
| Serial Number | 79084216 |
| Word Mark | JUWI |
| Filing Date | Monday, March 8, 2010 |
| Status | 707 - PARTIAL SECTION 71 ACCEPTED |
| Status Date | Friday, December 8, 2023 |
| Registration Number | 4219861 |
| Registration Date | Tuesday, October 9, 2012 |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, July 24, 2012 |
| Goods and Services | [ Providing of training in the fields of the energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; providing of training and workshops in the fields of the manufacture, installation and repair of power-generating apparatus; publication of books and brochures in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; arranging and conducting educational conferences, meetings, and seminars in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development ] |
| Goods and Services | [ Soil processing and treatment; environmental remediation services in the nature of treatment of topsoil and other nutritious soil; treatment of waste, in particular the conversion of waste in the ground; processing and treatment of wood, oil, gas, natural resources and fuels for the generation of energy and current; assembly of vehicles and electric vehicles for others; electricity generation; power generation through the use of water; power generation through the use of geothermal energy ] |
| Translation of Words in Mark | The word "JUWI" has no meaning in a foreign language. |
| Goods and Services | [Electronic sensors for measuring solar radiation; apparatus and instruments for generating, distributing or accumulating electricity, namely, electric power supplies; apparatus and instruments for the supervision, remote control, checking and measuring of electricity and energy consumption and for the operation of power stations, namely, remote control software and hardware, instruments for measuring electricity and energy consumption, and energy meters; apparatus and instruments for transforming electricity, namely, electric voltage transformer; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, rechargeable batteries and switchgears; apparatus for analyzing signals, current and voltage, namely, electronic monitors and monitor modules for monitoring electric current and electrical signals and voltage monitor modules; apparatus for overvoltage protection against lightning strikes, namely, voltage surge protectors; electric cables, electric connection equipment, namely, electric connectors, electric transformers for the distribution and generation of electricity and energy; solar cells; photovoltaic modules; data processing equipment, namely, data processors, software and recorded computer programs for use in the generation, distribution, storage and control of energy and electricity] |
| Goods and Services | [ Electrical power generators using solar cells; wind mills, wind power plants, wind turbines and other wind-operated machines, namely, wind turbines; spare parts and accessories for the aforesaid goods, namely, wind turbine towers and masts, rotor blades, rotor hubs, housings, machine foundations, rotation device, yaw rings and gearboxes; replacement parts and accessories for the aforesaid goods] |
| Goods and Services | [Utility services, namely, transmission and distribution of electricity; utility services, namely, transmission and distribution of electricity and electrical energy; information services with regard to the aforesaid services] |
| Goods and Services | [ Wood-based fuels, in particular wood pellets ] |
| Goods and Services | Construction of power stations, [windmills, wind farms, wind turbines and other wind-powered machines, biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations; [construction of charging and service stations for electric vehicles;] installation of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, [other wind-powered machines, biogas installations,] [geothermal power plants, hydroelectric power stations,] [pump storage systems] maintenance and repair of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, [geothermal power plants, hydroelectric power stations,] pump storage systems; installation, maintenance and repair of power stations and power station systems, and installation, maintenance and repair of electrical equipment; construction of power stations; construction of charging and service stations for electric vehicles; consultancy and information in connection with all the aforesaid services |
| Goods and Services | [Insurance administration, financial affairs, namely, financial consulting, monetary affairs, namely, monetary exchange, real estate brokerage;] real estate procurement for others, namely, procurement of suitable sites for power stations |
| Goods and Services | [Business management for the energy sector; advertising agencies; business management in the field of energy; providing office functions in the energy sector;] professional business management and commercial management of the financing, construction and operational management of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations and photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations |
