Serial Number | 90688829 |
Word Mark | LEGACY GROUP CONSTRUCTION |
Filing Date | Tuesday, May 4, 2021 |
Status | 605 - ABANDONED - EXPRESS AFTER PUB |
Status Date | Monday, July 17, 2023 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, May 23, 2023 |
Goods and Services | Dry ice blasting services; sand blasting; abrasive blasting services; grit blasting services; construction of refractory products for fireproofing in the nature of custom manufacturing of refractory products for fireproofing |
Description of Mark | The mark consists of the literal elements "LEGACY", "GROUP", and "CONSTRUCTION" in stylized lettering. The letter "G" in the literal element "LEGACY" is displayed in larger typeface than the remaining portion of the term "LEGACY" and in block style representation. Construction equipment, including a crane and dump truck, are positioned over and below the stylized letter "G". The literal element "GROUP" is positioned directly to the right of the stylized letter "G" in the literal element "LEGACY", to allow the stylized letter "G" to operate as the term's first letter. The literal element "CONSTRUCTION" is positioned below the literal elements "LEGACY" and "GROUP" and to the right of the stylized letter "G" and the construction equipment. The literal elements "GROUP" and "CONSTRUCTION" are displayed in smaller type face than the literal element "LEGACY". |
Goods and Services | Millwright services, namely, installation, maintenance and repair of industrial and mechanical equipment and machines, pier construction, harbor construction, marine construction, and industrial scaffolding; construction services, namely, excavation and backfill; concrete structure construction, installation, maintenance, and repair; shotcrete and gunite structure construction, installation, maintenance, and repair; steel structure construction, installation, maintenance, and repair; pier construction; harbor construction; marine construction; industrial scaffolding construction and installation; dredging; hydraulic dredging; underwater dredging; hydraulic excavation; installation of forms for concrete and metallic rebar; installation, maintenance, and repair of refractory products for fireproofing; installation, maintenance, and repair of engineered shoring equipment; installation, maintenance, and repair of structural barriers, erosion control barriers, eco-barriers, breakwaters, structural barriers for coastline restoration and erosion control, and structural barriers for wildlife habitat creation and protection; installation and maintenance of shelter structures, in the nature of metal-framed shelter structures, modular metal structures with flexible covers for commercial and industrial use by workers in power plants; sanitation in the nature of cleaning of buildings and structures, and disinfection of building facilities; providing disinfection and cleaning systems and procedures in the nature of consultancy relating to sanitizing building facilities, disinfecting building interiors, building cleaning services, and laundry services; restoration, maintenance, and repair of conveyors, carousels, hoists, presses for industrial purposes, pumps, electric compressors, injection molds, fans for industrial purposes, turbines, and condensers; general construction contracting; construction consultancy; construction site layout in the nature of construction planning; plant construction, maintenance, and construction project management services for businesses in the energy production and transmission sector; water blasting services in the nature of high pressure washing services; core drilling services, namely, drilling or cutting concrete, dirt, or brick materials |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Business project management for construction projects |
Disclaimer with Predetermined Text | "GROUP CONSTRUCTION" |
International Class | 035 - Advertising; business management; business administration; office functions. |
US Class Codes | 100, 101, 102 |
Class Status Code | 8 - Abandoned |
Class Status Date | Monday, July 17, 2023 |
Primary Code | 035 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 8 - Abandoned |
Class Status Date | Monday, July 17, 2023 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 8 - Abandoned |
Class Status Date | Monday, July 17, 2023 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Legacy Group Construction, LLC |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | Newport, MI 48166 |
Party Name | Legacy Group Construction, LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Newport, MI 48166 |
Event Date | Event Description |
Tuesday, October 3, 2023 | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS |
Tuesday, October 3, 2023 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Tuesday, October 3, 2023 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Tuesday, October 3, 2023 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Monday, July 17, 2023 | ABANDONMENT NOTICE E-MAILED - AFTER PUBLICATION |
Monday, July 17, 2023 | ABANDONMENT - AFTER PUBLICATION |
Friday, July 14, 2023 | ABANDONMENT NOTICE E-MAILED - AFTER PUBLICATION |
Friday, July 14, 2023 | ABANDONMENT - AFTER PUBLICATION |
Wednesday, July 12, 2023 | TEAS EXPRESS ABANDONMENT RECEIVED |
Thursday, June 22, 2023 | EXTENSION OF TIME TO OPPOSE RECEIVED |
Tuesday, May 23, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, May 23, 2023 | PUBLISHED FOR OPPOSITION |
Wednesday, May 3, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Friday, April 14, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Monday, March 6, 2023 | EXAMINER'S AMENDMENT ENTERED |
Monday, March 6, 2023 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Monday, March 6, 2023 | EXAMINERS AMENDMENT E-MAILED |
Monday, March 6, 2023 | EXAMINERS AMENDMENT -WRITTEN |
Thursday, September 8, 2022 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Thursday, September 8, 2022 | FINAL REFUSAL E-MAILED |
Thursday, September 8, 2022 | FINAL REFUSAL WRITTEN |
Saturday, July 16, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, July 15, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, July 15, 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, May 26, 2022 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, May 26, 2022 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Thursday, May 26, 2022 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Saturday, January 15, 2022 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Saturday, January 15, 2022 | NON-FINAL ACTION E-MAILED |
Saturday, January 15, 2022 | NON-FINAL ACTION WRITTEN |
Thursday, January 6, 2022 | ASSIGNED TO EXAMINER |
Friday, August 6, 2021 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Thursday, August 5, 2021 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, July 8, 2021 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, July 8, 2021 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Thursday, July 8, 2021 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Friday, May 7, 2021 | NEW APPLICATION ENTERED |