroads and tunnels; construction of sports and recreational facilities; infrastructure construction of roads, streets and rail networks; residential building construction services, municipal infrastructure construction services, water supply infrastructure construction services, sewer infrastructure construction services, public transportation infrastructure construction services, bridge infrastructure construction services, airport infrastructure construction services, pedestrian tunnels infrastructure construction services, and noise barrier infrastructure construction services; infrastructure building construction services; installation, repair and maintenance services related to technical building services; consulting services related to residential construction, infrastructure construction and installation, repair and maintenance of technical building services; repair and maintenance services of real estate; quarrying, crushing and screening of minerals aggregate; construction services, namely, asphalt paving and foundation structuring; installations, maintenance and repair of automation systems; metal and steel structures construction; building of telecommunications networks |
Translation of Words in Mark | The wording "LEMMINKÄINEN" has no meaning in a foreign language. |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 15, 2019 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 15, 2019 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 15, 2019 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | YIT Oyj |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 99 - Other |
Address | FI |
Party Name | Lemminkäinen Oyj |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | FI |
Party Name | Lemminkäinen Oyj |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | FI |
Party Name | Lemminkäinen Oyj |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | FI |
Event Date | Event Description |
Friday, October 2, 2020 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED |
Friday, October 2, 2020 | DEATH OF INTERNATIONAL REGISTRATION |
Friday, December 13, 2019 | TOTAL INVALIDATION PROCESSED BY THE IB |
Tuesday, November 5, 2019 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Tuesday, November 5, 2019 | INVALIDATION PROCESSED |
Tuesday, October 15, 2019 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, February 15, 2019 | CANCELLED SECTION 71 |
Thursday, October 25, 2018 | CHANGE OF OWNER RECEIVED FROM IB |
Thursday, August 30, 2018 | NEW REPRESENTATIVE AT IB RECEIVED |
Monday, July 10, 2017 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Saturday, May 11, 2013 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, December 1, 2012 | NOTIFICATION PROCESSED BY IB |
Sunday, November 4, 2012 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Wednesday, October 17, 2012 | FINAL DISPOSITION NOTICE SENT TO IB |
Wednesday, October 17, 2012 | FINAL DISPOSITION PROCESSED |
Wednesday, October 10, 2012 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, July 10, 2012 | REGISTERED-PRINCIPAL REGISTER |
Friday, May 18, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Tuesday, April 24, 2012 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, April 24, 2012 | PUBLISHED FOR OPPOSITION |
Wednesday, April 18, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, April 18, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Wednesday, April 4, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, April 4, 2012 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, April 4, 2012 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, March 21, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Monday, March 19, 2012 | EXPARTE APPEAL TERMINATED |
Monday, March 19, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, March 1, 2012 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, March 1, 2012 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, February 29, 2012 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Wednesday, February 29, 2012 | EX PARTE APPEAL-INSTITUTED |
Wednesday, February 29, 2012 | JURISDICTION RESTORED TO EXAMINING ATTORNEY |
Wednesday, February 29, 2012 | EXPARTE APPEAL RECEIVED AT TTAB |
Tuesday, December 27, 2011 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED |
Tuesday, December 27, 2011 | CONTINUATION OF FINAL REFUSAL E-MAILED |
Tuesday, December 27, 2011 | ACTION CONTINUING A FINAL - COMPLETED |
Wednesday, November 30, 2011 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, November 30, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, November 7, 2011 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Wednesday, August 31, 2011 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Wednesday, August 31, 2011 | FINAL REFUSAL E-MAILED |
Wednesday, August 31, 2011 | FINAL REFUSAL WRITTEN |
Wednesday, August 10, 2011 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, August 10, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, July 29, 2011 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Sunday, January 30, 2011 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Sunday, January 30, 2011 | NON-FINAL ACTION E-MAILED |
Sunday, January 30, 2011 | NON-FINAL ACTION WRITTEN |
Wednesday, January 12, 2011 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, January 12, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, January 12, 2011 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Tuesday, January 11, 2011 | ASSIGNED TO LIE |
Tuesday, December 21, 2010 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, December 17, 2010 | REFUSAL PROCESSED BY IB |
Wednesday, December 1, 2010 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Wednesday, December 1, 2010 | REFUSAL PROCESSED BY MPU |
Tuesday, November 30, 2010 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, November 29, 2010 | NON-FINAL ACTION WRITTEN |
Friday, November 26, 2010 | APPLICATION FILING RECEIPT MAILED |
Monday, November 22, 2010 | ASSIGNED TO EXAMINER |
Monday, November 22, 2010 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Friday, November 19, 2010 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
Thursday, November 18, 2010 | SN ASSIGNED FOR SECT 66A APPL FROM IB |