| Goods and Services | [ Legal consultancy with regard to energy projects; legal services, namely, providing legal assistance with regard to approval procedures for power stations ] |
| Goods and Services | [Heating equipment, namely, boilers, fermenters, being parts of biogas installations; fireplaces; solar thermal installations, namely, solar thermal modules, photovoltaic installations, namely, photovoltaic-based plants, geothermal installations, namely, geothermal-based HVAC units, hydro-electric power plants; pump storage installations, namely, hydrogen generators; waste processing plants] |
| Goods and Services | Technical planning of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations] ; technical consultancy with regard to development and design of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations]; development of power stations, specialist engineering services and consultancy in the field of engineering; [research and development of new products in the field of renewable energies; geological calculations for the extraction of natural resources for the generation of energy and energy products; preparation of technical reports regarding the optimization of the production of renew able energy and the energy saving, and product development in the power and energy section; research and consultancy in the field of environmental protection and environmental impact assessment with regard to power stations and the energy sector; technical monitoring of the energy performance of apparatus, installations and buildings; development of technical materials, namely, drafting of construction plans used to construct photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, geothermal installations, hydroelectric power stations, pump storage installations and power stations all in the energy sector;] design of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations [; design of vehicles and electric vehicles; design of charging and service stations for electric vehicles; measurement evaluations in the fields of wind power, biogas and solar energy systems] |
| International Class | 004 - Industrial oils and greases; lubricants; dust absorbing, wetting and binding compositions; fuels (including motor spirit) and illuminants; candles and wicks for lighting. |
| US Class Codes | 001, 006, 015 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Monday, October 22, 2018 |
| Primary Code | 004 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
| US Class Codes | 013, 019, 021, 023, 024, 031, 034, 035 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Friday, December 8, 2023 |
| Primary Code | 007 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Friday, December 8, 2023 |
| Primary Code | 009 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
| US Class Codes | 013, 021, 023, 024, 031, 034 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Friday, December 8, 2023 |
| Primary Code | 011 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 035 - Advertising; business management; business administration; office functions. |
| US Class Codes | 100, 101, 102 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 23, 2010 |
| Primary Code | 035 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 036 - Insurance; financial affairs; monetary affairs; real estate affairs. |
| US Class Codes | 100, 101, 102 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 23, 2010 |
| Primary Code | 036 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, October 22, 2018 |
| Primary Code | 037 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 039 - Transport; packaging and storage of goods; travel arrangement. |
| US Class Codes | 100, 105 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Friday, December 8, 2023 |
| Primary Code | 039 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 040 - Treatment of materials. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Monday, October 22, 2018 |
| Primary Code | 040 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 041 - Education; providing of training; entertainment; sporting and cultural activities. |
| US Class Codes | 100, 101, 107 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Monday, October 22, 2018 |
| Primary Code | 041 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 23, 2010 |
| Primary Code | 042 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 045 - Legal services; security services for the protection of property and individuals; personal and social services rendered by others to meet the needs of individuals. |
| US Class Codes | 100, 101 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Monday, October 22, 2018 |
| Primary Code | 045 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | JUWI GmbH |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | DE |
