Serial Number | 79213900 |
Word Mark | KOROK BUILDING SYSTEMS |
Filing Date | Wednesday, May 10, 2017 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Thursday, November 1, 2018 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "BUILDING SYSTEMS" |
Goods and Services | metal and predominantly metal transportable buildings; metal and predominantly metal building panels; metal and predominantly metal building materials for use in cladding, namely, cladding of metal for building; metal floors and metal flooring; metal and predominantly metal building materials for floors, namely, metal floor panels, boards and tiles; metal and predominantly metal building materials for walls, namely, metal wall tiles, boards and claddings; metal roofing; metal and predominantly metal building materials for roofs, namely, metal roofing panels, shingles and tiles; metal and predominantly metal building materials in sheet form; structural parts and fittings for the foregoing |
Goods and Services | non-metallic transportable buildings; non-metallic building panels; non-metallic building materials for use in cladding, namely, non-metal cladding for building; non-metal floors and flooring; non-metallic building materials for floors, namely, non-metal floor panels, boards and tiles; non-metallic building materials for walls, namely, non-metal wall tiles, boards and claddings; non-metal roofing; non-metallic building materials for roofs, namely, non-metal roofing panels, shingles and tiles; non-metallic building materials in sheet form, namely, facing sheets of plywood; concrete panels; concrete floors; concrete walls; concrete retaining walls; concrete slabs; structural parts and fittings for the foregoing |
Goods and Services | Building construction, repair and maintenance services; hire, rental and leasing services in relation to products, machines and equipment for use in connection with building and construction; information, advisory and consultancy services relating to the foregoing services |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, August 11, 2017 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, August 11, 2017 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, August 11, 2017 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | ALPHA HOLDINGS LIMITED |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | NZ |
Event Date | Event Description |
Friday, November 22, 2019 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, November 1, 2019 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, November 1, 2019 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Friday, February 1, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, January 16, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, January 16, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Thursday, November 1, 2018 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Thursday, November 1, 2018 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Friday, June 22, 2018 | NEW REPRESENTATIVE AT IB RECEIVED |
Monday, April 2, 2018 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Monday, April 2, 2018 | NON-FINAL ACTION E-MAILED |
Monday, April 2, 2018 | NON-FINAL ACTION WRITTEN |
Wednesday, February 28, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, February 28, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, February 28, 2018 | ASSIGNED TO LIE |
Friday, February 16, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, September 1, 2017 | REFUSAL PROCESSED BY IB |
Thursday, August 17, 2017 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, August 17, 2017 | REFUSAL PROCESSED BY MPU |
Wednesday, August 16, 2017 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, August 15, 2017 | NON-FINAL ACTION WRITTEN |
Tuesday, August 15, 2017 | APPLICATION FILING RECEIPT MAILED |
Friday, August 11, 2017 | ASSIGNED TO EXAMINER |
Friday, August 11, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, August 10, 2017 | SN ASSIGNED FOR SECT 66A APPL FROM IB |