| Party Name | juwi Holding AG |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | DE |
| Party Name | juwi Holding AG |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | DE |
| Event Date | Event Description |
| Thursday, July 22, 2010 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Friday, July 23, 2010 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Friday, July 23, 2010 | ASSIGNED TO EXAMINER |
| Monday, July 26, 2010 | NON-FINAL ACTION WRITTEN |
| Tuesday, July 27, 2010 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Tuesday, July 27, 2010 | APPLICATION FILING RECEIPT MAILED |
| Tuesday, July 27, 2010 | REFUSAL PROCESSED BY MPU |
| Tuesday, July 27, 2010 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Saturday, August 28, 2010 | REFUSAL PROCESSED BY IB |
| Monday, January 24, 2011 | PAPER RECEIVED |
| Thursday, January 27, 2011 | PAPER RECEIVED |
| Wednesday, February 2, 2011 | ASSIGNED TO LIE |
| Thursday, April 7, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Thursday, April 7, 2011 | AMENDMENT FROM APPLICANT ENTERED |
| Wednesday, April 27, 2011 | FINAL REFUSAL WRITTEN |
| Thursday, April 28, 2011 | FINAL REFUSAL MAILED |
| Wednesday, August 17, 2011 | PAPER RECEIVED |
| Tuesday, August 23, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, August 23, 2011 | AMENDMENT FROM APPLICANT ENTERED |
| Saturday, September 3, 2011 | REPORT UNRESPONSIVE AMENDMENT - COMPLETED |
| Tuesday, September 6, 2011 | NOTICE OF UNRESPONSIVE AMENDMENT - MAILED |
| Monday, October 24, 2011 | PAPER RECEIVED |
| Monday, October 31, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Monday, October 31, 2011 | AMENDMENT FROM APPLICANT ENTERED |
| Monday, November 21, 2011 | ACTION CONTINUING A FINAL - COMPLETED |
| Tuesday, November 22, 2011 | CONTINUATION OF FINAL REFUSAL MAILED |
| Wednesday, December 28, 2011 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Wednesday, December 28, 2011 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, June 19, 2012 | EXAMINERS AMENDMENT -WRITTEN |
| Tuesday, June 19, 2012 | EXAMINER'S AMENDMENT ENTERED |
| Tuesday, June 19, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Tuesday, June 19, 2012 | EXAMINERS AMENDMENT MAILED |
| Wednesday, June 20, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
| Wednesday, July 4, 2012 | NOTICE OF PUBLICATION |
| Wednesday, July 4, 2012 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, July 4, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, July 24, 2012 | PUBLISHED FOR OPPOSITION |
| Saturday, September 22, 2012 | NOTIFICATION PROCESSED BY IB |
| Tuesday, October 9, 2012 | REGISTERED-PRINCIPAL REGISTER |
| Wednesday, October 24, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Wednesday, January 9, 2013 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Monday, January 28, 2013 | FINAL DISPOSITION PROCESSED |
| Monday, January 28, 2013 | FINAL DISPOSITION NOTICE SENT TO IB |
| Tuesday, February 19, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Monday, October 8, 2018 | TEAS SECTION 71 RECEIVED |
| Wednesday, October 17, 2018 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Monday, October 22, 2018 | REGISTERED - PARTIAL SEC 71 ACCEPTED |
| Monday, October 22, 2018 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
| Friday, April 19, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
| Saturday, June 22, 2019 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Thursday, July 18, 2019 | INVALIDATION PROCESSED |
| Thursday, July 18, 2019 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
| Thursday, September 5, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
| Friday, October 18, 2019 | PARTIAL INVALIDATION PROCESSED BY THE IB |
| Thursday, February 20, 2020 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
| Thursday, March 26, 2020 | INTERNATIONAL REGISTRATION RENEWED |
| Saturday, October 9, 2021 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED |
| Saturday, October 29, 2022 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
| Monday, April 10, 2023 | TEAS SECTION 71 RECEIVED |
| Friday, July 28, 2023 | NEW REPRESENTATIVE AT IB RECEIVED |
| Thursday, November 16, 2023 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Friday, December 8, 2023 | REGISTERED - PARTIAL SEC 71 ACCEPTED |
| Friday, December 8, 2023 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
| Friday, August 9, 2024 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Tuesday, August 20, 2024 | GENERIC MADRID TRANSACTION CREATED |
| Tuesday, August 20, 2024 | GENERIC MADRID TRANSACTION SENT TO IB |
| Tuesday, October 1, 2024 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Wednesday, October 9, 2024 | INVALIDATION PROCESSED |
| Friday, October 11, 2024 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
| Saturday, November 23, 2024 | PARTIAL INVALIDATION PROCESSED BY THE IB |
| Friday, November 29, 2024 | PARTIAL INVALIDATION PROCESSED BY THE IB |